![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Local Government | ||||||||
County | Sarasota | Status | OPEN | ||||||||
ID | 9201543 | Latitude | 27° 7' 56.7737 | ||||||||
Name |
VENICE CITY-E WWTP 3510 LAUREL RD |
Longitude | 82° 24' 3.3679 | ||||||||
NOKOMIS, FL 34275 | LL Method | DPHO | |||||||||
Contact | TRAVIS HOUT | LL Status | REVIEWED | ||||||||
Phone | (941) 486-2422 | Status Date | 01/29/2015 | ||||||||
Account Owner Information | |||||||||||
Name | VENICE CITY 401 W VENICE AVE Venice, FL 34285-2006 |
Effective Date | 06/11/1992 | ||||||||
Contact | ALAN BULLOCK | ||||||||||
Phone | (941) 486-2626 | ||||||||||
ABULLOCK@VENICEFL.GOV | |||||||||||
Placard # / Date | 685882 - 06/10/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | VENICE CITY 401 W VENICE AVE Venice, FL 34285-2006 |
Effective Date | 03/13/2024 | ||||||||
Contact | ALAN BULLOCK | ||||||||||
Phone | (941) 486-2626 | ||||||||||
ABULLOCK@VENICEFL.GOV | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 2000 | Unleaded Gas (B) | 10/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Vehicular Diesel (D) | 04/01/2023 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3500 | Vehicular Diesel (D) | 01/01/1991 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Emerg Generator Diesel (G) | 10/01/2001 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (C) Fiberglass (F) Double wall (I) Suction piping system |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 2000 | Unleaded Gas (B) | 10/01/2001 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/01/2023 | 10/01/2024 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 10/01/2022 | 10/01/2023 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 10/01/2021 | 10/01/2022 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 10/01/2019 | 10/01/2021 | ALLIED WORLD ASSURACE COMPANY (U.S.) INC | ||||||||
INSURANCE | 10/01/2017 | 10/01/2018 | ALLIED WORLD | ||||||||
INSURANCE | 10/01/2015 | 10/01/2016 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2013 | 10/01/2015 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2012 | 10/01/2013 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2011 | 10/01/2012 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2010 | 10/01/2011 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2009 | 09/30/2010 | INDIAN HARBOR | ||||||||
INSURANCE | 10/01/2008 | 09/30/2009 | ILLINOIS UNION | ||||||||
INSURANCE | 10/01/2007 | 10/01/2008 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/26/2005 | 09/28/2005 | IN-COMPLIANCE | WALL | 3/0 | COMPLIANCE ASSURANCE | |||||
TCR | 02/15/2005 | 02/17/2005 | IN-COMPLIANCE | WALL | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/20/2004 | 09/21/2004 | MINOR OUT-OF-COMPLIANCE | WALL | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/15/2003 | 09/16/2003 | IN-COMPLIANCE | WALL | 3/0 | COMPLIANCE ASSURANCE | |||||
TIN | 03/11/2003 | 03/11/2003 | IN-COMPLIANCE | WALL | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/24/2002 | 07/25/2002 | IN-COMPLIANCE | WALL | 2/0 | COMPLIANCE ASSURANCE | |||||
TIN | 03/07/2002 | 03/12/2002 | IN-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/26/2001 | 07/26/2001 | IN-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/28/2000 | 07/31/2000 | IN-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
TIN | 01/13/2000 | 01/18/2000 | IN-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/13/2000 | 01/13/2000 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
CWOE | 12/16/1999 | 12/17/1999 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/16/1999 | 12/17/1999 | WALL | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 12/16/1999 | 12/17/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/27/1999 | 08/30/1999 | MINOR OUT-OF-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/16/1999 | 06/18/1999 | MINOR OUT-OF-COMPLIANCE | WALL | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/12/2024 | Accepted | TYKOSKI_B_1 | Enforcement | |||||||
Site Inspection | 03/19/2024 | Major Out of Compliance | TYKOSKI_B_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 03/19/2024 | Satisfied | TYKOSKI_B_1 | Compliance Assistance | |||||||
Electronic Communication | 03/13/2024 | Satisfied | TYKOSKI_B_1 | Routine Compliance | |||||||
Letter | 08/07/2023 | Satisfied | GIANQUINTO_T_1 | Closure | |||||||
Letter | 07/12/2023 | Satisfied | GIANQUINTO_T_1 | Installation | |||||||
Site Inspection | 06/29/2023 | In Compliance | MURPHY_MA_1 | 2/0 | Installation | ||||||
Electronic Communication | 06/07/2023 | Satisfied | MURPHY_MA_1 | Installation | |||||||
Site Inspection | 06/07/2023 | In Compliance | MURPHY_MA_1 | 2/0 | Closure | ||||||
Electronic Communication | 06/07/2023 | Satisfied | MURPHY_MA_1 | Closure | |||||||
Electronic Communication | 06/07/2023 | Satisfied | MURPHY_MA_1 | Closure | |||||||
Electronic Communication | 06/07/2023 | Satisfied | MURPHY_MA_1 | Installation | |||||||
Letter | 03/23/2021 | Satisfied | GIANQUINTO_T_1 | Routine Compliance | |||||||
Site Inspection | 02/28/2021 | In Compliance | MURPHY_MA_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 02/26/2021 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Letter | 02/05/2019 | Satisfied | HICKEY_JT_1 | Compliance Assistance | |||||||
Record Document | 01/17/2019 | Satisfied | MURPHY_MA_1 | Compliance Assistance | |||||||
