![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 9401016 | Latitude | 30° 7' 24.8211 | ||||||||
Name |
EXXON SHOP 1313 BLANDING BLVD |
Longitude | 81° 47' 50.4329 | ||||||||
ORANGE PARK, FL 32073 | LL Method | DGPS | |||||||||
Contact | MUHAMMAD OWAIS | LL Status | REVIEWED | ||||||||
Phone | (646) 763-5818 | Status Date | 11/10/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FAREED INC 3991 BLANDING BLVD ORANGE PARK, FL 32065 |
Effective Date | 09/01/2023 | ||||||||
Contact | MUHAMMAD OWAIS | ||||||||||
Phone | (646) 763-5818 | ||||||||||
FAREEDINC1313@GMAIL.COM | |||||||||||
Placard # / Date | |||||||||||
Property Owner Information | |||||||||||
Name | AMBI INC OF JACKSONVILLE 1313 BLANDING BLVD ORANGE PARK, FL 32065 |
Effective Date | 09/07/2007 | ||||||||
Contact | CHETAN PATEL | ||||||||||
Phone | (904) 994-4712 | ||||||||||
PATELCHETAN4712@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 03/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 16000 | Unleaded Gas (B) | 03/01/1994 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/06/2022 | 09/06/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/06/2020 | 09/06/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/06/2018 | 09/06/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/10/2016 | 09/10/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2015 | 09/01/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2014 | 09/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/10/2013 | 09/10/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/10/2011 | 09/10/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/10/2010 | 09/10/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/10/2008 | 09/10/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 07/08/2005 | 09/09/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 05/26/2005 | 06/08/2005 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/07/2004 | 06/09/2004 | IN-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 5/5/04 2/2 PASS ANNUAL OPERABILITY 5/5/04 PASS | |||||||||||
RRBD | 06/03/2003 | 06/11/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/29/2003 | 05/20/2003 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/28/2002 | 06/04/2002 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 4/23/03 | |||||||||||
TCI | 04/26/2001 | 05/02/2001 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/21/2000 | 03/21/2000 | BARNETT-P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/15/2000 | 02/21/2000 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/26/1999 | 04/23/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/19/1999 | 03/24/1999 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 02/21/2025 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2025 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 02/11/2025 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/11/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 01/25/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 01/25/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 01/25/2024 | In Compliance | HARRINGTON_RD_1 | 0/2 | Compliance Assistance | ||||||
Site Inspection | 09/01/2022 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 09/01/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 09/01/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 09/01/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 08/24/2020 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 08/24/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 08/24/2020 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 08/14/2020 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 06/14/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 06/14/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/07/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/25/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 06/25/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 06/10/2018 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 09/29/2016 | Closed Without Enforcement | HILL_K | Enforcement | |||||||
Letter | 09/29/2016 | Satisfied | HILL_K | Closure | |||||||
TCAR | 09/29/2016 | Satisfied | HILL_K | Closure | |||||||
Letter | 08/08/2016 | Satisfied | HILL_K | Enforcement | |||||||
Enforcement Referral | 05/09/2016 | Accepted | HILL_K | Enforcement | |||||||
Issue Document | 05/09/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Electronic Communication | 03/23/2016 | Satisfied | HARRINGTON_RD_1 | Installation | |||||||
Site Inspection | 03/23/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Installation | ||||||
Letter | 03/04/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 03/04/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 02/29/2016 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Site Inspection | 02/29/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Closure | ||||||
Letter | 10/28/2015 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 10/28/2015 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 10/28/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Issue Document | 01/15/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 12/10/2013 | In Compliance | HARRINGTON_RD_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 09/18/2013 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/18/2013 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Issue Document | 08/23/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/01/2012 | In Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 05/27/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 02/07/2011 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 12/10/2010 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/10/2010 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Record Document | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/30/2009 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Site Inspection | 04/30/2009 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/06/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Record Document | 03/06/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 03/05/2008 | Major Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/13/2007 | In Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Site Inspection | 05/11/2006 | In Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/11/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please provide current spill bucket Integrity Tests. | |||||||
02/11/2025 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Repair or replace the damaged entry boot in the 87 stp sump. Provide verification and post-repair hydro test of the sump. | |||||||
02/11/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Check the tank interstice status. Provide verification of findings. | |||||||
02/11/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Please provide current overfill prevention device tests. | |||||||
02/11/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Please provide current line leak detector test result documentation. | |||||||
02/11/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Please provide current Storage Tank Financial Responsibility policy and facility-completed CFR Form. The CFR Form has been sent to the facility for completion. | |||||||
No Discharges Found |