DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Citrus   Status    OPEN
 
ID 9063811   Latitude    28° 59' 13.6939
 
Name CIRCLE K #2722119
8486 N CARL G ROSEE HWY
Longitude    82° 21' 7.1529
  HERNANDO, FL 34442 LL Method    DPHO
 
Contact GRAHAM BIGGS   LL Status    REVIEWED
 
Phone (919) 774-6700   Status Date    02/07/2003
 
Account Owner Information
 
Name CIRCLE K STORES INC
1100 Situs Ct
Raleigh, NC 27606-5446
Effective Date    01/08/2016
 
Contact IRA LEWIS
 
Phone (423) 400-2480
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697932 - 06/29/2024
Property Owner Information
 
Name THE PANTRY INC
305 Gregson Dr
Cary, NC 27511-6496
Effective Date    03/13/2003
 
Contact BRENT PUZAK | RAMON INCIONG (386) 916-6267
 
Phone (919) 774-6700
 
Email GBIGGS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 12000 Unleaded Gas (B) 11/01/2006 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
6 16000 Unleaded Gas (B) 11/01/2006 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
2 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
3 8000 Unleaded Gas (B) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
4 3000 Vehicular Diesel (D) 02/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
7 8000 Vehicular Diesel (D) 11/01/2006 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/24/2022 08/21/2023
GUARANTEE   04/25/2021 04/25/2022
INSURANCE   12/01/2020 12/01/2021 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2015 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2014 11/01/2015 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2013 11/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2012 11/01/2013 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2011 11/01/2012 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   11/01/2010 11/01/2011 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   11/01/2009 11/01/2010 ENDURANCE AMERICAN SPECIALTY INS CO
INSURANCE   11/01/2008 11/01/2009 ENDURANCE AMERICAN SPECIALTY INS CO
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 12/13/2005 12/27/2005 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
TCI 02/15/2005 03/08/2005 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
TCI 04/13/2004 05/03/2004 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING IS SINGLE WALLED FIBERGLASS
 
TCI 12/18/2002 12/30/2002 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes SINGLE WALLED FIBERGLASS PIPING
 
TCI 12/12/2001 12/19/2001 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
TCI 01/16/2001 01/26/2001 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
TCI 02/24/2000 02/29/2000 IN-COMPLIANCE SUMNER_C 0/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
TCAR 01/09/2025 Satisfied LEE_MC_1 Closure
 
Letter 08/28/2024 Satisfied WIMBERLY_E Enforcement
 
Enforcement Referral 06/19/2024 Accepted MULLIGAN_PC_1 Enforcement
 
Letter 12/14/2023 Satisfied LEE_MC_1 Complaint
 
Site Inspection 12/14/2023 Minor Out of Compliance LEE_MC_1 0/2 Complaint
 
Electronic Communication 11/14/2023 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Electronic Communication 10/31/2023 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Electronic Communication 10/04/2023 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 08/17/2023 Minor Out of Compliance LEE_MC_1 0/2 Routine Compliance
 
Letter 08/17/2023 Satisfied LEE_MC_1 Compliance Assistance
 
Record Document 07/28/2022 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 03/29/2022 Major Out of Compliance MULLIGAN_PC_1 0/2 Routine Compliance
 
Letter 03/29/2022 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Incident 03/01/2021 Has not led to Discharge MULLIGAN_PC_1 Incident
 
Incident 09/22/2020 Has not led to Discharge MULLIGAN_PC_1 Incident
 
Document Management 09/22/2020 Satisfied MULLIGAN_PC_1 Incident
 
Document Management 07/09/2020 Satisfied MULLIGAN_PC_1 Incident
 
Letter 05/22/2020 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Record Document 05/22/2020 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Letter 02/25/2020 Satisfied MULLIGAN_PC_1 Compliance Assistance
 
Site Inspection 02/25/2020 Major Out of Compliance MULLIGAN_PC_1 0/2 Routine Compliance
 
Electronic Communication 01/28/2020 Satisfied MULLIGAN_PC_1 Routine Compliance
 
Document Management 03/14/2018 Satisfied ANTON_TM_1 Compliance Assistance
 
Letter 03/14/2018 Satisfied ANTON_TM_1 Compliance Assistance
 
Electronic Communication 03/12/2018 Satisfied ANTON_TM_1 Compliance Assistance
 
Electronic Communication 01/18/2018 Satisfied ANTON_TM_1 Routine Compliance
 
Electronic Communication 01/18/2018 Satisfied ANTON_TM_1 Routine Compliance
 
Electronic Communication 01/17/2018 Satisfied ANTON_TM_1 Compliance Assistance
 
Site Inspection 06/26/2017 Major Out of Compliance HECKMAN_DA_1 0/2 Closure
 
Letter 06/26/2017 Satisfied HECKMAN_DA_1 Compliance Assistance
 
Site Inspection 06/26/2017 Major Out of Compliance HECKMAN_DA_1 0/2 Installation
 
Letter 06/26/2017 Satisfied HECKMAN_DA_1 Compliance Assistance
 
Letter 06/12/2017 Satisfied ANTON_TM_1 Non-Compliance
 
Site Inspection 06/12/2017 Major Out of Compliance ANTON_TM_1 0/2 Routine Compliance
 
