Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9103007 | Latitude | 27° 54' 56.8855 | ||||||||
Name |
REBEL #838 5798 ROOSEVELT BLVD N |
Longitude | 82° 42' 47.2241 | ||||||||
CLEARWATER, FL 33760 | LL Method | DPHO | |||||||||
Contact | RENEE BOSWORTH | LL Status | REVIEWED | ||||||||
Phone | (727) 477-1857 | Status Date | 10/21/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FUTURE ENERGY FLORIDA INC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 09/07/2021 | ||||||||
Contact | CHITTAL SHAH / CHRIS DEVELLEREZ 909-394-4728 | ||||||||||
Phone | (951) 313-7490 | ||||||||||
LICENSING@CARENTERPRISES.NET | |||||||||||
Placard # / Date | 699994 - 07/23/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ANABI REAL ESTATE DEVELOPMENT LLC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 09/07/2021 | ||||||||
Contact | SUMMER IREIFEJ / RAWA ANABI | ||||||||||
Phone | (909) 394-4728 | ||||||||||
SIREIFEJ@CARENTERPRISES.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Ethanol E10 (8) | 07/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms (Q) DEP approved protection |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Ethanol E10 (8) | 07/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms (Q) DEP approved protection |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Ethanol E10 (8) | 07/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms (Q) DEP approved protection |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2022 | 05/14/2023 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2021 | 05/14/2022 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
SURETY BOND | 01/01/2021 | 12/31/2021 | |||||||||
SURETY BOND | 01/01/2020 | 12/31/2020 | |||||||||
SURETY BOND | 01/01/2019 | 12/31/2019 | |||||||||
SURETY BOND | 01/01/2018 | 12/31/2018 | |||||||||
SURETY BOND | 11/01/2015 | 12/31/2017 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2014 | 04/29/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/20/2012 | 04/19/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2011 | 04/29/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2008 | 04/29/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 03/29/2006 | 03/30/2006 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/23/2006 | 03/30/2006 | IN-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
CNLI | 06/27/2005 | 06/27/2005 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF BASED ON SPILL CONTAINMENT UNIT CLOSURE | |||||||||||
DCCR | 06/07/2005 | 06/08/2005 | SOWERS | 0/0 | DISCHARGE PROJECT | ||||||
CNLI | 06/07/2005 | 06/08/2005 | SOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SAR LETTER ISSUED BASED ON SUBMITTED CLOSURE DOCUMENTS | |||||||||||
LTR | 06/07/2005 | 06/08/2005 | SOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LETTER ISSUED SAYING INCIDENT INVESTIGATION COMPLETED BY SUBMITTAL OF CLOSURE REPORT | |||||||||||
RRBD | 05/10/2005 | 06/08/2005 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSURE REPORT DOCUMENTS SUBMITTED | |||||||||||
LTR | 04/19/2005 | 04/19/2005 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 03/09/2005 | 03/09/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 03/09/2005 | 03/09/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 03/08/2005 | 03/09/2005 | IN-COMPLIANCE | FRAZIER | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALL OF 3 SPILL CONTAINMENT UNITS | |||||||||||
TXI | 03/07/2005 | 03/09/2005 | IN-COMPLIANCE | FRAZIER | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOVAL OF 3 SPILL CONTAINMENT UNITS | |||||||||||
LTR | 12/27/2004 | 01/02/2005 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/24/2004 | 01/02/2005 | IN-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
CCD | 07/16/2004 | 07/16/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
SCOE | 06/22/2004 | 06/22/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/17/2004 | 06/01/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes HESS RESPONSE - NO CORRECTION | |||||||||||
NCLI | 04/13/2004 | 04/26/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/12/2004 | 04/26/2004 | MINOR OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP PIPE | |||||||||||
EPI | 03/30/2004 | 04/05/2004 | REEDER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 09/05/2003 | 10/06/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SUBMITTAL OF ELECTRONIC LLD TEST RESULTS AND ATG CERTIFICATION - ALL TESTED AND PASSED 8/12/03 | |||||||||||
RRBD | 07/31/2003 | 08/06/2003 | HESS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PHOTOS EMAILED OF PAINTED LIDS | |||||||||||
LTR | 07/24/2003 | 07/25/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
SV | 07/23/2003 | 07/25/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes W/ J PINK. PHOTO TAKEN. FILL LIDS HAVE NOT BEEN REPAINTED. | |||||||||||
LTR | 07/21/2003 | 07/21/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
SV | 07/14/2003 | 07/21/2003 | ROGGELIN | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes W/ J PINK | |||||||||||
NCLI | 06/06/2003 | 06/09/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/28/2003 | 06/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW PIPE | |||||||||||
LTR | 12/31/2002 | 01/03/2003 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
LTR | 12/18/2002 | 01/03/2003 | HALSCOTT | 0/0 | DISCHARGE PROJECT | ||||||
TCI | 10/01/2001 | 10/08/2001 | IN-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/18/2001 | 07/17/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/02/2001 | 04/02/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/08/2000 | 08/06/2000 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 04/20/2000 | 04/24/2000 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/24/2000 | 02/05/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | ROGGELIN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/28/1999 | 06/28/1999 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 06/23/1998 | 06/25/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 08/27/2024 | Satisfied | WIMBERLY_E | Enforcement | |||||||
