![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9046565 | Latitude | 27° 45' 20.3471 | ||||||||
Name |
HARBORAGE MARINA LLC 1500 2ND ST S |
Longitude | 82° 38' 5.7664 | ||||||||
SAINT PETERSBURG, FL 33701-5506 | LL Method | DPHO | |||||||||
Contact | GENERAL MANAGER | LL Status | REVIEWED | ||||||||
Phone | (727) 821-6347 | Status Date | 10/29/2003 | ||||||||
Account Owner Information | |||||||||||
Name | MAXIMO HARBORAGE MARINA LLC 1500 2ND ST SOUTH Saint Petersburg, FL 33701-5500 |
Effective Date | 04/13/2000 | ||||||||
Contact | SHAWN DUDLEY | ||||||||||
Phone | (727) 821-6347 | ||||||||||
CASSELSTINE@WATERVIEWMARINAS.COM | |||||||||||
Placard # / Date | 701713 - 10/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | HARBORAGE LAND LLC 11226 Indian Trl Dallas, TX 75229-3518 |
Effective Date | 08/18/2015 | ||||||||
Contact | MARSHALL FUNK | ||||||||||
Phone | (727) 821-6347 | ||||||||||
HARBORAGE@WATERVIEWMARINAS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 06/01/1990 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (F) Double wall (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system (X) No piping associated w/tank |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 6000 | Vehicular Diesel (D) | 06/01/1990 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (F) Double wall (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system (X) No piping associated w/tank |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/30/2023 | 05/30/2026 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 05/30/2020 | 05/30/2023 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 04/30/2017 | 04/30/2020 | INDIAN HARBOR | ||||||||
INSURANCE | 04/30/2014 | 04/30/2017 | INDIAN HARBOR | ||||||||
INSURANCE | 04/30/2011 | 04/30/2014 | GREENWICH | ||||||||
INSURANCE | 04/02/2008 | 04/02/2011 | GREENWICH | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
FR | 02/10/2006 | 02/10/2006 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RD VIOLATIONS CITED 11/10/06 CLOSED - ADDRESSED WITH ENF CASE CLOSED 7/05 | |||||||||||
RRBD | 11/14/2005 | 12/06/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 11/10/2005 | 11/22/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/10/2005 | 11/22/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FRAZIER | 0/2 | COMPLIANCE ASSURANCE | |||||
SV | 08/25/2005 | 10/18/2005 | FRAZIER | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INVESTIGATION OF COMPLAINT OF FUEL IN WATER - NO EVIDENCE OF TANK SYSTEM LEAKS | |||||||||||
CCD | 07/20/2005 | 07/25/2005 | RICCI_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
SCOE | 07/20/2005 | 07/25/2005 | RICCI_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
EPI | 06/13/2005 | 06/15/2005 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 11/05/2004 | 11/08/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 11/05/2004 | 11/29/2004 | BARNETT | 0/0 | TERMINAL FACILITY PROJECT | ||||||
DPRI | 11/04/2004 | 11/29/2004 | IN-COMPLIANCE | BARNETT | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 11/04/2004 | 11/08/2004 | IN-COMPLIANCE | BARNETT | 0/2 | COMPLIANCE ASSURANCE | |||||
CRDE | 06/11/2004 | 06/11/2004 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TEQA | 03/19/2004 | 07/01/2004 | IN-COMPLIANCE | RANDOLPH_L | 0/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/01/2004 | 04/13/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO CORRECTIONS | |||||||||||
RRBD | 02/16/2004 | 03/01/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SUBMITTAL OF LLD TEST RESULTS AND SENSOR TEST RESULTS - ALL O K 2/10/04 | |||||||||||
LTR | 02/10/2004 | 02/11/2004 | PINK | 0/0 | TERMINAL FACILITY PROJECT | ||||||
NCLI | 02/10/2004 | 02/16/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
DPRI | 02/09/2004 | 02/11/2004 | IN-COMPLIANCE | PINK | 0/0 | TERMINAL FACILITY PROJECT | |||||
Completion Notes CERTIFICATE ISSUED 2/10/04 | |||||||||||
TCI | 02/09/2004 | 02/16/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | PINK | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOTE FILL LINES-DW FRP; PRESSURIZED PIPING-ENVIRON DW FLEX | |||||||||||
RRBD | 03/04/2003 | 03/06/2003 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 03/03/2003 | 03/06/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/25/2003 | 03/06/2003 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP REMOTE FILL LINES, ENVIRON DW COAX, ENVIRON STP SUMP, MECHANICAL LLD, RED JACKET PPM2000 TANK INTERSTICE W/ SENSORS | |||||||||||
DPRI | 02/25/2003 | 03/06/2003 | IN-COMPLIANCE | STRAUSS | 0/0 | TERMINAL FACILITY PROJECT | |||||
RRBD | 06/11/2002 | 06/23/2002 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 05/31/2002 | 06/03/2002 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 04/23/2002 | 05/07/2002 | COMPLIANCE ASSURANCE | ||||||||
DPRI | 03/27/2002 | 06/14/2002 | IN-COMPLIANCE | TAM | 0/0 | TERMINAL FACILITY PROJECT | |||||
NCLI | 03/27/2002 | 04/08/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/25/2002 | 04/02/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 0/2 | COMPLIANCE ASSURANCE | |||||
DPRI | 03/21/2001 | 03/27/2001 | IN-COMPLIANCE | EASTMAN_T | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 12/20/2000 | 12/28/2000 | IN-COMPLIANCE | CASTOR | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/19/2000 | 06/05/2000 | CASTOR | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/23/2000 | 03/24/2000 | MINOR OUT-OF-COMPLIANCE | CASTOR | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 12/12/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Site Inspection | 12/12/2024 | Major Out of Compliance | PUHR_NM_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/21/2024 | Satisfied | VIXAYO_A | Enforcement | |||||||
Enforcement Referral | 03/30/2023 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 02/10/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/10/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 12/09/2022 | Major Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/09/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 11/03/2022 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 10/30/2020 | Major Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/30/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/08/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Enforcement Tracking | 10/30/2018 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||||||
Letter | 10/29/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Letter | 10/23/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 10/23/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 10/08/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 06/25/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Enforcement Referral | 06/01/2018 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 05/24/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 05/24/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 02/08/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 02/08/2018 | Minor Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/22/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 01/21/2016 | Satisfied | PEDIGO_L | Routine Compliance | |||||||
