![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9046347 | Latitude | 27° 52' 6.0557 | ||||||||
Name |
CIRCLE K #2709800 10600 ROOSEVELT BLVD N |
Longitude | 82° 38' 45.481 | ||||||||
SAINT PETERSBURG, FL 33716-3802 | LL Method | DPHO | |||||||||
Contact | Andrew Burress | LL Status | REVIEWED | ||||||||
Phone | (984) 389-1258 | Status Date | 10/21/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 12/05/2006 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697924 - 06/29/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 02/23/2021 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 02/23/2021 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 02/23/2021 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Vehicular Diesel (D) | 02/23/2021 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 05/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Vehicular Diesel (D) | 05/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Unleaded Gas (B) | 05/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/28/2024 | 08/26/2025 | |||||||||
GUARANTEE | 04/30/2023 | 08/28/2024 | |||||||||
GUARANTEE | 04/24/2022 | 08/21/2023 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 12/08/2005 | 12/22/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/06/2005 | 12/22/2005 | IN-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 11/29/2004 | 11/30/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/23/2004 | 11/30/2004 | MINOR OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/09/2004 | 01/12/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/08/2004 | 01/12/2004 | MINOR OUT-OF-COMPLIANCE | PINK | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP PIPING | |||||||||||
NCLI | 09/15/2003 | 09/28/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 08/20/2003 | 08/25/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 07/01/2002 | 07/05/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/01/2002 | 07/05/2002 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 02/13/2002 | 02/25/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/11/2001 | 07/18/2001 | IN-COMPLIANCE | STRAUSS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/09/2001 | 05/25/2001 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 10/24/2000 | 11/01/2000 | COMPLIANCE ASSURANCE | ||||||||
EPI | 09/19/2000 | 09/19/2000 | HONEY_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/18/2000 | 08/01/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/28/2000 | 02/03/2000 | CASTOR | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/20/1999 | 01/03/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | CASTOR | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 09/11/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 09/11/2024 | Major Out of Compliance | PUHR_NM_1 | 0/3 | Routine Compliance | ||||||
Letter | 08/28/2024 | Satisfied | WIMBERLY_E | Enforcement | |||||||
Letter | 04/01/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 04/01/2024 | Minor Out of Compliance | PUHR_NM_1 | 0/3 | Complaint | ||||||
Record Document | 02/22/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 02/20/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 02/20/2024 | Minor Out of Compliance | PUHR_NM_1 | 0/3 | Component Installation | ||||||
Enforcement Referral | 10/19/2023 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 10/18/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 04/17/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 04/17/2023 | Minor Out of Compliance | COLSON_NJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/23/2023 | Satisfied | COLSON_NJ_1 | Installation | |||||||
Electronic Communication | 02/09/2023 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 06/09/2022 | In Compliance | COLSON_NJ_1 | 0/3 | Installation | ||||||
TCAR | 09/24/2021 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Letter | 09/24/2021 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Site Inspection | 04/20/2021 | In Compliance | COLSON_NJ_1 | 0/3 | Closure | ||||||
Site Inspection | 04/16/2021 | In Compliance | COLSON_NJ_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/15/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 11/19/2018 | Minor Out of Compliance | COLSON_NJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/19/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 11/05/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 06/23/2016 | In Compliance | COLSON_NJ_1 | 0/1 | Non-Compliance | ||||||
Issue Document | 06/23/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 02/08/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 02/08/2016 | Minor Out of Compliance | COLSON_NJ_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/28/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 12/09/2013 | In Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 03/05/2012 | In Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/05/2012 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 01/06/2011 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Site Inspection | 01/06/2011 | In Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Record Document | 12/29/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 12/21/2009 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/21/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 05/15/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Record Document | 04/27/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 04/23/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 04/23/2009 | Minor Out of Compliance | BARNETT_JX | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/23/2009 | Satisfied | BARNETT_JX | Routine Compliance | |||||||
Record Document | 06/30/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 06/11/2008 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Letter | 06/11/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/10/2008 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Record Document | 01/31/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
TCAR | 08/30/2007 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Letter | 07/16/2007 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Letter | 07/16/2007 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Letter | 07/16/2007 | Satisfied | ZWISSLER_JF | Non-Compliance | |||||||
Site Inspection | 07/16/2007 | Minor Out of Compliance | ROGGELIN_EM_1 | 0/3 | Installation | ||||||
Letter | 07/12/2007 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 07/10/2007 | Minor Out of Compliance | ROGGELIN_EM_1 | 0/3 | Closure | ||||||
TCAR | 06/25/2007 | Incomplete | STRAUSS_RH_1 | Closure | |||||||
Site Inspection | 05/19/2007 | Minor Out of Compliance | ROGGELIN_EM_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 04/05/2007 | Minor Out of Compliance | ZWISSLER_JF | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/11/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | *Repair opening in electrical conduit piping in the southern regular piping sump and provide documentation once completed. | |||||||
09/11/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | *Pump out the buckets and provide documentation. | |||||||
04/17/2023 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Remove accumulated liquids in the RUL spill bucket secondary and have the bucket vacuum tested per manufacturer specifications (Emco Wheaton = 30”WC for 1 min.). Submit the results of testing to this office once completed. | |||||||
No Discharges Found |