![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/17/2025 Last Data Refresh: 05/16/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9102066 | Latitude | 27° 46' 44.2537 | ||||||||
Name |
RENAISSANCE VINOY RESORT 501 5TH AVE NE |
Longitude | 82° 37' 47.8369 | ||||||||
SAINT PETERSBURG, FL 33701 | LL Method | DPHO | |||||||||
Contact | HOWARD BAKER | LL Status | REVIEWED | ||||||||
Phone | (727) 894-1000 | Status Date | 11/05/2003 | ||||||||
Account Owner Information | |||||||||||
Name | VINOY PROPERTY PARTNERSHIP 501 5TH AVE NE SAINT PETERSBURG, FL 33701 |
Effective Date | 05/20/1994 | ||||||||
Contact | HOWARD BAKER | ||||||||||
Phone | (727) 894-1000 | ||||||||||
HOWARD.BAKER@RENAISSANCEHOTELS.COM | |||||||||||
Placard # / Date | 699626 - 07/16/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | VINOY PROPERTY PARTNERSHIP 501 5TH AVE NE SAINT PETERSBURG, FL 33701 |
Effective Date | 06/08/2000 | ||||||||
Contact | HOWARD BAKER | ||||||||||
Phone | (727) 894-1000 | ||||||||||
HOWARD.BAKER@RENAISSANCEHOTELS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1000 | Emerg Generator Diesel (G) | 08/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (6) External piping monitoring (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Residual oils, 5&6 (V) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Residual oils, 5&6 (V) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/15/2020 | 08/15/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 08/15/2019 | 08/15/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 08/15/2018 | 08/15/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 12/31/2014 | 12/31/2015 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 12/31/2011 | 12/31/2014 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 12/31/2010 | 12/31/2011 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 12/12/2009 | 12/12/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/22/2008 | 12/22/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 11/28/2005 | 12/06/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SUBMITTAL OF REGISTRATION PLACARD | |||||||||||
RRBD | 11/07/2005 | 11/30/2005 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 10/20/2005 | 10/28/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/05/2005 | 10/28/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FRAZIER | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/07/2004 | 12/07/2004 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 07/15/2004 | 07/23/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/06/2004 | 07/23/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | BARNETT | 1/0 | COMPLIANCE ASSURANCE | |||||
CFFE | 12/02/2003 | 12/02/2003 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
CCD | 12/02/2003 | 01/08/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 09/10/2003 | 01/08/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 07/09/2003 | 07/11/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/07/2003 | 07/11/2003 | IN-COMPLIANCE | STRAUSS | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes ENVIRON DW FLEX PIPING / FACILITY NOW COMPLETING APPROPRIATE RELEASE DETECTION AND MAINTAINING RECORDS | |||||||||||
EPI | 07/07/2003 | 01/08/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
CRDE | 11/06/2002 | 11/06/2002 | SOWERS/HALSCOTT | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 07/17/2002 | 07/30/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 07/05/2002 | 07/30/2002 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 07/05/2002 | 07/09/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/02/2002 | 07/09/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/09/2001 | 10/31/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/16/2001 | 08/24/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/13/2000 | 10/17/2000 | IN-COMPLIANCE | CASTOR | 1/0 | COMPLIANCE ASSURANCE | |||||
SV | 04/29/2000 | 05/01/2000 | SOWERS | 1/0 | DISCHARGE PROJECT | ||||||
RRBD | 12/30/1999 | 01/03/2000 | CASTOR | 1/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/29/1999 | 01/03/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | CASTOR | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 07/23/2024 | Accepted | PUHR_NM_1 | Enforcement | |||||||
Site Inspection | 05/16/2024 | Major Out of Compliance | PUHR_NM_1 | 1/0 | Routine Compliance | ||||||
Enforcement Referral | 01/11/2023 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 10/17/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/17/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 01/19/2021 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 10/30/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 10/30/2020 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 10/08/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Record Document | 08/27/2018 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Letter | 08/16/2018 | Satisfied | SOWERS_JA_1 | Compliance Assistance | |||||||
Electronic Communication | 08/16/2018 | Satisfied | SOWERS_JA_1 | Compliance Assistance | |||||||
Electronic Communication | 07/20/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 07/20/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 04/24/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 04/24/2018 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 04/11/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 04/24/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 04/24/2015 | In Compliance | COLSON_NJ_1 | 1/0 | Non-Compliance | ||||||
Letter | 04/10/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 04/09/2015 | Minor Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Record Document | 05/23/2013 | Satisfied | JUEDES_HC_1 | Non-Compliance | |||||||
Letter | 04/09/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 04/09/2013 | Minor Out of Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 03/21/2011 | In Compliance | STRAUSS_RH_1 | 1/0 | Non-Compliance | ||||||
Record Document | 03/03/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 02/24/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/24/2011 | Major Out of Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 02/22/2010 | In Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Issue Document | 02/22/2010 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Record Document | 04/14/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 03/24/2009 | Minor Out of Compliance | BARNETT_JX | 1/0 | Routine Compliance | ||||||
Letter | 03/24/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Enforcement Tracking | 05/09/2008 | Closed With Enforcement | MARSH_L | Enforcement | |||||||
Record Document | 03/13/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Enforcement Referral | 03/05/2008 | Accepted | MARSH_L | Enforcement | |||||||
Letter | 12/24/2007 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 10/02/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 10/02/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 10/02/2007 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Closure | ||||||
Site Inspection | 10/02/2007 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Installation | ||||||
Letter | 09/19/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 09/19/2007 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Closure | ||||||
Letter | 08/17/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/17/2007 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/16/2024 | 7010 | SNC-A | 1.8 No financial responsibility instrument or expired instrument for > 180 days. | *Provide financial responsibility documentation from 8/15/2021 to current to this office for review.* | |||||||
10/30/2020 | 5094 | SNC-B | 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. | Submit the missing records (since April 2018), if found. Be sure to inspect the condition of all major system components (tank exterior, piping, spill bucket, tank interstice, & piping sumps) every month & no more than 35 days apart. Maintain records on file for at least 36 months. Submit properly documented release detection inspection records to this office for consecutive months. | |||||||
10/30/2020 | 5125 | Minor | 3.15 Failure to conduct required periodic containment and interstitial integrity testing for shop fabricated storage tank systems. | Submit current integrity (hydro) test results for the (2) piping transition sumps to this office for review. | |||||||
10/30/2020 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Submit current operability test results for the overfill protection device (Krueger level gauge) to this office for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/27/2000 | COMPLETED | 10 | |||||||||
05/04/1991 | COMPLETED | 11 | ABANDONED TANK RESTORATION PROGRAM-ELIGIBLE | ||||||||