![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9202639 | Latitude | 28° 2' 18.0101 | ||||||||
Name |
MORTON PLANT MEASE HEALTH CARE 3231 MCMULLEN BOOTH RD |
Longitude | 82° 42' 25.5009 | ||||||||
SAFETY HARBOR, FL 34695-6607 | LL Method | DPHO | |||||||||
Contact | STEPHANIE BOGART | LL Status | REVIEWED | ||||||||
Phone | (727) 725-6140 | Status Date | 04/20/2004 | ||||||||
Account Owner Information | |||||||||||
Name | MORTON PLANT MEASE HEALTH CARE 303 PINELLAS ST #310 Clearwater, FL 33756 |
Effective Date | 09/24/1998 | ||||||||
Contact | KAREN FRITTS | ||||||||||
Phone | (727) 461-8068 | ||||||||||
STEPHANIE.BOGART@BAYCARE.ORG | |||||||||||
Placard # / Date | 680876 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MORTON PLANT MEASE HEALTH CARE 3231 McMullen Booth Rd Safety Harbor, FL 34695-6607 |
Effective Date | 03/12/2024 | ||||||||
Contact | STEPHANIE BOGART | ||||||||||
Phone | (727) 725-6140 | ||||||||||
STEPHANIE.BOGART@BAYCARE.ORG | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 40000 | Emerg Generator Diesel (G) | 07/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 40000 | Emerg Generator Diesel (G) | 07/01/2013 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (F) Double wall (J) Pressurized piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Emerg Generator Diesel (G) | 05/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (O) Tight fill |
(B) Steel/galvanized metal (I) Suction piping system |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 5000 | Emerg Generator Diesel (G) | 08/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Vehicular Diesel (D) | 08/01/1998 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Emerg Generator Diesel (G) | 05/01/2004 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/01/2022 | 10/01/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 10/01/2021 | 10/01/2022 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 10/01/2020 | 10/01/2021 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 10/01/2018 | 10/01/2020 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 10/01/2016 | 10/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 10/01/2015 | 10/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 10/01/2014 | 10/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 10/01/2013 | 10/01/2014 | CHUBB | ||||||||
INSURANCE | 10/01/2010 | 10/01/2011 | CHUBB | ||||||||
INSURANCE | 10/01/2009 | 10/01/2010 | CHUBB | ||||||||
INSURANCE | 03/31/2008 | 03/30/2009 | CHUBB | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 11/30/2005 | 11/30/2005 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 08/29/2005 | 08/31/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/25/2005 | 08/31/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | BARNETT | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/04/2004 | 10/06/2004 | IN-COMPLIANCE | PINK | 2/0 | COMPLIANCE ASSURANCE | |||||
LTR | 10/04/2004 | 10/06/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 09/28/2004 | 09/30/2004 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TXI | 09/24/2004 | 09/30/2004 | IN-COMPLIANCE | FRAZIER | 3/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 03/03/2004 | 03/22/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/22/2003 | 12/29/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/19/2003 | 12/29/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/12/2003 | 12/17/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 2/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/12/2003 | 12/17/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 12/11/2003 | 03/22/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | PINK | 1/ | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALL 12000-GAL MODERN WELDING FIREGUARD DW AST | |||||||||||
RRBD | 01/17/2003 | 01/24/2003 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 09/16/2002 | 10/29/2002 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 09/10/2002 | 09/16/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/09/2002 | 09/16/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 2/0 | COMPLIANCE ASSURANCE | |||||
LTR | 01/17/2002 | 01/23/2002 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 01/17/2002 | 01/23/2002 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 01/10/2002 | 01/22/2002 | IN-COMPLIANCE | ROGGELIN | 2/0 | COMPLIANCE ASSURANCE | |||||
DSNR | 01/10/2002 | 01/22/2002 | ROGGELIN | 1/0 | DISCHARGE PROJECT | ||||||
TXI | 01/03/2002 | 01/22/2002 | IN-COMPLIANCE | ROGGELIN | 2/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/20/2001 | 08/26/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 08/03/2001 | 08/24/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HALSCOTT | 2/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/03/2001 | 08/26/2001 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 12/06/2000 | 12/31/2000 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/29/2000 | 11/30/2000 | MINOR OUT-OF-COMPLIANCE | HALSCOTT | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 08/31/2000 | 09/05/2000 | IN-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/23/2000 | 08/24/2000 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/09/2000 | 06/20/2000 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 10/15/2024 | Accepted | MUSLIC_A_1 | Enforcement | |||||||
Electronic Communication | 08/20/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Electronic Communication | 06/05/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Electronic Communication | 06/04/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Letter | 05/23/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Site Inspection | 05/22/2024 | Minor Out of Compliance | MUSLIC_A_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/06/2024 | Satisfied | MUSLIC_A_1 | Routine Compliance | |||||||
Record Document | 06/28/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Letter | 06/22/2022 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Site Inspection | 06/21/2022 | Minor Out of Compliance | SHOCK_E_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/20/2022 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Record Document | 01/17/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 01/17/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 01/17/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Letter | 01/17/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/17/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 11/12/2019 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 11/01/2019 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 11/01/2019 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/21/2019 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 05/31/2017 | In Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/31/2017 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Electronic Communication | 05/26/2017 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Electronic Communication | 05/29/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 05/28/2015 | In Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 06/24/2014 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 06/24/2014 | In Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/24/2014 | In Compliance | COLSON_NJ_1 | 1/0 | Closure | ||||||
Issue Document | 06/24/2014 | Satisfied | COLSON_NJ_1 | Closure | |||||||
Site Inspection | 05/20/2014 | In Compliance | ROGGELIN_EM_1 | 0/2 | Installation | ||||||
Site Inspection | 09/28/2011 | In Compliance | LONGEN_JL_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 08/17/2010 | In Compliance | LONGEN_JL_1 | 2/0 | Routine Compliance | ||||||
Enforcement Tracking | 08/04/2009 | Closed With Enforcement | JARRETT_SE | Enforcement | |||||||
Issue Document | 08/04/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 07/15/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 07/07/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/07/2009 | Major Out of Compliance | LONGEN_JL_1 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 06/10/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Meeting | 06/10/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 06/10/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 06/10/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 04/28/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 04/28/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Enforcement Referral | 04/03/2009 | Accepted | JARRETT_SE | Enforcement | |||||||
Letter | 12/16/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2008 | Major Out of Compliance | LONGEN_JL_1 | 2/0 | Non-Compliance | ||||||
Record Document | 11/18/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 11/18/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 11/18/2008 | Major Out of Compliance | LONGEN_JL_1 | 2/0 | Non-Compliance | ||||||
Site Inspection | 09/03/2008 | Major Out of Compliance | LONGEN_JL_1 | 2/0 | Routine Compliance | ||||||
Letter | 09/03/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 09/12/2007 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 08/24/2007 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 08/24/2007 | Major Out of Compliance | BARNETT_JX | 2/0 | Routine Compliance | ||||||
Letter | 12/04/2006 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 10/13/2006 | Minor Out of Compliance | BARNETT_JX | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/22/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Complete operability test of line leak detectors and submit test results to this office. | |||||||
No Discharges Found |