Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Local Government | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 9100167 | Latitude | 28° 2' 32.6958 | ||||||||
Name |
LAKELAND AREA MASS TRANSIT DIST 1212 GEORGE JENKINS BLVD |
Longitude | 81° 58' 23.7111 | ||||||||
LAKELAND, FL 33815 | LL Method | DPHO | |||||||||
Contact | LUIS DIAZ | LL Status | REVIEWED | ||||||||
Phone | (863) 670-8966 | Status Date | 10/03/2024 | ||||||||
Account Owner Information | |||||||||||
Name | LAKELAND AREA MASS TRANSIT DIST 1212 GEORGE JENKINS BLVD LAKELAND, FL 33815-1312 |
Effective Date | 05/20/1994 | ||||||||
Contact | LUIS DIAZ | ||||||||||
Phone | (863) 670-8966 | ||||||||||
LDIAZ@RIDECITRUS.COM | |||||||||||
Placard # / Date | 685747 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LAKELAND AREA MASS TRANSIT DIST 1212 GEORGE JENKINS BLVD LAKELAND, FL 33815-1312 |
Effective Date | 02/27/2008 | ||||||||
Contact | LUIS DIAZ | ||||||||||
Phone | (863) 670-8966 | ||||||||||
LDIAZ@RIDECITRUS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Other Non Regulated (Z) | 04/01/1990 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass | (I) Not required (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1000 | Other Non Regulated (Z) | 04/01/1990 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass | (I) Not required (M) Manual tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 20000 | Vehicular Diesel (D) | 10/01/2009 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 3000 | Unleaded Gas (B) | 07/01/2014 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Unleaded Gas (B) | 04/01/1990 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (I) Suction piping system |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Vehicular Diesel (D) | 04/01/1990 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (I) Suction piping system |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Vehicular Diesel (D) | 04/01/1990 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (I) Suction piping system |
(1) Continuous electronic sensing (4) Visual inspect dispenser liners (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 2000 | Waste Oil (L) | 04/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass | (I) Not required (M) Manual tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 03/12/2020 | 03/12/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 03/12/2019 | 03/12/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 03/12/2018 | 03/12/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2016 | 12/02/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2013 | 12/02/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2012 | 12/02/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2010 | 12/02/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2009 | 12/02/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2008 | 12/02/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/02/2000 | 12/02/2001 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 07/21/2004 | 08/09/2004 | IN-COMPLIANCE | HUGHES_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND SINGLE WALLED FIBERGLASS PIPING. RESOLVES VIOLATON #157. | |||||||||||
RRBD | 06/11/2003 | 06/13/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes THIS RESOLVES VIOLATION #!03. | |||||||||||
NCLI | 04/21/2003 | 04/24/2003 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/08/2003 | 04/24/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SACLARIDES_M | 0/6 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS DOCUMENTED | |||||||||||
RRBD | 06/24/2002 | 06/24/2002 | PEGUES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/04/2002 | 06/24/2002 | PEGUES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/19/2002 | 04/29/2002 | PEGUES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/19/2002 | 04/29/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | PEGUES_M | 0/5 | COMPLIANCE ASSURANCE | |||||
TCI | 12/14/2000 | 12/18/2000 | IN-COMPLIANCE | RANDOLPH_L | 0/5 | COMPLIANCE ASSURANCE | |||||
TCR | 03/16/2000 | 03/20/2000 | IN-COMPLIANCE | RONEY_B | 0/5 | COMPLIANCE ASSURANCE | |||||
CWOE | 03/16/2000 | 03/20/2000 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
REX | 01/24/2000 | 06/28/2001 | JENKINS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NEW DATE FOR RESOLUTION 3/19/00 | |||||||||||
RRBD | 12/07/1999 | 01/21/2000 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/22/1999 | 11/03/1999 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/19/1999 | 10/25/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONEY_B | 0/5 | COMPLIANCE ASSURANCE | |||||
TXI | 03/16/1999 | 04/01/1999 | IN-COMPLIANCE | CALLAHAM_C | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/16/1999 | 04/01/1999 | IN-COMPLIANCE | CALLAHAM_C | 0/3 | COMPLIANCE ASSURANCE | |||||
UTCI | 12/09/1998 | 12/18/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/02/2020 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 04/02/2020 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/02/2020 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 04/02/2020 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Letter | 04/02/2020 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 03/31/2020 | Major Out of Compliance | GLENN_LE_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 07/02/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Letter | 07/02/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Document Management | 07/02/2018 | Satisfied | GLENN_LE_1 | Incident | |||||||
Incident | 07/02/2018 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Site Inspection | 06/30/2018 | In Compliance | GLENN_LE_1 | 2/0 | Compliance Assistance | ||||||
Electronic Communication | 06/07/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/06/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/06/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 04/13/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 03/30/2018 | Major Out of Compliance | GLENN_LE_1 | 2/0 | Routine Compliance | ||||||
