![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | State Government | ||||||||
County | Hardee | Status | OPEN | ||||||||
ID | 9200005 | Latitude | 27° 35' 24.3816 | ||||||||
Name |
FL DEPT OF CORRECTIONS-HARDEE CI 6901 SR 62 |
Longitude | 82° 1' 2.0028 | ||||||||
BOWLING GREEN, FL 33834 | LL Method | DPHO | |||||||||
Contact | JOHN TOLLIVER | LL Status | REVIEWED | ||||||||
Phone | (863) 767-3054 | Status Date | 04/16/2010 | ||||||||
Account Owner Information | |||||||||||
Name | FL DEPT OF CORRECTIONS 501 S CALHOUN ST TALLAHASSEE, FL 32399-2500 |
Effective Date | 05/18/1992 | ||||||||
Contact | BING XU / CHASE LACKEY 850-717-3973 | ||||||||||
Phone | (850) 717-3626 | ||||||||||
BING.XU@FDC.MYFLORIDA.COM | |||||||||||
Placard # / Date | 700783 - 08/19/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | FL DEPT OF CORRECTIONS 501 S CALHOUN ST TALLAHASSEE, FL 32399-2500 |
Effective Date | 05/12/2006 | ||||||||
Contact | BING XU / CHASE LACKEY 850-717-3973 | ||||||||||
Phone | (850) 717-3626 | ||||||||||
BING.XU@FDC.MYFLORIDA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 7500 | Vehicular Diesel (D) | 02/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2500 | Emerg Generator Diesel (G) | 02/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1600 | Emerg Generator Diesel (G) | 02/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 02/01/1991 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 2423 | Emerg Generator Diesel (G) | 09/01/2018 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (N) Approved synthetic material |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 2200 | Emerg Generator Diesel (G) | 02/01/1995 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 01/01/2021 | 12/31/2021 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 01/01/2018 | 01/01/2019 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 09/16/2009 | 09/16/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/09/2005 | 08/22/2005 | IN-COMPLIANCE | SLAPPEY_W | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes 4 PHOTOS TAKEN. PIPING-ABOVEGROUND SINGLE WALL STEEL. RESOLVES VIOLATION #2110, & 2131. | |||||||||||
CWOE | 08/09/2005 | 08/22/2005 | SLAPPEY_W | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 06/12/2005 | 07/05/2005 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FOLLOW-UP VIOLATION LETTER. | |||||||||||
NCLI | 05/29/2005 | 05/29/2005 | SACLARIDES_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/12/2005 | 05/29/2005 | MINOR OUT-OF-COMPLIANCE | SACLARIDES_M | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes 3 PHOTOS TAKEN. PIPING-ABOVEGROUND STEEL. | |||||||||||
TCI | 05/24/2004 | 06/10/2004 | IN-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
TCR | 03/13/2003 | 04/08/2003 | IN-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes 9 PHOTOS TAKEN. RESOLVES VIOLATION #144 & #169. | |||||||||||
CWOE | 03/13/2003 | 04/08/2003 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 01/07/2003 | 01/08/2003 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/23/2002 | 01/08/2003 | MINOR OUT-OF-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes RESOLVE VIOLATION #70. | |||||||||||
NCLI | 11/30/2001 | 12/05/2001 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/15/2001 | 12/05/2001 | MINOR OUT-OF-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
CALL | 11/08/2001 | 12/05/2001 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SCHEDULE TCI | |||||||||||
TCI | 11/28/2000 | 12/06/2000 | IN-COMPLIANCE | COOK | 5/0 | COMPLIANCE ASSURANCE | |||||
TCR | 06/19/2000 | 07/05/2000 | IN-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/28/1999 | 12/09/1999 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/28/1999 | 07/05/2000 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/08/1999 | 09/24/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | COOK_J | 5/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 08/24/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 08/24/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 08/24/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 08/24/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 08/24/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Letter | 06/29/2021 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/29/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 06/29/2021 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/29/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 06/29/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 06/29/2021 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Site Inspection | 06/29/2021 | Major Out of Compliance | JARRETT_SE_1 | 5/0 | Routine Compliance | ||||||
Electronic Communication | 06/29/2021 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Enforcement Tracking | 01/04/2019 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||||||
Letter | 01/03/2019 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 01/03/2019 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Phone Conversation | 12/25/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Letter | 12/25/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Site Inspection | 12/25/2018 | In Compliance | JARRETT_SE_1 | 5/0 | Compliance Assistance | ||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Site Inspection | 12/25/2018 | In Compliance | JARRETT_SE_1 | 1/0 | Installation | ||||||
Letter | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 12/25/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Meeting | 11/01/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 10/11/2018 | Satisfied | KENNEDY_S | Enforcement | |||||||
Phone Conversation | 10/08/2018 | Satisfied | KENNEDY_S | Enforcement | |||||||
Incident | 10/06/2018 | Has not led to Discharge | JARRETT_SE_1 | Incident | |||||||
Phone Conversation | 10/06/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Document Management | 10/06/2018 | Satisfied | JARRETT_SE_1 | Incident | |||||||