Letter | 09/06/2018 | Satisfied | MURPHY_MA_1 | Compliance Assistance | |||||||
Site Inspection | 08/31/2018 | Major Out of Compliance | MURPHY_MA_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 08/30/2018 | Satisfied | MURPHY_MA_1 | Routine Compliance | |||||||
Electronic Communication | 08/23/2016 | Satisfied | RAMSEY_TH_2 | Routine Compliance | |||||||
Phone Conversation | 08/23/2016 | Satisfied | RAMSEY_TH_2 | Routine Compliance | |||||||
Site Inspection | 08/23/2016 | In Compliance | RAMSEY_TH_2 | 2/0 | Routine Compliance | ||||||
Site Inspection | 01/29/2015 | In Compliance | WALL_KD_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 07/16/2013 | In Compliance | WALL_KD_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 05/23/2012 | In Compliance | WALL_KD_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 05/10/2011 | In Compliance | WALL_KD_1 | 2/0 | Routine Compliance | ||||||
Record Document | 10/07/2010 | Satisfied | WALL_KD_1 | Closure | |||||||
Record Document | 08/13/2010 | Satisfied | WALL_KD_1 | Closure | |||||||
Site Inspection | 07/29/2010 | In Compliance | WALL_KD_1 | 1/0 | Closure | ||||||
Site Inspection | 06/21/2010 | In Compliance | ANDERS_DT_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 09/09/2008 | In Compliance | ANDERS_DT_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 10/30/2007 | In Compliance | ANDERS_DT_1 | 3/0 | Routine Compliance | ||||||
Letter | 01/03/2007 | Satisfied | ANDERS_DT_1 | Non-Compliance | |||||||
Site Inspection | 10/20/2006 | In Compliance | WALL_KD_1 | 3/0 | Installation | ||||||
Site Inspection | 10/10/2006 | In Compliance | WALL_KD_1 | 3/0 | Closure | ||||||
Site Inspection | 09/27/2006 | In Compliance | ANDERS_DT_1 | 3/0 | Routine Compliance | ||||||
Letter | 09/27/2006 | Satisfied | ANDERS_DT_1 | Non-Compliance | |||||||
Phone Conversation | 08/25/2006 | Satisfied | ANDERS_DT_1 | Non-Compliance | |||||||
Letter | 08/03/2006 | Satisfied | ANDERS_DT_1 | Non-Compliance | |||||||
Site Inspection | 08/03/2006 | In Compliance | ANDERS_DT_1 | 1/0 | Non-Compliance | ||||||
Record Document | 07/18/2006 | Satisfied | WALL_KD_1 | Installation | |||||||
Phone Conversation | 06/20/2006 | Satisfied | ANDERS_DT_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/15/2024 | 7012 | SNC-B | 3.3 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Complete and submit Incident Notification Form (INF) for the stained concrete under the remote fill/spill container. If discharge did occur determine if it requires a Discharge Notification Form (DNF) submittal. Recommend using a secondary container when draining remote fill/spill container. | |||||||
03/11/2024 | 7058 | Minor | 3.2 Valves do not meet standards of Section 7 of PEI/RP200-13 for piping systems with gravity head. | Install the components in the correct order in accordance with PEI/RP200 on the piping to the generator (painted red). Correct order is: tank > block valve > anti-siphon valve. Email photo of completed repairs to petroleumstorage@scgov.net | |||||||
03/11/2024 | 7090 | Minor | 3.15 Spill containment, dispenser liners and piping sumps not accessible; water and regulated substances not removed. | Locate or replace key and provide photos of dispenser components and sump to petroleumstorage@scgov.net. | |||||||
03/11/2024 | 7090 | Minor | 3.15 Spill containment, dispenser liners and piping sumps not accessible; water and regulated substances not removed. | Remove Petroleum Contact Water within 72 hours of discovery, and be either reused or properly disposed.Email photos of drained dispenser sump to petroleumstorage@scgov.net. | |||||||
03/11/2024 | 7103 | Minor | 1.12 Registration not updated for closure of storage tank system. | Complete and submit Storage Tank Facility Registration Form for the closure (Status code B) by emailing the document to tankregistration@floridadep.gov. Forms and instructions can be located at the following website: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration | |||||||
03/11/2024 | 7125 | SNC-A | 1.17 Owner, operator, or supplier deposited motor fuel into storage tank without current valid registration placard. | Complete and submit Storage Tank Facility Registration Forms for both the tank closure (Status code B) and tank new registration (Status code U) by emailing the documents to tankregistration@floridadep.gov. Forms and instructions can be located at the following website: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration | |||||||
03/11/2024 | 7043 | Minor | 1.11 Fillbox covers not marked according to requirements. | Due to the requirement changing effective June 25, 2024, recommend using API RP 1637, 4th Edition, April 2020 standards, rather than API RP 1637, (R2012) 3rd Edition, July 2006. That way you do not need to change them in June. Once the product markings have been completed, send photos to petroleumstorage@scgov.net. | |||||||
03/11/2024 | 7002 | Minor | 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Complete and submit Storage Tank Facility Registration Form for both the closure (Status code B) and new registration (Status code U) by emailing the documents to tankregistration@floridadep.gov. Forms and instructions can be located at the following website: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration | |||||||
No Discharges Found |