Issue Document | 10/02/2015 | Satisfied | COLSON_NJ_1 | Installation | |||||||
Site Inspection | 10/02/2015 | In Compliance | COLSON_NJ_1 | 0/1 | Installation | ||||||
Issue Document | 10/02/2015 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Site Inspection | 10/02/2015 | In Compliance | COLSON_NJ_1 | 0/2 | Closure | ||||||
Site Inspection | 09/16/2015 | Minor Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/16/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Phone Conversation | 08/31/2015 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 11/25/2013 | In Compliance | STRAUSS_RH_1 | 0/2 | Closure | ||||||
Site Inspection | 11/25/2013 | In Compliance | STRAUSS_RH_1 | 0/2 | Installation | ||||||
Issue Document | 11/25/2013 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Site Inspection | 11/22/2013 | In Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Issue Document | 11/22/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 11/01/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 08/16/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 08/16/2013 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 09/06/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 08/26/2011 | In Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Discharge Reporting | 04/05/2011 | Satisfied | LASHBROOK_SJ_1 | Discharge | |||||||
Site Inspection | 09/02/2010 | In Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Issue Document | 08/13/2010 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 08/12/2010 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 08/12/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Issue Document | 07/26/2010 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 11/16/2009 | In Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Record Document | 11/16/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 09/15/2009 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/15/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 07/23/2008 | In Compliance | BARNETT_JX | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 05/08/2008 | Closed With Enforcement | RANDOLPH_L | Enforcement | |||||||
Site Inspection | 03/20/2008 | In Compliance | LONGEN_JL_1 | 0/2 | Non-Compliance | ||||||
Record Document | 02/29/2008 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
TCAR | 02/13/2008 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Letter | 02/13/2008 | Satisfied | STRAUSS_RH_1 | Discharge | |||||||
Site Inspection | 01/22/2008 | In Compliance | MARSH_L | 0/2 | QA/QC | ||||||
Enforcement Referral | 01/04/2008 | Accepted | RANDOLPH_L | Enforcement | |||||||
Record Document | 01/04/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 12/12/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Installation | ||||||
Letter | 12/12/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 11/30/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 11/30/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Closure | ||||||
Letter | 10/22/2007 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 07/31/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Letter | 07/31/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/12/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | *Perform the required testing and submit documentation to this office for review. | |||||||
12/12/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | *Repair the opening and submit a photo/documentation to this office for review. | |||||||
12/12/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | *Perform testing of the Monitoring Panel and Sensors and submit results to this office for review. | |||||||
12/12/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | *Submit an explanation/resolution for the two interstitial alarms and be sure to record an explanation/resolution for all future alarms. | |||||||
12/12/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Violation resolved with the submission of passing test results dated 12/02/2024. | |||||||
12/09/2022 | 6060 | SNC-B | 4.11 Release detection methods do not meet monitoring requirements. | Establish a proper release detection method for the Diesel tank interstice. Notify this office once corrected. | |||||||
12/09/2022 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Be sure to perform release detection inspections every month & no more than 35 days apart. Maintain records on file for at least 36 months. Begin proper inspection of the Diesel tank interstice by either repairing the electronic monitoring or gain access to perform manual checks of the interstitial space. Submit inspection results to this office for consecutive months, showing proper documentation is now being recorded. | |||||||
12/09/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the broken pipe. Hydro test the sump following repairs. Submit work receipt(s) and post-repair test results to this office for review. | |||||||
12/09/2022 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Submit current operability test results for the (4) liquid sensors and Veeder Root monitoring panel. | |||||||
12/09/2022 | 6017 | Minor | 4.4 All incident records, including test results not kept until storage tank system closure. | Submit explanations & resolution documentation for the (6) unexplained tank interstice alarms. Alternatively, have integrity tests performed on both of the tank interstices & submit results to this office. | |||||||
12/09/2022 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Submit current test results for the (2) mechanical line leak detectors. | |||||||
12/09/2022 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | Reprogram the L4 Diesel Tank Interstice sensor. Submit resolution documentation once corrected. | |||||||
12/09/2022 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Reposition the piping within the blueprint of the liner or create a means for any potential line leaks to be directed back into the under dispenser containment. | |||||||
12/09/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Submit current integrity (vacuum) test results for the two double walled spill buckets. | |||||||
10/30/2020 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Submit current copies of integrity (hydro) test results for the (2) STP sumps and the (2) piping transition sumps. | |||||||
10/30/2020 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Submit the missing test results, if found. Submit current operability test results for the overfill protection devices to this office for review. | |||||||
10/30/2020 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Submit current copies of integrity (hydro) test results for the (2) dispenser liners. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/05/1990 | INACTIVE | 6 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-PARTIAL | ||||||||