![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Levy | Status | OPEN | ||||||||
ID | 9200588 | Latitude | 29° 19' 35.7579 | ||||||||
Name |
MARTINS COUNTRY STORE 230 SE HWY 19 |
Longitude | 82° 46' 7.2157 | ||||||||
OTTER CREEK, FL 32683 | LL Method | DPHO | |||||||||
Contact | BETTY MARTIN | LL Status | REVIEWED | ||||||||
Phone | (352) 262-1735 | Status Date | 02/01/2024 | ||||||||
Account Owner Information | |||||||||||
Name | MARTINS COUNTRY STORE P.O. BOX 156 OTTER CREEK, FL 32683 |
Effective Date | 09/09/2013 | ||||||||
Contact | BETTY MARTIN | ||||||||||
Phone | (352) 262-1735 | ||||||||||
Placard # / Date | 643367 - 07/12/2022 | ||||||||||
Property Owner Information | |||||||||||
Name | MARTIN, BETTY PO BOX 156 OTTER CREEK, FL 32683 |
Effective Date | 04/02/2008 | ||||||||
Contact | CLAYTON OR BETTY MARTIN | ||||||||||
Phone | (904) 486-4639 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 05/01/1996 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (I) Double wall (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (W) Built on supports |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Unleaded Gas (B) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Unleaded Gas (B) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 2000 | Unleaded Gas (B) | 07/01/1977 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 11/01/2020 | 11/01/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 11/01/2019 | 11/01/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 11/01/2018 | 11/01/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 11/01/2017 | 11/01/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2015 | 12/11/2016 | COMMERCIAL INSURANCE | ||||||||
INSURANCE | 12/11/2014 | 12/11/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2013 | 12/11/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2011 | 12/11/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2011 | 12/11/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2009 | 12/11/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/11/2008 | 12/11/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/21/1993 | 06/21/1996 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 11/09/2004 | 12/07/2004 | IN-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/30/2003 | 10/01/2003 | IN-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 06/20/2003 | 06/20/2003 | IN-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEW PLACARD (2003-2004) ON DISPLAY | |||||||||||
TCI | 09/19/2002 | 10/03/2002 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 01/02/2002 | 01/07/2002 | IN-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CHECKED MONTHLY RELEASE DETECTION/VISUAL INSPECTIONS | |||||||||||
TCI | 10/10/2001 | 10/19/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/27/2000 | 11/01/2000 | IN-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/11/2000 | 01/19/2000 | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/12/1999 | 10/12/1999 | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 08/31/1999 | 08/31/1999 | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/18/1999 | 08/31/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | SHEFFIELD_C | 1/0 | COMPLIANCE ASSURANCE | |||||
ATCI | 06/23/1998 | 07/10/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 01/16/2024 | Satisfied | MILLS_MM | Enforcement | |||||||
Enforcement Referral | 08/25/2023 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Phone Conversation | 03/31/2021 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 03/31/2021 | Major Out of Compliance | KEIM_MJ_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 06/12/2018 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||||||
Site Inspection | 06/12/2018 | Major Out of Compliance | KEIM_MJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 06/12/2018 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||||||
Meeting | 03/04/2015 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 10/29/2014 | Minor Out of Compliance | SHULAW_BJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 10/29/2014 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 08/09/2012 | In Compliance | OYMAYAN_AJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 01/12/2012 | In Compliance | SHULAW_BJ_1 | 1/0 | Routine Compliance | ||||||
Meeting | 12/06/2010 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Letter | 10/08/2010 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 10/08/2010 | Major Out of Compliance | SHULAW_BJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 08/03/2009 | In Compliance | SHULAW_BJ_1 | 1/0 | Non-Compliance | ||||||
Letter | 07/22/2009 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Letter | 03/31/2009 | Satisfied | SHULAW_BJ_1 | Non-Compliance | |||||||
Site Inspection | 03/31/2009 | Minor Out of Compliance | SHULAW_BJ_1 | 1/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/26/2008 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Site Inspection | 01/11/2008 | In Compliance | KASSEES_RP_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 02/24/2007 | In Compliance | KASSEES_RP_1 | 1/0 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Site Inspection | 12/11/2006 | Minor Out of Compliance | KASSEES_RP_1 | 1/0 | Routine Compliance | ||||||
Letter | 12/11/2006 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/12/2018 | 5094 | SNC-B | 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. | Conduct the visual inspections and document the results or findings on the form provided | |||||||
06/12/2018 | 5144 | Minor | 1.7 Records requiring 3 year documentation period not kept by facility. | All test data and results gathered during annual operability tests and integrity tests. Please provide visual inspections and contractor performed integrity evaluation of the in-service status system and forward results to the inspector to address this violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/13/1996 | ACTIVE | 10 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | RICH_DR | |||||||