![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Walton | Status | OPEN | ||||||||
ID | 9046689 | Latitude | 30° 41' 19.4812 | ||||||||
Name |
BIG BOSS V LLC 40 COY BURGESS LOOP |
Longitude | 86° 7' 24.1419 | ||||||||
DEFUNIAK SPRINGS, FL 32433 | LL Method | DPHO | |||||||||
Contact | JOE DOBSON | LL Status | REVIEWED | ||||||||
Phone | (850) 598-7788 | Status Date | 09/21/2023 | ||||||||
Account Owner Information | |||||||||||
Name | BIG BOSS STORES LLC 66 N HOLIDAY RD Miramar Beach, FL 32550 |
Effective Date | 07/12/2010 | ||||||||
Contact | RUPERT E PHILLIPS | ||||||||||
Phone | (850) 650-5201 | ||||||||||
FRANK@BIGBOSSSTORES.COM | |||||||||||
Placard # / Date | 701380 - 09/12/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BIG BOSS STORES LLC 66 N HOLIDAY RD Miramar Beach, FL 32550 |
Effective Date | 07/30/2010 | ||||||||
Contact | RUPERT E PHILLIPS | ||||||||||
Phone | (850) 650-5201 | ||||||||||
FRANK@BIGBOSSSTORES.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 20000 | Unleaded Gas (B) | 07/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 04/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 04/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 04/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/30/2024 | 07/30/2025 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2023 | 07/30/2024 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2022 | 07/30/2023 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2020 | 07/30/2021 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2019 | 07/30/2020 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2017 | 07/30/2018 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2016 | 07/30/2016 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 07/30/2016 | 07/30/2017 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 08/23/2015 | 07/30/2016 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 08/23/2012 | 08/23/2013 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 08/23/2012 | 08/23/2012 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/20/2010 | 11/20/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/10/2008 | 11/10/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/12/2005 | 10/21/2005 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/04/2004 | 11/09/2004 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/28/2003 | 10/29/2003 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
CNLI | 09/29/2003 | 09/30/2003 | J. SCOTT HALE | 0/0 | DISCHARGE PROJECT | ||||||
TIN | 09/23/2003 | 09/26/2003 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCDI | 08/08/2003 | 09/26/2003 | IN-COMPLIANCE | J. SCOTT HALE | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/16/2002 | 10/30/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/11/2001 | 01/11/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/30/2001 | 12/18/2001 | MINOR OUT-OF-COMPLIANCE | STEVENSON_JS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/24/2000 | 11/08/2000 | IN-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/14/2000 | 04/20/2000 | HUTCHERSON_VP | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/24/2000 | 03/01/2000 | MINOR OUT-OF-COMPLIANCE | HUTCHERSON_VP | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 04/07/1999 | 05/04/1999 | IN-COMPLIANCE | METZLER_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/20/2025 | Accepted | VOLK_MP_1 | Enforcement | |||||||
Record Document | 02/05/2025 | Satisfied | VOLK_MP_1 | Compliance Assistance | |||||||
Letter | 11/20/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 11/19/2024 | Major Out of Compliance | VOLK_MP_1 | 0/1 | Routine Compliance | ||||||
Discharge Reporting | 11/13/2024 | Satisfied | GARTIN_D | Discharge | |||||||
Electronic Communication | 11/13/2024 | Satisfied | VOLK_MP_1 | Routine Compliance | |||||||
Electronic Communication | 11/07/2024 | Satisfied | VOLK_MP_1 | Routine Compliance | |||||||
Letter | 11/28/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
TCAR | 11/28/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Document Management | 11/28/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 11/28/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 11/27/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Document Management | 11/27/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 09/25/2023 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Site Inspection | 09/25/2023 | In Compliance | WILSON_ML_1 | 0/1 | Discharge | ||||||
Record Document | 09/25/2023 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Letter | 09/25/2023 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Site Inspection | 09/07/2023 | In Compliance | GARTIN_D | 0/1 | Component Installation | ||||||
Document Management | 08/31/2023 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Enforcement Tracking | 08/07/2023 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Electronic Communication | 08/07/2023 | Satisfied | MERRITT_S | Enforcement | |||||||
Letter | 06/08/2023 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 05/23/2023 | Accepted | GARTIN_D | Enforcement | |||||||
Record Document | 05/16/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 05/16/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 05/12/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Phone Conversation | 05/12/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 04/14/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 03/02/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 02/24/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 02/24/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/24/2023 | Major Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Issue Document | 06/23/2021 | Satisfied | WILSON_ML_1 | Installation | |||||||
