![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 9502425 | Latitude | 26° 12' 38.8151 | ||||||||
Name |
CIRCLE K #2723919 1000 WHIPPORWILL LN |
Longitude | 81° 44' 35.5929 | ||||||||
NAPLES, FL 34105 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 04/23/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 01/08/2016 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697961 - 06/29/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | LONG PETROLEUM PROUCTS LLC PO BOX 856 NAPLES, FL 34106 |
Effective Date | 06/04/2001 | ||||||||
Contact | RANDY LONG | ||||||||||
Phone | (941) 262-4124 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Vehicular Diesel (D) | 07/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/25/2021 | 08/28/2024 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2013 | 11/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2011 | 11/01/2012 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2008 | 11/01/2009 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 06/14/2005 | 06/14/2005 | IN-COMPLIANCE | LUCAS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS. | |||||||||||
RRBD | 05/18/2004 | 05/18/2004 | IN-COMPLIANCE | LUCAS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes RRBD ON SUMP INSPECTION & INTERSTITAL VACUUM READINGS. CLOSE VIOLATION #86. | |||||||||||
CWOE | 05/18/2004 | 05/18/2004 | LUCAS | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ISSUE CWOE. | |||||||||||
RRBD | 05/03/2004 | 05/04/2004 | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SUMP SENSORS PASSED ANNUAL OPERABILITY | |||||||||||
TCI | 04/30/2004 | 05/03/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | LUCAS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: DW FIBERGLASS | |||||||||||
TCR | 04/24/2003 | 04/24/2003 | IN-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PCW WAS REMOVED FROM THE SUMPS. SHEAR VALVES ARE ANCHORED. SUMP SENSORS PASS OPERABILITY. VACUUM READING IS BEING RECORDED. FACILITY IS CWOE | |||||||||||
CWOE | 04/24/2003 | 04/24/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/07/2003 | 04/21/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TCI DATED 4/7/03 | |||||||||||
TCI | 04/07/2003 | 04/07/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VEEDER-ROOT SUMPS SENSORS NEED ANNUAL TEST. INTERTSITIAL VACUUM IS NOT BEING CHECKED MONTHLY. RESET SENSOR HEIGHT IN RUL SUMP. SENSORS SHOULD BE BELOW PIPING ENTRANCE. REMOVE PCW FROM RUL PIPING SUMP AND DISPENSER #2. RE-ANCHOR SHEAR VALVES. FILTERS. | |||||||||||
TCI | 01/18/2002 | 01/18/2002 | IN-COMPLIANCE | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes 0 VIOLATIONS | |||||||||||
TCR | 05/15/2001 | 05/16/2001 | IN-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VERIFIED BALL CHECK. ANNUAL TEST ON LLD'S AND SUMP SENSORS | |||||||||||
RRBD | 03/30/2001 | 03/30/2001 | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FAX OF INSURANCE | |||||||||||
TCI | 03/29/2001 | 03/30/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HOGAN_S | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VERIFY OVERFILL PROTECTION, RD DEVICES NEED TESTED, INSURANCE WILL BE FAXED | |||||||||||
TCI | 04/13/2000 | 04/24/2000 | IN-COMPLIANCE | SILLERY_W | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 06/07/1999 | 06/07/1999 | IN-COMPLIANCE | LAWSON_D | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/29/2024 | Accepted | STANDIFORD_JA | Enforcement | |||||||
Letter | 09/06/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||||||
Site Inspection | 08/31/2023 | Major Out of Compliance | STANDIFORD_JA | 0/3 | Routine Compliance | ||||||
Electronic Communication | 08/31/2023 | Satisfied | STANDIFORD_JA | Routine Compliance | |||||||
Incident | 03/23/2022 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/23/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/23/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Letter | 01/13/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 01/13/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 12/20/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Document Management | 12/17/2021 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 11/24/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 11/24/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Site Inspection | 11/01/2021 | Minor Out of Compliance | HERNANDEZ_N_5 | 0/3 | Routine Compliance | ||||||
Letter | 11/01/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 10/21/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||||||
Incident | 01/24/2020 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Letter | 01/24/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Incident | 12/26/2019 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Document Management | 11/27/2019 | Satisfied | BATES_TD_1 | Incident | |||||||
Letter | 11/18/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Site Inspection | 11/18/2019 | Minor Out of Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 11/15/2019 | Satisfied | BATES_TD_1 | Routine Compliance | |||||||
Document Management | 09/28/2019 | Satisfied | SNYDERBURN_PJ_2 | Incident | |||||||
Record Document | 01/02/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Letter | 09/29/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Site Inspection | 08/29/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/18/2015 | In Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/31/2014 | In Compliance | SPARKS_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/26/2012 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Emergency Preparedness Information | 08/25/2012 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Site Inspection | 03/26/2012 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||||||
Letter | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
TCAR | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Document Management | 03/19/2012 | Complete | SNYDERBURN_PJ_2 | Closure | |||||||
Document Management | 03/19/2012 | Complete | SNYDERBURN_PJ_2 | Discharge | |||||||
Record Document | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Incident | 03/19/2012 | Led to Discharge (Incident promoted) | SNYDERBURN_PJ_2 | Incident | |||||||
Discharge Reporting | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Letter | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Document Management | 03/19/2012 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
Record Document | 12/21/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Letter | 12/14/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 12/14/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 07/07/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/07/2010 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/01/2009 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 05/01/2009 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/30/2009 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Emergency Preparedness Information | 04/25/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 04/25/2008 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Record Document | 06/07/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 05/07/2007 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Letter | 05/07/2007 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | OWEN_JA | Routine Compliance | |||||||
Site Inspection | 03/07/2006 | In Compliance | OWEN_JA | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/29/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Within 90 days of the inspection date: Please either remove both shrader valves or loosen/pull back the piping test boots allowing the piping interstices to communicate with the PUL and RUL STP sump sensors. Remove water from the DSL DWSB interstice, and ensure the DWSB interstitial dip stick cap is firmly tightened in place. Provide associated photos via email documenting corrective actions have been performed to the inspector within the same time frame. Please see STP sump photos for reference. | |||||||
08/29/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Within 90 days of the inspection date, please email photos and waste manifests (from a petroleum contactor) to the inspector documenting all water has been removed and properly disposed of from both PUL and RUL STP sumps. Additionally, please investigate the status of the PUL sump sensor and replace as needed. Please email a completed work order within the same time frame documenting if the sensor was repaired or replaced. | |||||||
08/29/2023 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | Within 90 days of the inspection date, please provide a photo documenting the shear valve anchor bolt has been tightened via email to the inspector. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/28/2012 | COMPLETED | 26 | |||||||||