Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 01/22/2025 Last Data Refresh: 01/21/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Okaloosa | Status | OPEN | ||||||||
ID | 9400009 | Latitude | 30° 24' 9.342 | ||||||||
Name |
LEGENDARY MARINA AT MIDBAY 4601 LEGENDARY MARINA DR |
Longitude | 86° 25' 27.9947 | ||||||||
DESTIN, FL 32541 | LL Method | DPHO | |||||||||
Contact | JEREMY HOLCOMB | LL Status | REVIEWED | ||||||||
Phone | (850) 337-8200 | Status Date | 09/02/2009 | ||||||||
Account Owner Information | |||||||||||
Name | SUNTEX MARINA INVESTORS LLC 4603 LEGENDARY MARINA DR DESTIN, FL 32541 |
Effective Date | 12/16/2022 | ||||||||
Contact | MICHELLE GATLIN | ||||||||||
Phone | (850) 419-4718 | ||||||||||
MICHELLE.GATLIN@SUNTEX.COM | |||||||||||
Placard # / Date | 684619 - 06/06/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNTEX MARINA INVESTORS LLC 4603 LEGENDARY MARINA DR DESTIN, FL 32541 |
Effective Date | 12/16/2022 | ||||||||
Contact | MICHELLE GATLIN | ||||||||||
Phone | (850) 419-4718 | ||||||||||
MICHELLE.GATLIN@SUNTEX.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 20000 | Vehicular Diesel (D) | 05/01/2001 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (D) Unknown (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (J) Monitor piping/liner space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 5000 | Vehicular Diesel (D) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(Q) Visual inspection of ASTs (V) Suction pump check valve |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 550 | Waste Oil (L) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact (B) Steel/galvanized metal |
(Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 550 | New/Lube Oil (O) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact (B) Steel/galvanized metal |
(Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | New/Lube Oil (O) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact (B) Steel/galvanized metal |
(Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | New/Lube Oil (O) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (A) Abv, no soil contact (B) Steel/galvanized metal |
(Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Unleaded Gas (B) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/01/2024 | 04/01/2025 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2022 | 04/01/2023 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/16/2020 | 11/16/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 04/11/2018 | 04/11/2019 | CONTINENTAL CASUALTY INSURANCE COMPANY | ||||||||
INSURANCE | 11/16/2015 | 11/16/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 11/16/2013 | 11/16/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 11/16/2012 | 11/16/2013 | COMMERCIAL INSURANCE | ||||||||
INSURANCE | 11/16/2010 | 11/16/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2010 | 01/01/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/01/2008 | 01/01/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/02/2005 | 09/09/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes HURRICANE KATRINA DAMAGE ASSESSMENT INSPECTION. NO DAMAGE FROM RECENT STORMS WAS IDENTIFIED AT UST, PIPING OR DISPENSERS. SYSTEM IS FUNCTIONING NORMALLY. | |||||||||||
TCI | 07/20/2005 | 07/25/2005 | IN-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes HURRICANE DENNIS DAMAGE ASSESSMENT INSPECTION. NO APPARENT RELEASE AND SYSTEM IS OPERABLE. NO DAMAGE. | |||||||||||
TIN | 04/20/2005 | 05/05/2005 | IN-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes SPILL BUCKET INSTALLATION. CLOSURE ASSESSMENT DUE IN 60 DAYS. | |||||||||||
TXI | 04/20/2005 | 05/05/2005 | IN-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes FILL BUCKET REMOVAL. CONTRACTOR LAURITZ SPANN PCC045053. | |||||||||||
TCI | 04/06/2005 | 04/19/2005 | MINOR OUT-OF-COMPLIANCE | SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 09/28/2004 | 10/05/2004 | IN-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE IVAN INSPECTION. TANK AND PIPING SYSTEM SHOWED VERY LITTLE DAMAGE. PIPING NEEDS TO BE SECURED AND WESTERN MOST DISPENSER NEEDS PANELS REPLACED. NO DISCHARGE SYSTEM OPERATIONAL. | |||||||||||
RRBD | 06/14/2004 | 06/17/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 05/13/2004 | 05/17/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | J. SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
DPRI | 10/23/2003 | 10/28/2003 | IN-COMPLIANCE | JOHN B. HOLLINGSHEAD | 0/1 | TERMINAL FACILITY PROJECT | |||||
Completion Notes DPRC CERTIFICATE NUMBER 98772 | |||||||||||
TCI | 03/18/2003 | 03/25/2003 | IN-COMPLIANCE | SCOTT HALE | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 06/04/2002 | 06/13/2002 | IN-COMPLIANCE | V. PAUL HUTCHERSON | 0/1 | COMPLIANCE ASSURANCE | |||||
DPRI | 05/07/2002 | 05/23/2002 | IN-COMPLIANCE | JOHN B. HOLLINGSHEAD | 0/1 | TERMINAL FACILITY PROJECT | |||||
Completion Notes CERTIFICATE 98753 | |||||||||||
TIN | 06/14/2001 | 06/14/2001 | IN-COMPLIANCE | HOLLINGSHEAD_JB | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/03/2001 | 04/17/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/15/2000 | 11/20/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_JD | 0/5 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/18/2000 | 02/18/2000 | THAYER_JD | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/14/2000 | 02/01/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_JD | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/20/1999 | 12/20/1999 | THAYER_JD | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/16/1999 | 05/03/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_J | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 01/03/2025 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Letter | 12/17/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 12/16/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/1 | Routine Compliance | ||||||
Enforcement Tracking | 04/18/2023 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 03/08/2023 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 03/02/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 02/08/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 02/03/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Electronic Communication | 12/13/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 12/13/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 12/13/2022 | Major Out of Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Letter | 12/13/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 04/09/2021 | In Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/09/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 04/09/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 04/07/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 04/07/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 04/07/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Incident | 11/01/2019 | Has not led to Discharge | PANGAHAS_RL_1 | Incident | |||||||