Letter | 06/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 06/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 06/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
TCAR | 06/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 06/23/2021 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 06/14/2021 | In Compliance | KHAN_MR_1 | 0/1 | Installation | ||||||
Document Management | 02/22/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 02/22/2021 | Closed With Enforcement | MERRITT_S | Enforcement | |||||||
Document Management | 02/22/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 10/23/2020 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 07/27/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 07/27/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 07/23/2020 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/23/2020 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 08/08/2019 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 05/22/2019 | Accepted | PANGAHAS_RL_1 | Enforcement | |||||||
Letter | 07/18/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 07/18/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Issue Document | 07/18/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 07/18/2018 | Minor Out of Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 11/07/2017 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 06/13/2017 | Accepted | BRAZILE_DO_1 | Enforcement | |||||||
Letter | 09/12/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Letter | 08/08/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 08/05/2016 | Minor Out of Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 11/20/2015 | In Compliance | MERRITT_S | 0/1 | Enforcement | ||||||
Enforcement Tracking | 11/20/2015 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 01/23/2015 | Accepted | MERRITT_S | Enforcement | |||||||
Letter | 12/08/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Record Document | 11/05/2014 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 10/13/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/10/2014 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 10/09/2014 | Major Out of Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/07/2013 | In Compliance | BRAZILE_DO_1 | 0/1 | Non-Compliance | ||||||
Letter | 11/15/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 11/13/2012 | Minor Out of Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 09/28/2011 | Closed With Enforcement | BRISTOL_S | Enforcement | |||||||
Electronic Communication | 08/19/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 08/18/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 08/18/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Emergency Preparedness Information | 08/06/2011 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Electronic Communication | 08/05/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 08/03/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Letter | 08/01/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 07/29/2011 | Minor Out of Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/27/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 07/27/2011 | Satisfied | BRISTOL_S | Enforcement | |||||||
Discharge Reporting | 05/24/2011 | Satisfied | HALE_JS_1 | Discharge | |||||||
Site Inspection | 02/09/2011 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/09/2011 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Electronic Communication | 08/06/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 08/06/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Issue Document | 08/04/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 07/20/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 07/19/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Site Inspection | 03/10/2010 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/08/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Issue Document | 02/15/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 10/08/2009 | Accepted | BRISTOL_S | Enforcement | |||||||
Emergency Preparedness Information | 08/25/2009 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Site Inspection | 08/25/2009 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 08/12/2009 | In Compliance | THAYER_JD_1 | 0/1 | Installation | ||||||
Site Inspection | 08/11/2009 | In Compliance | HALE_JS_1 | 0/3 | Discharge | ||||||
Record Document | 07/23/2009 | Satisfied | HALE_JS_1 | Closure | |||||||
Site Inspection | 07/21/2009 | In Compliance | HALE_JS_1 | 0/3 | Closure | ||||||
Site Inspection | 09/29/2008 | In Compliance | HALE_JS_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/19/2008 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Site Inspection | 08/29/2007 | In Compliance | HALE_JS_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | HALE_JS_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 09/13/2006 | In Compliance | HALE_JS_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/19/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The facility has begun the process to replace the regular STP. Please send a work notification before starting work on the regular STP to Michael.Volk@flhealth.gov. | |||||||
11/15/2024 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Paint the premium spill bucket lid red. When completed provide photos or a detailed work invoice to Michael.Volk@flhealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/31/2023 | INACTIVE | HEFFERNAN_HA_1 | |||||||||
08/28/2023 | INACTIVE | ||||||||||
07/20/2009 | INACTIVE | 6 | |||||||||
07/01/2003 | INACTIVE | 6 | |||||||||