Record Document 08/19/2015 Satisfied HECKMAN_DA_1 Non-Compliance
 
Record Document 08/11/2015 Satisfied HECKMAN_DA_1 Non-Compliance
 
Letter 06/05/2015 Satisfied HECKMAN_DA_1 Non-Compliance
 
Site Inspection 06/05/2015 Minor Out of Compliance HECKMAN_DA_1 0/2 Routine Compliance
 
Site Inspection 09/22/2014 In Compliance HECKMAN_DA_1 0/2 Closure
 
Site Inspection 09/22/2014 In Compliance HECKMAN_DA_1 0/2 Installation
 
Site Inspection 07/15/2014 In Compliance HECKMAN_DA_1 0/2 Installation
 
Site Inspection 07/15/2014 In Compliance HECKMAN_DA_1 0/2 Closure
 
Site Inspection 12/19/2013 In Compliance CULBRETH_L 0/2 QA/QC
 
Electronic Communication 12/19/2013 Satisfied CULBRETH_L QA/QC
 
Site Inspection 11/13/2013 In Compliance COLSON_NJ_1 0/2 Routine Compliance
 
Issue Document 11/13/2013 Satisfied COLSON_NJ_1 Routine Compliance
 
Discharge Reporting 06/04/2012 Satisfied COLSON_NJ_1 Discharge
 
Document Management 06/04/2012 Complete COLSON_NJ_1 Discharge
 
Record Document 02/13/2012 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 01/20/2012 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 01/20/2012 Minor Out of Compliance COLSON_NJ_1 0/2 Routine Compliance
 
Site Inspection 05/11/2011 In Compliance COLSON_NJ_1 0/2 Installation
 
Site Inspection 05/11/2011 In Compliance COLSON_NJ_1 0/2 Closure
 
Record Document 04/29/2011 Satisfied COLSON_NJ_1 Closure
 
Site Inspection 10/21/2010 In Compliance COLSON_NJ_1 0/2 Routine Compliance
 
Record Document 01/22/2010 Satisfied COLSON_NJ_1 Non-Compliance
 
Record Document 01/08/2010 Minor Out of Compliance COLSON_NJ_1 Non-Compliance
 
Record Document 11/13/2009 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 11/13/2009 Major Out of Compliance COLSON_NJ_1 0/2 Routine Compliance
 
Letter 11/13/2009 Satisfied COLSON_NJ_1 Non-Compliance
 
Emergency Preparedness Information 10/28/2009 Satisfied COLSON_NJ_1 Routine Compliance
 
Record Document 09/17/2009 Satisfied OSTENSEN_SA_1 Non-Compliance
 
Letter 12/19/2008 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 12/19/2008 Major Out of Compliance COLSON_NJ_1 0/2 Routine Compliance
 
Emergency Preparedness Information 12/19/2008 Satisfied COLSON_NJ_1 Routine Compliance
 
Record Document 12/19/2008 Satisfied COLSON_NJ_1 Non-Compliance
 
Phone Conversation 10/09/2008 Satisfied BAUER_DR_1 Routine Compliance
 
Site Inspection 01/14/2008 In Compliance BAUER_DR_1 0/2 Routine Compliance
 
Emergency Preparedness Information 11/19/2007 Satisfied BAUER_DR_1 Routine Compliance
 
TCAR 07/10/2007 Satisfied OSTENSEN_SA_1 Closure
 
Record Document 03/20/2007 Satisfied OSTENSEN_SA_1 Discharge
 
Emergency Preparedness Information 02/09/2007 Satisfied HARMAN_GR Routine Compliance
 
Letter 01/23/2007 Satisfied OSTENSEN_SA_1 Non-Compliance
 
Site Inspection 01/23/2007 In Compliance BAUER_DR_1 0/4 Closure
 
Site Inspection 01/23/2007 Minor Out of Compliance OSTENSEN_SA_1 0/2 Routine Compliance
 
Site Inspection 01/12/2007 Major Out of Compliance HARMAN_GR 0/2 Installation
 
Emergency Preparedness Information 10/02/2006 Satisfied BAUER_DR_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
08/17/2023 6015 Minor 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. Any positive response of a leak detection device should be investigated as an incident and further investigation is required. Remove any water/product from the diesel/PUL tank interstice and begin an incident investigation, if no liquid is found repair/replace and retest the sensor, if liquid is found in secondary a breach of integrity test on the tank interstice may be required. Submit all investigation and test results to Citrus County Environmental Health.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
11/21/2006   COMPLETED 55