Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Fuel user/Non-retail | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9046925 | Latitude | 25° 53' 13.3366 | ||||||||
Name |
PALMETTO GENERAL HOSPITAL 2001 W 68TH ST |
Longitude | 80° 19' 35.1621 | ||||||||
HIALEAH, FL 33016-1801 | LL Method | DPHO | |||||||||
Contact | MICHELE THOMAN | LL Status | REVIEWED | ||||||||
Phone | (305) 823-5000 | Status Date | 02/15/2022 | ||||||||
Account Owner Information | |||||||||||
Name | STEWARD PALMETTO GEN HOSPITAL 2001 W 68TH ST HIALEAH, FL 33016 |
Effective Date | 09/03/2021 | ||||||||
Contact | MICHELE THOMAN | ||||||||||
Phone | (305) 823-5000 | ||||||||||
MICHELE.THOMAN@STEWARD.ORG | |||||||||||
Placard # / Date | 669803 - 09/14/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | STEWARD PALMETTO GEN HOSPITAL 2001 W 68TH ST HIALEAH, FL 33016 |
Effective Date | 09/03/2021 | ||||||||
Contact | MICHELE THOMAN | ||||||||||
Phone | (305) 823-5000 | ||||||||||
MICHELE.THOMAN@STEWARD.ORG | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 15000 | Emerg Generator Diesel (G) | 03/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (7) Automatically sampled wells (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Emerg Generator Diesel (G) | 03/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (7) Automatically sampled wells (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 15000 | Emerg Generator Diesel (G) | 07/01/1974 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(D) External protective coating | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Emerg Generator Diesel (G) | 07/01/1974 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1000 | Emerg Generator Diesel (G) | 07/01/1980 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (M) Manual tank gauging - USTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 1000 | Emerg Generator Diesel (G) | 03/01/1999 | ABOVEGROUND | Moved to New Site (M) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/29/2021 | 04/29/2024 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/01/2020 | 06/01/2021 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2019 | 06/01/2020 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2016 | 06/01/2017 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2014 | 06/01/2015 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 06/01/2012 | 06/01/2013 | HOSPITAL UNDERWRITING | ||||||||
INSURANCE | 06/01/2010 | 06/01/2011 | HOSPITAL UNDERWRITING | ||||||||
INSURANCE | 06/01/2009 | 06/01/2010 | HOSPITAL UNDERWRITING | ||||||||
INSURANCE | 06/01/2008 | 06/01/2009 | HOSPITAL UNDERWRITING | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 01/26/2006 | 01/30/2006 | IN-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 01/12/2006 | 01/27/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/10/2005 | 01/18/2005 | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/21/2004 | 01/03/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 09/17/2003 | 09/29/2003 | IN-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 04/16/2003 | 04/23/2003 | IN-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 03/06/2003 | 03/12/2003 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 09/09/2002 | 10/01/2002 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCR | 09/27/2001 | 10/01/2001 | IN-COMPLIANCE | DASHTAKI, K | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 09/07/2001 | 09/24/2001 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/05/2000 | 09/08/2000 | DASHTAKI, K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/27/2000 | 08/09/2000 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/21/2000 | 03/28/2000 | IN-COMPLIANCE | DASHTAKI, K | 1/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/22/1999 | 10/08/1999 | RONDON, K | 1/2 | COMPLIANCE ASSURANCE | ||||||
TCR | 09/22/1999 | 10/04/1999 | IN-COMPLIANCE | RONDON, K | 1/2 | COMPLIANCE ASSURANCE | |||||
TCI | 06/28/1999 | 07/07/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONDON, K | 1/2 | COMPLIANCE ASSURANCE | |||||
UTCI | 12/28/1998 | 01/05/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/28/2025 | Major Out of Compliance | RODRIGUEZ_F | 0/2 | Routine Compliance | ||||||
Letter | 02/28/2025 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Electronic Communication | 02/21/2025 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Letter | 06/14/2022 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 06/14/2022 | In Compliance | RODRIGUEZ_F | 0/2 | Compliance Assistance | ||||||
Letter | 02/28/2022 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 02/18/2022 | Minor Out of Compliance | RODRIGUEZ_F | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/15/2022 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Enforcement Tracking | 08/10/2020 | Closed Without Enforcement | GODWIN_MR_1 | Enforcement | |||||||
Letter | 08/05/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 08/04/2020 | In Compliance | GODWIN_MR_1 | 0/2 | Compliance Assistance | ||||||
Electronic Communication | 05/12/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Electronic Communication | 04/27/2020 | Satisfied | GODWIN_MR_1 | Enforcement | |||||||
Enforcement Referral | 04/24/2020 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Electronic Communication | 04/24/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Electronic Communication | 04/16/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Electronic Communication | 04/16/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Letter | 03/30/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 03/27/2020 | Major Out of Compliance | GODWIN_MR_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/05/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 03/03/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Site Inspection | 04/10/2017 | In Compliance | CRUZ_I_2 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 04/10/2017 | Satisfied | CRUZ_I_2 | Non-Compliance | |||||||
Site Inspection | 04/07/2017 | Major Out of Compliance | CRUZ_I_2 | 0/2 | Routine Compliance | ||||||
Letter | 04/07/2017 | Satisfied | CRUZ_I_2 | Non-Compliance | |||||||
Electronic Communication | 04/07/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 03/31/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Phone Conversation | 03/31/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 04/22/2015 | Satisfied | HOSU_C_1 | Routine Compliance | |||||||
Site Inspection | 04/09/2015 | In Compliance | HOSU_C_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 04/07/2015 | Satisfied | HOSU_C_1 | Routine Compliance | |||||||
Phone Conversation | 03/24/2015 | Satisfied | HOSU_C_1 | Routine Compliance | |||||||
Site Inspection | 10/06/2014 | In Compliance | DASHTAKI_K_1 | 0/2 | Installation | ||||||
Site Inspection | 11/15/2012 | In Compliance | RUNTE_C_3 | 1/2 | Routine Compliance | ||||||
Phone Conversation | 11/06/2012 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Site Inspection | 02/15/2011 | In Compliance | DASHTAKI_K_1 | 1/2 | Routine Compliance | ||||||
Site Inspection | 04/26/2010 | In Compliance | DASHTAKI_K_1 | 1/2 | Routine Compliance | ||||||
Letter | 04/01/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Enforcement Tracking | 04/01/2009 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 04/01/2009 | In Compliance | DASHTAKI_K_1 | 1/2 | Non-Compliance | ||||||
Site Inspection | 03/05/2009 | Minor Out of Compliance | DASHTAKI_K_1 | 1/2 | Non-Compliance | ||||||
Issue Document | 01/27/2009 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Enforcement Referral | 01/27/2009 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 01/27/2009 | Major Out of Compliance | DASHTAKI_K_1 | 1/2 | Routine Compliance | ||||||
Letter | 01/27/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 03/13/2008 | In Compliance | DASHTAKI_K_1 | 1/2 | Routine Compliance | ||||||
Site Inspection | 12/06/2007 | In Compliance | DASHTAKI_K_1 | 1/2 | Non-Compliance | ||||||
Site Inspection | 06/27/2007 | Minor Out of Compliance | DASHTAKI_K_1 | 1/2 | Routine Compliance | ||||||
Letter | 06/27/2007 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/28/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing integrity tests of STP Sumps | |||||||
02/28/2025 | 6005 | Minor | 2.4 Registration fees not paid (not receiving fuel). | Update the expired FDEP registration placard. | |||||||
02/28/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide a current certificate of financial responsibility (Pollution Liability Insurance) for your storage tank system | |||||||
No Discharges Found |