DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/21/2025        Last Data Refresh: 05/20/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Nassau   Status    OPEN
 
ID 9103656   Latitude    30° 35' 33.2178
 
Name HARRIS TEETER FUEL #44
5518 S FLETCHER AVE
Longitude    81° 27' 29.2733
  FERNANDINA BEACH, FL 32034 LL Method    DGPS
 
Contact JOHN KIGER   LL Status    REVIEWED
 
Phone (904) 491-1213   Status Date    11/18/2003
 
Account Owner Information
 
Name HARRIS TEETER PROPERTIES LLC
701 CRESTDALE RD
MATTHEWS, NC 28105
Effective Date    09/21/2020
 
Contact JACOB PHARES
 
Phone (704) 844-3100
 
Email JPHARES@HARRISTEETER.COM
  Placard # / Date    685622 - 06/07/2024
Property Owner Information
 
Name HARRIS TEETER PROPERTIES LLC
701 CRESTDALE RD
MATTHEWS, NC 28105
Effective Date    09/21/2020
 
Contact JACOB PHARES
 
Phone (704) 844-3100
 
Email JPHARES@HARRISTEETER.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
7 15000 Ethanol E10 (8) 04/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
8 8000 Ethanol E10 (8) 04/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
9 8000 Ultra Low Sulfur Diesel (I) 04/01/2013 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 6000 Unleaded Gas (B) 11/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(O) Tight fill
  (B) Steel/galvanized metal (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Unleaded Gas (B) 11/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(O) Tight fill
  (B) Steel/galvanized metal (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
3 6000 Unleaded Gas (B) 11/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(O) Tight fill
  (B) Steel/galvanized metal (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
4 6000 Vehicular Diesel (D) 11/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(O) Tight fill
  (B) Steel/galvanized metal (8) Manually sampled wells
(H) Mechanical line leak detector
 
 
Tank Tank Size Content Installed Placement Status
5 10000 Unleaded Gas (B) 08/01/1998 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
6 10000 Unleaded Gas (B) 08/01/1998 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(L) Automatic tank gauging - USTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   05/01/2024 05/01/2025 ILLINOIS NATIONAL INSURANCE COMPANY
INSURANCE   05/01/2023 05/01/2024 ILLINOIS UNION INSURANCE COMPANY
INSURANCE   05/01/2022 05/01/2023 ILLINOIS UNION INSURANCE COMPANY
INSURANCE   05/01/2021 05/01/2022 ILLINOIS UNION INSURANCE COMPANY
INSURANCE   05/01/2019 05/01/2020 TOKIO MARINE SPECIALTY INSURANCE COMPANY
INSURANCE   05/01/2018 05/01/2019 TOKIO MARINE SPECIALTY INSURANCE COMPANY
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   07/01/2016 07/01/2017 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/01/2015 07/01/2016 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   07/01/2014 07/01/2015 HUDSON SPECIALTY INSURANCE COMPANY
INSURANCE   07/01/2012 07/01/2013 GULF UNDERWRITERS
INSURANCE   07/01/2010 07/01/2011 COMMERCE & INDUSTRY
INSURANCE   07/01/2009 07/01/2010 COMMERCE & INDUSTRY
INSURANCE   07/01/2008 07/01/2009 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 08/18/2005 08/29/2005 IN-COMPLIANCE MCNEIL 0/2 COMPLIANCE ASSURANCE
 
RRBD 09/02/2004 09/02/2004 COMPLIANCE ASSURANCE
 
RRBD 08/06/2004 08/06/2004 COMPLIANCE ASSURANCE
 
TCI 08/04/2004 08/05/2004 MINOR OUT-OF-COMPLIANCE MARY VELEZ 0/2 COMPLIANCE ASSURANCE
 
RRBD 08/22/2003 09/02/2003 COMPLIANCE ASSURANCE
 
TCI 07/23/2003 08/19/2003 MINOR OUT-OF-COMPLIANCE GODWIN 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes FAILURE TO HAVE RELEASE DETECTION DEVICES TESTED ANNUALLY. FAILURE TO MARK FILLBOX COVERS IN ACCORDANCE WITH API RP 1637.
 
TCI 07/31/2002 08/02/2002 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
RRBD 11/14/2001 12/10/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes ALL VIOLATIONS CORRECTED
 
NCLI 10/15/2001 11/07/2001 TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 09/26/2001 10/03/2001 MINOR OUT-OF-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 02/27/2001 02/28/2001 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TXI 12/20/2000 12/28/2000 IN-COMPLIANCE TURNER_MS 0/1 COMPLIANCE ASSURANCE
 
TCI 02/15/2000 03/06/2000 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
TCI 06/08/1999 06/21/1999 IN-COMPLIANCE TURNER_MS 0/2 COMPLIANCE ASSURANCE
 
