![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9201517 | Latitude | 27° 48' 42.2495 | ||||||||
Name |
MAD BEACH BOAT AND JET SKI RENTALS 8612 BAY PINES BLVD |
Longitude | 82° 45' 37.1764 | ||||||||
SAINT PETERSBURG, FL 33709-4010 | LL Method | DPHO | |||||||||
Contact | TODD BAKER | LL Status | REVIEWED | ||||||||
Phone | (224) 231-8371 | Status Date | 10/17/2003 | ||||||||
Account Owner Information | |||||||||||
Name | MARINA INVESTMENT TRUST 8612 BAY PINES BLVD ST PETERSBURG, FL 33709 |
Effective Date | 11/30/2017 | ||||||||
Contact | MICHAEL SAGLIO | ||||||||||
Phone | (727) 384-3059 | ||||||||||
LIGHTHOUSEPOINTMARINA@VERIZON.NET | |||||||||||
Placard # / Date | 694780 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MARINA INVESTMENT TRUST 8612 BAY PINES BLVD ST PETERSBURG, FL 33709 |
Effective Date | 11/30/2017 | ||||||||
Contact | MICHAEL SAGLIO | ||||||||||
Phone | (727) 384-3059 | ||||||||||
LIGHTHOUSEPOINTMARINA@VERIZON.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 12/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | |||||||||||
INSURANCE | 07/08/2023 | 07/20/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 07/20/2021 | 07/20/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/20/2020 | 07/20/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/20/2019 | 07/20/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/20/2018 | 07/20/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/20/2017 | 07/20/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/07/2013 | 08/07/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/26/2012 | 05/26/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/26/2011 | 05/26/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/26/2010 | 05/26/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/10/2009 | 05/10/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/03/1994 | 10/03/1996 | PLUS | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 11/29/2005 | 12/06/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 11/21/2005 | 11/29/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/18/2005 | 11/29/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FRAZIER | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/21/2005 | 03/24/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 01/25/2005 | 02/21/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SUBMITTAL OF LLD AND SENSOR TEST RESULTS - OK - 1/17/05 | |||||||||||
NCLI | 01/12/2005 | 01/18/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/06/2005 | 01/18/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | BARNETT | 0/1 | COMPLIANCE ASSURANCE | |||||
LTR | 04/22/2004 | 04/28/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/21/2004 | 04/28/2004 | IN-COMPLIANCE | PINK | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP PIPE | |||||||||||
RRBD | 05/19/2003 | 06/11/2003 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 04/07/2003 | 04/14/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/04/2003 | 04/14/2003 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPE TYPE NOT CERTAIN | |||||||||||
RRBD | 05/23/2002 | 05/29/2002 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 04/18/2002 | 05/06/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/16/2002 | 05/05/2002 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 12/27/2000 | 12/28/2000 | IN-COMPLIANCE | CASTOR | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/18/2000 | 06/05/2000 | CASTOR | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/10/2000 | 04/24/2000 | MINOR OUT-OF-COMPLIANCE | CASTOR | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 04/08/1999 | 04/09/1999 | MINOR OUT-OF-COMPLIANCE | SOWERS | 0/1 | COMPLIANCE ASSURANCE | |||||
UTCR | 06/20/1997 | 06/25/1997 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 04/26/2024 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Site Inspection | 03/21/2024 | Major Out of Compliance | PUHR_NM_1 | 0/1 | Routine Compliance | ||||||
Letter | 03/21/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/27/2023 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Record Document | 04/14/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 04/14/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
TCAR | 06/06/2022 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Letter | 06/06/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 06/06/2022 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/01/2022 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Electronic Communication | 12/05/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 12/05/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 12/05/2019 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 11/07/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 11/20/2017 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Installation | ||||||
Letter | 11/20/2017 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
TCAR | 11/08/2017 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Letter | 11/08/2017 | Satisfied | SOWERS_JA_1 | Closure | |||||||
Site Inspection | 07/19/2017 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Closure | ||||||
Letter | 07/19/2017 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 06/29/2017 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Closure | ||||||
Letter | 06/29/2017 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 03/10/2017 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Routine Compliance | ||||||
Letter | 03/10/2017 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Phone Conversation | 02/08/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Enforcement Referral | 12/01/2015 | Accepted | PEDIGO_L | Enforcement | |||||||
Electronic Communication | 10/09/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 10/09/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 05/04/2015 | Major Out of Compliance | COLSON_NJ_1 | 0/1 | Complaint | ||||||
Letter | 05/04/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 04/30/2014 | Minor Out of Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/30/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Meeting | 09/20/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/07/2013 | Major Out of Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Letter | 06/07/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 04/26/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 04/26/2013 | Minor Out of Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 10/06/2011 | In Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Record Document | 09/12/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 07/25/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 07/21/2011 | Major Out of Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 07/21/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 07/21/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 08/12/2010 | In Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 07/23/2010 | In Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 07/21/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Phone Conversation | 06/17/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 06/11/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/11/2010 | Major Out of Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Letter | 10/05/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 10/05/2009 | Minor Out of Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 09/28/2009 | Minor Out of Compliance | STRAUSS_RH_1 | 0/1 | Routine Compliance | ||||||
Letter | 09/28/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 08/06/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 08/06/2008 | Minor Out of Compliance | BARNETT_JX | 0/1 | Routine Compliance | ||||||
Record Document | 02/29/2008 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 08/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 08/28/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 08/28/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 07/13/2007 | Major Out of Compliance | LONGEN_JL_1 | 2/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/21/2024 | 6023 | Minor | 4.1 Secondary containment or integral piping not installed to allow for monitoring point. | The clamps on the test boot need to be loosened. Open up the pipe interstice in the STP Sump to allow for a monitoring point. | |||||||
03/21/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Submit 2023 testing if found. Submit annual operability testing for the overfill protection device for 2024 (or current). | |||||||
03/21/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Submit FR documentation for this period. (Part P & Part D). | |||||||
03/21/2024 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | *Submit an integrity test for the Rec 90 spill bucket.* | |||||||
03/21/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Submit 2023 testing if found. Submit current annual operability test results for the line leak detector and the spill bucket VisiGauge. | |||||||
04/14/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Be sure to perform release detection inspections every month & no more than 35 days apart. Maintain records for at least 36 months. Submit records for consecutive months, showing proper inspections are being performed & documented. | |||||||
04/14/2023 | 6077 | Minor | 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. | Maintain Out of Service requirements for the Diesel tank compartment. Remove any accumulated liquids in the Diesel tank compartment. Schedule a Re-Inspection with the Local Tanks Program Office. Otherwise, all Diesel system components need to be returned to compliance with the In Service requirements. | |||||||
06/06/2022 | 6001 | Minor | 2.1 No reasonable access provided. | Gain access to the tank interstice port for manual inspection. Then, schedule a Re-Inspection with this office. | |||||||
06/06/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Replace the damaged hose. Notify this office once corrected. | |||||||
06/06/2022 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Paint the Rec 90 spill bucket lid blue. Notify this office once completed. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/24/1996 | COMPLETED | ||||||||||