![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/04/2025 Last Data Refresh: 05/03/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9300723 | Latitude | 27° 49' 14.4547 | ||||||||
Name |
MEMORIAL PARK CEMETERY INC 5201 58TH AVE N |
Longitude | 82° 42' 1.0369 | ||||||||
SAINT PETERSBURG, FL 33709-2039 | LL Method | DPHO | |||||||||
Contact | Amber Lo | LL Status | REVIEWED | ||||||||
Phone | (727) 527-1196 | Status Date | 01/16/2007 | ||||||||
Account Owner Information | |||||||||||
Name | NORTHSTAR CEMETERY SERVICES OF FLORIDA, LLC 1900 ST. JAMES PLACE STE 300 Houston, TX 77056-4128 |
Effective Date | 11/04/2014 | ||||||||
Contact | Amber Lo | ||||||||||
Phone | (727) 527-1196 | ||||||||||
AMBER.LO@NSMG.COM | |||||||||||
Placard # / Date | 682628 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | Northstar Cemetery Services of Florida, LLC 1900 Saint James Pl Houston, TX 77056-4129 |
Effective Date | 06/12/2023 | ||||||||
Contact | Amber N Lo | ||||||||||
Phone | (727) 527-1196 | ||||||||||
Amber.Lo@NSMG.com | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 500 | Vehicular Diesel (D) | 06/01/1993 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (I) Suction piping system |
(F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 1000 | Unleaded Gas (B) | 06/01/1993 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | |||||||||||
INSURANCE | 04/28/2023 | 04/28/2024 | COLONY INSURANCE COMPANY | ||||||||
INSURANCE | 04/28/2022 | 04/28/2023 | COLONY INSURANCE COMPANY | ||||||||
INSURANCE | 04/28/2021 | 04/28/2022 | COLONY INSURANCE COMPANY | ||||||||
INSURANCE | 04/28/2020 | 04/28/2021 | COLONY INSURANCE COMPANY | ||||||||
INSURANCE | 11/07/2017 | 11/07/2018 | ACE AMER INS CO | ||||||||
INSURANCE | 11/07/2016 | 11/07/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 11/07/2015 | 11/07/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 11/07/2014 | 11/07/2015 | ACE | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 04/24/2025 | Closed With Enforcement | KELLEY_T | Enforcement | |||||||
Document Management | 04/24/2025 | Satisfied | KELLEY_T | Enforcement | |||||||
Letter | 04/29/2024 | Satisfied | KELLEY_T | Enforcement | |||||||
Enforcement Referral | 04/09/2024 | Accepted | PUHR_NM_1 | Enforcement | |||||||
Site Inspection | 12/22/2023 | Major Out of Compliance | PUHR_NM_1 | 1/0 | Routine Compliance | ||||||
Record Document | 11/08/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 09/17/2020 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 09/17/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 08/13/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 11/20/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Enforcement Tracking | 11/20/2018 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 11/19/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Letter | 11/16/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 11/16/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Enforcement Referral | 10/31/2018 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 10/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 07/31/2018 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 07/31/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Phone Conversation | 07/18/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 02/14/2017 | Satisfied | COLSON_NJ_1 | Installation | |||||||
Site Inspection | 02/14/2017 | In Compliance | COLSON_NJ_1 | 2/0 | Installation | ||||||
Site Inspection | 02/16/2016 | In Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Issue Document | 02/16/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Phone Conversation | 02/02/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 11/10/2014 | In Compliance | STRAUSS_RH_1 | 1/0 | Complaint | ||||||
Electronic Communication | 11/10/2014 | Satisfied | STRAUSS_RH_1 | Complaint | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/19/2023 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | *Test the Kreuger Level Gauge to ensure proper operation and submit passing results to this office for review.* An annual operability test shall be performed on the designated primary overfill protection device (Kreuger) used to meet the Department’s overfill protection requirement at intervals not exceeding 12 months to ensure proper operation. | |||||||
12/19/2023 | 7010 | SNC-A | 1.8 No financial responsibility instrument or expired instrument for > 180 days. | Submit documentation of Financial Responsibility from 04/28/2023 to current. Provide current documentation on FR Forms Part D and Part P. Note: Financial Responsibility forms (Part P and Part D) must be filled out and maintained for each period of coverage. | |||||||
12/19/2023 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | *Submit documentation showing consecutive months of visual inspections for the tank, spill buckets, piping, dispensing equipment, and tank interstice.* (Use the 12/15/2023 inspection as the first inspection log entry.) Note: At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually shall be visually inspected and documented as to its condition pursuant to Rule 62-762.711, F.A.C. | |||||||
No Discharges Found |