DDCR 08/17/1998 11/24/1999 TURNER_MS 0/2 DISCHARGE PROJECT
 
IRFR 07/13/1998 11/24/1999 TURNER_MS 0/2 DISCHARGE PROJECT
 
DRFR 07/13/1998 11/24/1999 TURNER_MS 0/2 DISCHARGE PROJECT
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 07/15/2024 Satisfied AMES_J Component Closure
 
Incident 07/11/2024 Has not led to Discharge MCARTOR_H_1 Incident
 
TCAR 07/11/2024 Satisfied AMES_J Component Closure
 
Site Inspection 05/16/2024 In Compliance MCARTOR_H_1 0/1 Component Installation
 
Letter 05/16/2024 Satisfied MCARTOR_H_1 Component Installation
 
Site Inspection 05/15/2024 In Compliance MCARTOR_H_1 0/1 Component Closure
 
Electronic Communication 09/28/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Letter 09/28/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Site Inspection 07/19/2023 Minor Out of Compliance BRANCH_BL_1 0/3 Routine Compliance
 
Incident 07/19/2023 Has not led to Discharge BRANCH_BL_1 Incident
 
Letter 07/19/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Incident 07/19/2023 Has not led to Discharge BRANCH_BL_1 Incident
 
Electronic Communication 06/27/2023 Satisfied BRANCH_BL_1 Compliance Assistance
 
Letter 08/06/2021 Satisfied MCKINLEY_DN_1 Compliance Assistance
 
Site Inspection 08/05/2021 In Compliance MCKINLEY_DN_1 0/3 Routine Compliance
 
Incident 05/04/2020 Has not led to Discharge VERMILLION_KN_1 Incident
 
Enforcement Tracking 04/15/2020 Closed Without Enforcement COLLINS_MR Enforcement
 
Letter 04/15/2020 Satisfied COLLINS_MR Enforcement
 
Document Management 04/14/2020 Satisfied COLLINS_MR Enforcement
 
Document Management 04/14/2020 Satisfied COLLINS_MR Enforcement
 
TCAR 04/13/2020 Satisfied RICHARDS_JE_1 Closure
 
Letter 04/13/2020 Satisfied RICHARDS_JE_1 Closure
 
Site Inspection 03/25/2020 Major Out of Compliance MONDO_PW_1 0/3 Closure
 
Enforcement Referral 10/28/2019 Accepted GREGORY_HM_1 Enforcement
 
Electronic Communication 10/22/2019 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Letter 08/02/2019 Satisfied VERMILLION_KN_1 Compliance Assistance
 
Site Inspection 08/01/2019 Major Out of Compliance VERMILLION_KN_1 0/3 Routine Compliance
 
Electronic Communication 07/11/2019 Satisfied VERMILLION_KN_1 Routine Compliance
 
Electronic Communication 06/05/2017 Satisfied CANTU_AB_1 Routine Compliance
 
Incident 05/30/2017 Has not led to Discharge CANTU_AB_1 Incident
 
Letter 05/20/2017 Satisfied CANTU_AB_1 Non-Compliance
 
Site Inspection 05/19/2017 Minor Out of Compliance CANTU_AB_1 0/3 Routine Compliance
 
Document Management 05/15/2017 Satisfied CANTU_AB_1 Incident
 
Site Inspection 01/19/2015 In Compliance SHULAW_BJ_1 0/3 Routine Compliance
 
Emergency Preparedness Information 01/19/2015 Satisfied SHULAW_BJ_1 Routine Compliance
 
Issue Document 06/28/2013 Satisfied PEREA_AO_1 Installation
 
Site Inspection 06/27/2013 In Compliance KASSEES_RP_1 0/2 Installation
 
Emergency Preparedness Information 06/27/2013 Satisfied KASSEES_RP_1 Installation
 
Site Inspection 03/12/2013 In Compliance KASSEES_RP_1 0/2 Closure
 
Issue Document 03/12/2013 Satisfied KASSEES_RP_1 Routine Compliance
 
Site Inspection 02/28/2013 In Compliance KASSEES_RP_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/18/2013 Satisfied KASSEES_RP_1 Routine Compliance
 
Site Inspection 03/08/2011 In Compliance MCNEIL_AP_1 0/2 Routine Compliance
 
Issue Document 03/08/2011 Satisfied MCNEIL_AP_1 Routine Compliance
 
Site Inspection 12/16/2009 In Compliance MCNEIL_AP_1 0/2 Routine Compliance
 
Site Inspection 09/25/2008 In Compliance MCNEIL_AP_1 0/2 Routine Compliance
 
Site Inspection 09/05/2007 In Compliance MCNEIL_AP_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/15/2007 Satisfied MCNEIL_AP_1 Routine Compliance
 
Emergency Preparedness Information 10/02/2006 Satisfied MCNEIL_AP_1 Routine Compliance
 
Site Inspection 08/30/2006 In Compliance MCNEIL_AP_1 0/2 Routine Compliance
 
 
 
No Open AOCs Found
 
 
No Open Violations Found
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
08/17/1998   COMPLETED 63 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
11/30/1994   COMPLETED 63 ABANDONED TANK RESTORATION PROGRAM-PARTIAL