DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Clay   Status    OPEN
 
ID 9401016   Latitude    30° 7' 24.8211
 
Name EXXON SHOP
1313 BLANDING BLVD
Longitude    81° 47' 50.4329
  ORANGE PARK, FL 32073 LL Method    DGPS
 
Contact MUHAMMAD OWAIS   LL Status    REVIEWED
 
Phone (646) 763-5818   Status Date    11/10/2003
 
Account Owner Information
 
Name FAREED INC
3991 BLANDING BLVD
ORANGE PARK, FL 32065
Effective Date    09/01/2023
 
Contact MUHAMMAD OWAIS
 
Phone (646) 763-5818
 
Email FAREEDINC1313@GMAIL.COM
  Placard # / Date   
Property Owner Information
 
Name AMBI INC OF JACKSONVILLE
1313 BLANDING BLVD
ORANGE PARK, FL 32065
Effective Date    09/07/2007
 
Contact CHETAN PATEL
 
Phone (904) 994-4712
 
Email PATELCHETAN4712@GMAIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 12000 Unleaded Gas (B) 03/01/1994 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 16000 Unleaded Gas (B) 03/01/1994 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   09/06/2022 09/06/2024 ACE AMERICAN INSURANCE COMPANY
INSURANCE   09/06/2020 09/06/2022 ACE AMERICAN INSURANCE COMPANY
INSURANCE   09/06/2018 09/06/2020 ACE AMERICAN INSURANCE COMPANY
INSURANCE   09/10/2016 09/10/2017 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/01/2015 09/01/2016 COMMERCE & INDUSTRY
INSURANCE   09/01/2014 09/01/2015 COMMERCE & INDUSTRY
INSURANCE   09/10/2013 09/10/2014 COMMERCE & INDUSTRY
INSURANCE   09/10/2011 09/10/2012 COMMERCE & INDUSTRY
INSURANCE   09/10/2010 09/10/2011 ZURICH-AMERICAN
INSURANCE   09/10/2008 09/10/2009 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 07/08/2005 09/09/2005 COMPLIANCE ASSURANCE
 
TCI 05/26/2005 06/08/2005 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
TCI 05/07/2004 06/09/2004 IN-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes LD TEST 5/5/04 2/2 PASS ANNUAL OPERABILITY 5/5/04 PASS
 
RRBD 06/03/2003 06/11/2003 COMPLIANCE ASSURANCE
 
TCI 04/29/2003 05/20/2003 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
TCI 05/28/2002 06/04/2002 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes LD TEST 4/23/03
 
TCI 04/26/2001 05/02/2001 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
RRBD 03/21/2000 03/21/2000 BARNETT-P 0/0 COMPLIANCE ASSURANCE
 
TCI 02/15/2000 02/21/2000 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
RRBD 03/26/1999 04/23/1999 BARNETT_P 0/0 COMPLIANCE ASSURANCE
 
TCI 03/19/1999 03/24/1999 MINOR OUT-OF-COMPLIANCE BARNETT_P 0/2 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 02/21/2025 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 02/11/2025 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 02/11/2025 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 02/11/2025 Major Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Letter 02/11/2025 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 01/25/2024 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 01/25/2024 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 01/25/2024 In Compliance HARRINGTON_RD_1 0/2 Compliance Assistance
 
Site Inspection 09/01/2022 In Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Electronic Communication 09/01/2022 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 09/01/2022 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 09/01/2022 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Letter 08/24/2020 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Electronic Communication 08/24/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 08/24/2020 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 08/14/2020 In Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Record Document 06/14/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 06/14/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 06/07/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 06/25/2018 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Letter 06/25/2018 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 06/10/2018 Major Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Enforcement Tracking 09/29/2016 Closed Without Enforcement HILL_K Enforcement
 
Letter 09/29/2016 Satisfied HILL_K Closure
 
TCAR 09/29/2016 Satisfied HILL_K Closure
 
Letter 08/08/2016 Satisfied HILL_K Enforcement
 
Enforcement Referral 05/09/2016 Accepted HILL_K Enforcement
 
Issue Document 05/09/2016 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Electronic Communication 03/23/2016 Satisfied HARRINGTON_RD_1 Installation
 
Site Inspection 03/23/2016 Minor Out of Compliance HARRINGTON_RD_1 0/2 Installation
 
Letter 03/04/2016 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 03/04/2016 Minor Out of Compliance HARRINGTON_RD_1 0/2 Non-Compliance
 
Electronic Communication 02/29/2016 Satisfied HARRINGTON_RD_1 Closure
 
Site Inspection 02/29/2016 Minor Out of Compliance HARRINGTON_RD_1 0/2 Closure
 
Letter 10/28/2015 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 10/28/2015 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Issue Document 10/28/2015 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Issue Document 01/15/2014 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 12/10/2013 In Compliance HARRINGTON_RD_1 0/2 Non-Compliance
 
Site Inspection 09/18/2013 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Letter 09/18/2013 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Issue Document 08/23/2013 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 03/01/2012 In Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Record Document 05/27/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 02/07/2011 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Site Inspection 12/10/2010 Minor Out of Compliance HARRINGTON_RD_1 0/2 Routine Compliance
 
Letter 12/10/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Record Document 04/30/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Letter 04/30/2009 Satisfied BARNETT_PC_1 Non-Compliance
 
Emergency Preparedness Information 04/30/2009 Satisfied BARNETT_PC_1 Routine Compliance
 
Site Inspection 04/30/2009 Minor Out of Compliance BARNETT_PC_1 0/2 Routine Compliance
 
Letter 03/06/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Record Document 03/06/2008 Satisfied BARNETT_PC_1 Non-Compliance
 
Site Inspection 03/05/2008 Major Out of Compliance BARNETT_PC_1 0/2 Routine Compliance
 
Site Inspection 04/13/2007 In Compliance BARNETT_PC_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/13/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Emergency Preparedness Information 09/21/2006 Satisfied BARNETT_PC_1 Routine Compliance
 
Site Inspection 05/11/2006 In Compliance BARNETT_PC_1 0/2 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
02/11/2025 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Please provide current spill bucket Integrity Tests.
 
02/11/2025 6066 Minor 4.4 Not repaired per applicable standards. Repair or replace the damaged entry boot in the 87 stp sump. Provide verification and post-repair hydro test of the sump.
 
02/11/2025 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Check the tank interstice status. Provide verification of findings.
 
02/11/2025 6053 Minor 4.7 Primary overfill protection not provided, registered, or tested as required. Please provide current overfill prevention device tests.
 
02/11/2025 6062 Minor 2.5 Release detection devices not tested annually. Please provide current line leak detector test result documentation.
 
02/11/2025 6011 SNC-B 2.8 No financial responsibility instrument or expired instrument for < 180 days. Please provide current Storage Tank Financial Responsibility policy and facility-completed CFR Form. The CFR Form has been sent to the facility for completion.
 
 
 
No Discharges Found