Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 9101076 | Latitude | 28° 53' 50.0149 | ||||||||
Name |
SUNDEV INC OF FL 100 N CHARLES R BEALL BLVD |
Longitude | 81° 18' 20.2617 | ||||||||
DEBARY, FL 32713-2204 | LL Method | DPHO | |||||||||
Contact | DAVE PATEL | LL Status | REVIEWED | ||||||||
Phone | (352) 572-6730 | Status Date | 09/18/2023 | ||||||||
Account Owner Information | |||||||||||
Name | SUNDEV INC OF FL 5752 ANSLEY WAY Mount Dora, FL 32757 |
Effective Date | 01/28/2022 | ||||||||
Contact | DAVE PATEL | ||||||||||
Phone | (352) 572-6730 | ||||||||||
4521SUNOCO@GMAIL.COM | |||||||||||
Placard # / Date | 683386 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNDEV INC OF FL 5752 ANSLEY WAY Mount Dora, FL 32757 |
Effective Date | 01/28/2022 | ||||||||
Contact | DAVE PATEL | ||||||||||
Phone | (352) 572-6730 | ||||||||||
4521SUNOCO@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Vehicular Diesel (D) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | |||||||||||
INSURANCE | 12/14/2023 | 12/14/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 12/01/2021 | 12/01/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | AIG SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/01/2012 | 12/01/2013 | CHARTIS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2011 | 01/22/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/22/2010 | 01/22/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/22/2010 | 01/22/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/22/2009 | 01/22/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 03/02/2006 | 03/02/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FR PAPERWORK RECEIVED. | |||||||||||
CALL | 03/02/2006 | 03/02/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DAN PHILLIPS CALLED, WILL FAX FR TO OFFICE. | |||||||||||
LTR | 02/24/2006 | 02/24/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WARNING LETTER SENT | |||||||||||
RRBD | 02/02/2006 | 02/02/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED INFORMATION ON ANNUAL LEAK DETECTOR TEST | |||||||||||
CALL | 02/01/2006 | 02/01/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DANNY PHILLIPS CALLED, INSURANCE CARRIER IS ZURICH. WILL SEND OVER PAPERWORK TO VERIFY. | |||||||||||
NCLI | 01/20/2006 | 01/20/2006 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO RESPONSE FROM FACILITY. | |||||||||||
TCI | 10/11/2005 | 10/12/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD'S REQUIRE ANNUAL TESTING. ALL THREE INTERSTICES OF THE TANKS REQUIRE BRINE REFURBISHMENT (ADD OR LOWER). FINAN. RESPONS. NOT AVAILABLE (PROVIDED COMPANY- AMERICANA- NOT ON DEP APPROVED LIST. | |||||||||||
FR | 06/14/2005 | 06/14/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PROSPECTIVE PURCHASER REVIEWED FILE. | |||||||||||
TCI | 11/16/2004 | 12/02/2004 | IN-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/19/2003 | 11/26/2003 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/05/2003 | 02/05/2003 | DJ | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CORRESPONDENCE FROM LIL' CHAMP INDICATING THE OUTSTANDING VIOLATIONS WERE CORRECTED ON 01/23/03. WILL REINSPECT | |||||||||||
TCI | 11/19/2002 | 11/22/2002 | MINOR OUT-OF-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VEEDER-ROOT ILS250 IS INOPERABLE. SHEAR VALVE ON DISPENSER 2 IS NOT ANCHORED. | |||||||||||
TCI | 11/28/2001 | 12/04/2001 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/29/2000 | 12/01/2000 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/22/2000 | 02/22/2000 | MOSER_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/20/2000 | 02/02/2000 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
UTCI | 01/12/1999 | 03/05/1999 | IN-COMPLIANCE | VANDERBLEE_R | 0/0 | UST COMPLIANCE PROJECT | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 09/16/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Electronic Communication | 07/16/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 04/08/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/04/2024 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 04/03/2024 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Site Inspection | 04/02/2024 | Minor Out of Compliance | PIERCE_BN_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 04/04/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/04/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/20/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 04/19/2022 | Major Out of Compliance | PIERCE_BN_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 04/04/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 03/27/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Phone Conversation | 02/09/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/20/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 09/22/2021 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Issue Document | 02/15/2021 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 02/15/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 02/12/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 09/27/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 08/06/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 04/03/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 03/30/2020 | Major Out of Compliance | PIERCE_BN_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 03/24/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Meeting | 03/24/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Phone Conversation | 03/02/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 02/13/2017 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 02/13/2017 | Minor Out of Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Letter | 02/17/2015 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 02/13/2015 | Minor Out of Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/11/2015 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Electronic Communication | 03/06/2013 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 03/06/2013 | In Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/28/2013 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Phone Conversation | 05/03/2012 | Satisfied | STAFFORD_P_1 | Non-Compliance | |||||||
Record Document | 05/03/2012 | Satisfied | COIL_JM_1 | Non-Compliance | |||||||
Letter | 04/26/2012 | Satisfied | COIL_JM_1 | Non-Compliance | |||||||
Site Inspection | 04/23/2012 | Minor Out of Compliance | COIL_JM_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/13/2012 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Phone Conversation | 03/27/2012 | Satisfied | COIL_JM_1 | Routine Compliance | |||||||
Site Inspection | 04/12/2011 | In Compliance | CRAFT_TT_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/19/2010 | In Compliance | CRAFT_TT_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 08/20/2009 | Closed Without Enforcement | BENDER_A | Enforcement | |||||||
Site Inspection | 08/07/2009 | In Compliance | BENDER_A | 0/3 | Enforcement | ||||||
Enforcement Referral | 08/05/2009 | Accepted | BENDER_A | Enforcement | |||||||
Record Document | 08/04/2009 | Satisfied | BENDER_A | Routine Compliance | |||||||
Record Document | 04/20/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 04/01/2009 | Satisfied | STAFFORD_P_1 | Routine Compliance | |||||||
Record Document | 04/01/2009 | Satisfied | STAFFORD_P_1 | Routine Compliance | |||||||
Letter | 03/24/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 03/17/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 03/03/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 02/20/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 12/09/2008 | Major Out of Compliance | CRAFT_TT_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/19/2007 | In Compliance | LEIGH_MM_1 | 0/3 | Non-Compliance | ||||||
Phone Conversation | 11/27/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 11/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 11/15/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 10/16/2007 | Major Out of Compliance | MOSER_T | 0/3 | Routine Compliance | ||||||
Record Document | 07/25/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Site Inspection | 07/19/2007 | In Compliance | LEIGH_MM_1 | 0/3 | Non-Compliance | ||||||
Letter | 05/29/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 04/25/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 04/18/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Phone Conversation | 04/18/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Enforcement Referral Activity - OLD | 04/11/2007 | Cancelled | LEIGH_MM_1 | Enforcement | |||||||
Phone Conversation | 03/08/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Phone Conversation | 03/07/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 02/23/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Letter | 12/21/2006 | Warning Letter Issued | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 10/19/2006 | Major Out of Compliance | MOSER_T | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | MOSER_T | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/02/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Please supply tank insurance coverage for Dec. 2022 - Dec. 2023 for review. | |||||||
04/02/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Please have applicable representatives complete operator C training. Please use the following link to access approved operator training for Florida: https://floridadep.gov/waste/permitting-compliance-assistance/content/underground-storagetank- operator-training. | |||||||
No Discharges Found |