![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Southeast | Type | County Government | ||||
County | Miami-Dade | Status | OPEN | ||||
ID | 9200477 | Latitude | 25° 46' 32.7903 | ||||
Name |
DADE CNTY COURTHOUSE CENTER 175 NW 1ST AVE |
Longitude | 80° 11' 41.6799 | ||||
MIAMI, FL 33130 | LL Method | DPHO | |||||
Contact | ROBBEN HARDUARSINGH | LL Status | REVIEWED | ||||
Phone | (305) 349-5505 | Status Date | 05/27/2003 | ||||
Account Owner Information | |||||||
Name | MIAMI DADE CNTY-GSA 175 NW 1ST AVE #152 MIAMI, FL 33128 |
Effective Date | 06/26/2002 | ||||
Contact | ROBBEN HARDUARSINGH | ||||||
Phone | (305) 349-5505 | ||||||
JCIZQ@MIAMIDADE.GOV | |||||||
Placard # / Date | 667934 - 07/10/2023 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 2500 | Emerg Generator Diesel (G) | 09/01/1998 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket |
(B) Steel/galvanized metal (I) Suction piping system (M) Double wall - pipe jacket |
(F) Monitor dbl wall tank space (I) Not required (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 550 | Emerg Generator Diesel (G) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass | (B) Steel/galvanized metal | (I) Not required (N) Groundwater monitoring |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2024 | 01/31/2025 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2023 | 01/31/2024 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2022 | 01/31/2023 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2021 | 01/31/2022 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2018 | 01/31/2019 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 05/05/2015 | 05/05/2016 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/05/2013 | 02/05/2014 | |||||
LOCAL GOVERNMENTS - FINANCIAL TEST | 11/21/2005 | 11/20/2006 | |||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 11/15/2004 | 12/11/2004 | IN-COMPLIANCE | BUSEN_K | 0/1 | COMPLIANCE ASSURANCE | |
CWOE | 06/05/2003 | 06/06/2003 | JENNIFER SMITH | 0/0 | COMPLIANCE ASSURANCE | ||
RRBD | 06/05/2003 | 06/06/2003 | JENNIFER SMITH | 0/0 | COMPLIANCE ASSURANCE | ||
TCI | 04/29/2003 | 05/23/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | JENNIFER SMITH/NICOLE KUEHLE | 0/1 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Enforcement Referral | 10/16/2024 | Accepted | SABIR_A | Enforcement | |||
Site Inspection | 09/25/2024 | Major Out of Compliance | SABIR_A | 0/1 | Routine Compliance | ||
Electronic Communication | 05/21/2024 | Satisfied | SABIR_A | Routine Compliance | |||
Electronic Communication | 10/19/2021 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Electronic Communication | 10/19/2021 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Letter | 10/19/2021 | Satisfied | WILLIAMS_CEW | Compliance Assistance | |||
Letter | 09/17/2021 | Satisfied | LANDFIELD_J | Routine Compliance | |||
Electronic Communication | 09/16/2021 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Site Inspection | 06/21/2021 | Major Out of Compliance | WILLIAMS_CEW | 0/1 | Routine Compliance | ||
Phone Conversation | 08/09/2018 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Letter | 08/08/2018 | Satisfied | WILLIAMS_CEW | Compliance Assistance | |||
Site Inspection | 06/27/2018 | Minor Out of Compliance | WILLIAMS_CEW | 0/1 | Routine Compliance | ||
Site Inspection | 09/14/2015 | In Compliance | BROWN_SE | 0/1 | Routine Compliance | ||
Phone Conversation | 09/03/2015 | Satisfied | BROWN_SE | Routine Compliance | |||
Site Inspection | 01/03/2014 | In Compliance | WILLIAMS_CEW | 0/1 | Routine Compliance | ||
Letter | 03/13/2013 | Satisfied | WILLIAMS_CEW | Non-Compliance | |||
Site Inspection | 03/07/2013 | Minor Out of Compliance | WILLIAMS_CEW | 0/1 | Routine Compliance | ||
Phone Conversation | 04/04/2012 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Letter | 10/26/2010 | Satisfied | WILLIAMS_CEW | Non-Compliance | |||
Site Inspection | 10/26/2010 | Minor Out of Compliance | WILLIAMS_CEW | 0/1 | Routine Compliance | ||
Record Document | 07/26/2010 | Satisfied | JACKSON_ME | Routine Compliance | |||
Letter | 11/23/2009 | Satisfied | JACKSON_ME | Non-Compliance | |||
Site Inspection | 11/19/2009 | Major Out of Compliance | JACKSON_ME | 0/1 | Routine Compliance | ||
Site Inspection | 04/17/2007 | Minor Out of Compliance | WHITE_CM | 0/1 | Routine Compliance | ||
Record Document | 04/16/2007 | Satisfied | WHITE_CM | Routine Compliance | |||
Issue Document | 04/16/2007 | Satisfied | WHITE_CM | Routine Compliance | |||
Record Document | 03/09/2007 | Satisfied | QURESHI_SA | Non-Compliance | |||
Letter | 02/27/2007 | Satisfied | QURESHI_SA | Non-Compliance | |||
Record Document | 02/27/2007 | Satisfied | QURESHI_SA | Non-Compliance | |||
Site Inspection | 07/09/2006 | Major Out of Compliance | BARATH_J | 0/2 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
05/21/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Submit the integrity testing for the overspill containment sump dated after 8/7/2021. | |||
05/21/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide the integrity test for the piping containment sump dated after 8/7/2021. | |||
05/08/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Submit the operator training certificate for the designated person(s) at the facility in accordance with 62-761.350 Operator Training and Certification. 62-761.350 Operator Training and Certification. (1) Owners or operators shall identify and designate for each in-service underground storage tank system facility, including unmanned facilities, at least one named individual for each class of operator – Class A, Class B, and Class C. All individuals designated as a Class A, B or C operator shall, at a minimum, be trained and certified in accordance with this rule. | |||
04/30/2024 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Complete an Incident Notification Form and conduct investigation to determine the source and cause of the apparent release. Keep the document as a part of the storage tank system's permanent records. | |||
04/30/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide the annual operability overfill protection testing for the storage tank dated after 8/7/2021, 2022, and 2023. | |||
04/30/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide the release detection operability testing for the storage tank dated after 8/7/2021,2022, and 2023. | |||
No Discharges Found |