Letter | 10/06/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 10/06/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Phone Conversation | 10/06/2018 | Satisfied | JARRETT_SE_1 | Closure | |||||||
Electronic Communication | 10/06/2018 | Satisfied | JARRETT_SE_1 | Installation | |||||||
Site Inspection | 10/06/2018 | Major Out of Compliance | JARRETT_SE_1 | 1/0 | Closure | ||||||
Electronic Communication | 10/06/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 10/04/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Meeting | 07/30/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 07/06/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Meeting | 07/06/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 07/06/2018 | Satisfied | KENNEDY_S | Enforcement | |||||||
Enforcement Referral | 06/19/2018 | Accepted | JARRETT_SE_1 | Enforcement | |||||||
Electronic Communication | 06/07/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Record Document | 05/10/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Phone Conversation | 05/10/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Phone Conversation | 05/10/2018 | Satisfied | KENNEDY_S | Routine Compliance | |||||||
Electronic Communication | 05/10/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Phone Conversation | 05/10/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Phone Conversation | 05/10/2018 | Satisfied | KENNEDY_S | Compliance Assistance | |||||||
Letter | 05/09/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 05/09/2018 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Site Inspection | 05/09/2018 | Major Out of Compliance | JARRETT_SE_1 | 5/0 | Routine Compliance | ||||||
Electronic Communication | 05/08/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 05/08/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 05/08/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 05/08/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 05/08/2018 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 03/27/2017 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Site Inspection | 03/27/2017 | In Compliance | JARRETT_SE_1 | 5/0 | Non-Compliance | ||||||
Electronic Communication | 03/20/2017 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Letter | 03/12/2017 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Phone Conversation | 03/12/2017 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Electronic Communication | 03/12/2017 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||||||
Letter | 06/23/2015 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Site Inspection | 06/23/2015 | Minor Out of Compliance | MERRYMAN_DT_1 | 5/0 | Routine Compliance | ||||||
Electronic Communication | 06/23/2015 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||||||
Site Inspection | 12/07/2012 | In Compliance | NEWBERG_DR_1 | 5/0 | Routine Compliance | ||||||
Letter | 02/03/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Phone Conversation | 01/24/2011 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Letter | 12/13/2010 | Satisfied | BELL_JM_1 | Non-Compliance | |||||||
Site Inspection | 12/13/2010 | Minor Out of Compliance | BELL_JM_1 | 5/0 | Routine Compliance | ||||||
Electronic Communication | 12/11/2009 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 09/28/2009 | Minor Out of Compliance | WINN_JP_1 | 5/0 | Routine Compliance | ||||||
Letter | 09/28/2009 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Phone Conversation | 09/28/2009 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Site Inspection | 08/22/2008 | In Compliance | NEWBERG_DR_1 | 5/0 | Routine Compliance | ||||||
Phone Conversation | 08/22/2008 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Site Inspection | 05/24/2007 | In Compliance | WINN_JP_1 | 5/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/29/2021 | 5114 | Minor | 3.4 Shop fabricated storage tank system has a not repaired component which has or could cause a release or discharge. | Leakage must be repaired and the Department contacted for inspection. | |||||||
06/29/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | Corrosion must be addressed, and the Department contacted for inspection. | |||||||
06/29/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | The top of the tank must be cleaned, the corroded areas addressed, and the Department contacted for inspection. | |||||||
06/29/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | Corrosion must be addressed and the Department contacted for inspection. | |||||||
06/29/2021 | 5126 | Minor | 3.16 Spill containment, sumps, and interstices not accessible. Water/regulated substance not timely removed for shop fabricated storage tank systems. Petroleum contact water not properly managed. | Containments must be cleaned, the petroleum contact water disposed of properly, and the Department contacted for inspection. | |||||||
06/29/2021 | 5102 | Minor | 3.3 Shop fabricated storage tank system release detection devices not tested annually. | Therefore, either provide the test records or perform the test immediately and submit the test results to the Department. | |||||||
06/29/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | Corrosion must be addressed with the Department contacted for inspection. | |||||||
06/29/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | Corrosion must be addressed with the Department contacted for inspection. | |||||||
06/29/2021 | 5114 | Minor | 3.4 Shop fabricated storage tank system has a not repaired component which has or could cause a release or discharge. | Containments must be cleaned with the areas of cracked and peeled sealant resealed using FDEP approved sealant and the Department contacted for inspection. | |||||||
06/29/2021 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Therefore, either provide the test records or perform the test immediately and submit the test results to the Department. | |||||||
No Discharges Found |