Letter | 03/30/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/30/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/30/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 03/07/2018 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 03/23/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Site Inspection | 03/23/2016 | In Compliance | GLENN_LE_1 | 1/0 | Non-Compliance | ||||||
Electronic Communication | 02/02/2016 | Satisfied | GLENN_LE_1 | Installation | |||||||
Electronic Communication | 02/02/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Letter | 01/28/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Site Inspection | 01/28/2016 | Minor Out of Compliance | GLENN_LE_1 | 2/0 | Routine Compliance | ||||||
Letter | 01/28/2016 | Satisfied | GLENN_LE_1 | Non-Compliance | |||||||
Site Inspection | 01/28/2016 | Minor Out of Compliance | GLENN_LE_1 | 1/0 | Installation | ||||||
Site Inspection | 08/27/2013 | In Compliance | WINN_JP_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 08/27/2013 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Enforcement Tracking | 05/22/2013 | Closed Without Enforcement | MEETZE_A | Enforcement | |||||||
Enforcement Referral | 02/05/2013 | Accepted | MEETZE_A | Enforcement | |||||||
Electronic Communication | 11/02/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Phone Conversation | 10/08/2012 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 07/09/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Record Document | 07/09/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 07/06/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 07/06/2012 | Major Out of Compliance | WINN_JP_1 | 1/0 | Routine Compliance | ||||||
Discharge Reporting | 05/23/2011 | Satisfied | BELL_JM_1 | Discharge | |||||||
Site Inspection | 01/27/2011 | In Compliance | SLAPPEY_WR_1 | 1/0 | Routine Compliance | ||||||
Enforcement Tracking | 10/06/2010 | Closed With Enforcement | MEETZE_A | Enforcement | |||||||
Electronic Communication | 09/03/2010 | Satisfied | DERY_WC_1 | Closure | |||||||
Document Management | 08/30/2010 | Complete | BELL_JM_1 | Discharge | |||||||
Letter | 08/23/2010 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Phone Conversation | 08/09/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 07/09/2010 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Document Management | 07/09/2010 | Complete | BELL_JM_1 | Discharge | |||||||
TCAR | 07/09/2010 | Satisfied | BELL_JM_1 | Closure | |||||||
Letter | 07/09/2010 | Satisfied | BELL_JM_1 | Discharge | |||||||
Site Inspection | 07/07/2010 | In Compliance | WINN_JP_1 | 1/3 | Closure | ||||||
Enforcement Referral | 06/01/2010 | Accepted | MEETZE_A | Enforcement | |||||||
Site Inspection | 05/03/2010 | In Compliance | CASSELS_CR_1 | 1/0 | Installation | ||||||
Phone Conversation | 03/17/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 01/06/2010 | In Compliance | CASSELS_CR_1 | 0/3 | Routine Compliance | ||||||
Meeting | 01/06/2010 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Phone Conversation | 08/28/2009 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Phone Conversation | 08/28/2009 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Phone Conversation | 06/18/2009 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Record Document | 06/02/2009 | Satisfied | CASSELS_CR_1 | Installation | |||||||
Site Inspection | 01/30/2009 | In Compliance | WINN_JP_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/21/2008 | Major Out of Compliance | CASSELS_CR_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/21/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Issue Document | 02/21/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Record Document | 01/23/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 01/09/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 01/09/2008 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Letter | 01/04/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 01/04/2008 | Major Out of Compliance | DERY_WC_1 | 0/1 | Closure | ||||||
Letter | 01/03/2008 | Satisfied | CASSELS_CR_1 | Discharge | |||||||
TCAR | 01/03/2008 | Satisfied | CASSELS_CR_1 | Closure | |||||||
Letter | 01/03/2008 | Satisfied | CASSELS_CR_1 | Closure | |||||||
Letter | 07/13/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Issue Document | 06/14/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 05/01/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 05/01/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Issue Document | 04/17/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Record Document | 03/05/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 03/05/2007 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 12/14/2006 | Major Out of Compliance | CASSELS_CR_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 11/06/2006 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/31/2020 | 5094 | SNC-B | 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. | The next two months (April and May) of visual release detection monitoring inspections must be provided to the Department as they are performed. | |||||||
03/31/2020 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Testing must be performed immediately and a copy of the test results provided to the Department. | |||||||
03/31/2020 | 5097 | SNC-B | 3.5 Electronic release detection devices not inspected monthly for shop fabricated storage tank systems. | The next two months (April and May) of electronic release detection monitoring inspections must be provided to the Department as they are performed. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/01/2010 | COMPLETED | 30 | |||||||||
12/19/2007 | COMPLETED | ||||||||||
04/02/1999 | COMPLETED | 29 | |||||||||
09/09/1993 | COMPLETED | ||||||||||