Enforcement Referral | 07/26/2024 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 06/28/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Electronic Communication | 06/28/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Record Document | 06/28/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Electronic Communication | 05/16/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/16/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/16/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/16/2024 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 04/03/2024 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||||||
Record Document | 04/02/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Letter | 02/23/2024 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Site Inspection | 02/01/2024 | Major Out of Compliance | TUCKER_SX_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/09/2024 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 06/27/2023 | In Compliance | COLSON_NJ_1 | 0/1 | Component Closure | ||||||
Letter | 06/27/2023 | Satisfied | COLSON_NJ_1 | Component Installation | |||||||
TCAR | 06/27/2023 | Satisfied | LASHBROOK_SJ_1 | Component Closure | |||||||
Site Inspection | 06/27/2023 | In Compliance | COLSON_NJ_1 | 0/3 | Component Installation | ||||||
Letter | 06/27/2023 | Satisfied | COLSON_NJ_1 | Component Closure | |||||||
Letter | 09/20/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Record Document | 09/19/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Record Document | 07/21/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Record Document | 06/02/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Record Document | 05/18/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Letter | 05/06/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Site Inspection | 05/04/2022 | Major Out of Compliance | SHOCK_E_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 01/20/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 10/04/2019 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 10/04/2019 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Letter | 09/26/2019 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 09/26/2019 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/13/2019 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 07/11/2017 | In Compliance | STRAUSS_RH_1 | 0/3 | Compliance Assistance | ||||||
Issue Document | 07/11/2017 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 06/20/2017 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 05/08/2017 | Major Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Letter | 05/08/2017 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 05/01/2017 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 02/20/2015 | In Compliance | STRAUSS_RH_1 | 0/3 | Non-Compliance | ||||||
Issue Document | 02/20/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/09/2014 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 12/09/2014 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/09/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Issue Document | 11/26/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Electronic Communication | 02/25/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Letter | 10/03/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 10/03/2012 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Closure | ||||||
Site Inspection | 10/03/2012 | Minor Out of Compliance | STRAUSS_RH_1 | 0/3 | Installation | ||||||
Letter | 10/03/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 08/13/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 07/10/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/10/2012 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 04/09/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
TCAR | 12/28/2011 | Satisfied | LONGEN_JL_1 | Closure | |||||||
Document Management | 12/28/2011 | Complete | LONGEN_JL_1 | Closure | |||||||
Incident | 12/15/2011 | Has not led to Discharge | LONGEN_JL_1 | Incident | |||||||
Site Inspection | 09/26/2011 | Major Out of Compliance | ROGGELIN_EM_1 | 0/3 | Installation | ||||||
Letter | 09/26/2011 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Letter | 09/20/2011 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 09/20/2011 | Major Out of Compliance | ROGGELIN_EM_1 | 0/3 | Closure | ||||||
Record Document | 09/15/2011 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 05/09/2011 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 05/09/2011 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Record Document | 06/07/2010 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 05/17/2010 | Minor Out of Compliance | SOWERS_JA_1 | 0/3 | Routine Compliance | ||||||
Letter | 05/17/2010 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 04/29/2009 | In Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Record Document | 04/23/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 02/21/2008 | Major Out of Compliance | SOWERS_JA_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/21/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/05/2008 | Satisfied | SOWERS_JA_1 | Routine Compliance | |||||||
Letter | 05/02/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | BARNETT_JX | Routine Compliance | |||||||
Site Inspection | 08/03/2006 | Minor Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/01/2024 | 6024 | Minor | 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. | Provide integrity test results for the STP sumps and UDCs. | |||||||
02/01/2024 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Provide investigation results and confirm that the RUL and E0 spill buckets are tight. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/15/2005 | COMPLETED | 10 | |||||||||