TCAR | 10/31/2019 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Letter | 10/31/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 10/31/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 10/17/2019 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 10/04/2019 | Satisfied | WILSON_ML_1 | Installation | |||||||
Issue Document | 10/04/2019 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 10/03/2019 | In Compliance | PANGAHAS_RL_1 | 0/1 | Installation | ||||||
Document Management | 09/05/2019 | Satisfied | PANGAHAS_RL_1 | Incident | |||||||
Letter | 09/27/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 09/27/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 09/27/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 09/27/2018 | In Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/27/2018 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 03/04/2016 | In Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 03/01/2016 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 11/20/2014 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Electronic Communication | 11/20/2014 | Satisfied | MERRITT_S | Non-Compliance | |||||||
Electronic Communication | 11/20/2014 | Satisfied | MERRITT_S | Non-Compliance | |||||||
Electronic Communication | 11/20/2014 | Satisfied | MERRITT_S | Non-Compliance | |||||||
Electronic Communication | 11/14/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Enforcement Referral | 11/14/2014 | Accepted | MERRITT_S | Enforcement | |||||||
Electronic Communication | 11/14/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 05/19/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 05/16/2014 | Minor Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 05/22/2013 | In Compliance | KHAN_MR_1 | 0/1 | Non-Compliance | ||||||
Record Document | 05/17/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 12/10/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 12/07/2012 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 03/24/2011 | In Compliance | PORTER_AJ_1 | 0/1 | Routine Compliance | ||||||
Record Document | 10/21/2010 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Electronic Communication | 06/23/2010 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Phone Conversation | 06/23/2010 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Discharge Reporting | 06/16/2010 | Satisfied | THAYER_JD_1 | Discharge | |||||||
Document Management | 06/16/2010 | Complete | THAYER_JD_1 | Discharge | |||||||
Phone Conversation | 06/14/2010 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Record Document | 06/07/2010 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 05/10/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 05/06/2010 | Minor Out of Compliance | THAYER_JD_1 | 0/1 | Routine Compliance | ||||||
Record Document | 02/02/2009 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Letter | 01/07/2009 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Record Document | 01/07/2009 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Site Inspection | 12/30/2008 | Minor Out of Compliance | THAYER_JD_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 02/29/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 02/29/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 02/15/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 02/14/2008 | Major Out of Compliance | KHAN_MR_1 | 0/1 | Routine Compliance | ||||||
Record Document | 11/30/2006 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Site Inspection | 10/18/2006 | Minor Out of Compliance | THAYER_JD_1 | 6/1 | Routine Compliance | ||||||
Proof of Contamination | 10/10/2006 | Satisfied | THAYER_JD_1 | Discharge | |||||||
TCAR | 10/10/2006 | Rejected | THAYER_JD_1 | Closure | |||||||
Record Document | 09/06/2006 | Satisfied | THAYER_JD_1 | Closure | |||||||
TCAR | 09/06/2006 | Incomplete | THAYER_JD_1 | Closure | |||||||
Record Document | 08/14/2006 | Satisfied | THAYER_JD_1 | Closure | |||||||
TCAR | 08/07/2006 | Rejected | THAYER_JD_1 | Closure | |||||||
Site Inspection | 07/21/2006 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 06/01/2006 | In Compliance | TISSINGTON_AB_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 05/23/2006 | In Compliance | TISSINGTON_AB_1 | 0/1 | Installation | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/16/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Have a certified technician test the Ball Floats for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove the liquid from the secondary and re-install or replace the interstitial gauge as necessary. The integrity of the premium spill bucket must be tested before it brought back into service. If the spill bucket needs to be replaced, contact the inspector prior to work beginning. Please provide a copy of testing results and detailed work invoice of work completed to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified technician test the spill containment gauges for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Have the liquid removed and properly disposed of from the diesel STP sump. Email a copy of the work invoice to the inspector for review and pictures. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified technician test the integrity of the STP Sumps. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified technician test the integrity of the Double Wall Spill Containments. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov. | |||||||
12/16/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified technician test the ATG System for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified technician test the integrity of the dispenser sumps. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
12/16/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified technician test the Line Leak Detectors for proper operation. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/06/2006 | COMPLETED | 26 | |||||||||