![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 9502948 | Latitude | 26° 12' 39.123 | ||||||||
Name |
SUNSHINE #801 5098 AIRPORT PULLING RD N |
Longitude | 81° 46' 1.7966 | ||||||||
NAPLES, FL 34105-2428 | LL Method | DPHO | |||||||||
Contact | KEVIN HASAN | LL Status | REVIEWED | ||||||||
Phone | (239) 261-8067 | Status Date | 04/23/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 02/19/2016 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Placard # / Date | 694692 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 06/21/2017 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 09/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 09/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/25/2021 | 09/25/2024 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2020 | 09/25/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2019 | 09/25/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2018 | 09/25/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2017 | 09/25/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NATIONAL INSURANCE CO | ||||||||
INSURANCE | 06/20/2015 | 06/20/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/20/2014 | 06/20/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/20/2013 | 06/20/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/20/2011 | 06/20/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/20/2010 | 06/20/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/20/2008 | 06/20/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/08/1995 | 12/08/1997 | PLUS | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/19/2006 | 01/27/2006 | MINOR OUT-OF-COMPLIANCE | OWEN_J | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes MLLDS AND SENSORS NEED ANNUAL TESTING. THE SPILL BUCKETS APPEAR DAMANGED AND NEED HYDROS. | |||||||||||
TCI | 01/18/2005 | 01/24/2005 | IN-COMPLIANCE | KOLANDA | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS | |||||||||||
NCLI | 04/23/2004 | 04/26/2004 | KOLANDA | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NEEDS ANNUAL OPERABILITY TESTS FOR INTERSTITIAL SENSORS & MLLD | |||||||||||
TCI | 04/22/2004 | 04/22/2004 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: DW BLACK PRIMARY -- YELLOW SECONDARY | |||||||||||
TCPI | 12/05/2003 | 12/11/2003 | IN-COMPLIANCE | LUCAS | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLAINT OF WATER IN TANK - NO WATER FOUND | |||||||||||
TCR | 05/05/2003 | 05/05/2003 | IN-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PRODUCT WAS PREMOVED FROM DISPENSER LINER #5. LLD PASSED OPERABILITY. DISPENSER HOSE ON #9 WAS REPLACED. | |||||||||||
CWOE | 05/05/2003 | 05/05/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 03/20/2003 | 03/26/2003 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI FOR TCI DATED 3/20/03 | |||||||||||
TCI | 03/20/2003 | 03/20/2003 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LLD NEED ANNUAL TEST. REMOVE FUEL FROM DISPENSER LINER #5. REPLACE DISPENSER HOSE. DISPENSER #1 IS BEING REPLACED BY ST&P, DAMAGED BY A VEHICLE. NO RELEASE TO ENVIRONMENT. | |||||||||||
TCI | 03/15/2002 | 03/21/2002 | IN-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
CWOE | 06/04/2001 | 06/04/2001 | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSE 92/N 92/N 157/N 157/N | |||||||||||
TCR | 06/04/2001 | 06/04/2001 | IN-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes MONITORING WELLS PROPERLY ABANDONED AND LLDS TESTED. | |||||||||||
TCR | 05/14/2001 | 05/14/2001 | MINOR OUT-OF-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes OVERFILL IS INSTALLED, LLDS TESTED. NEEDS TO CLOSE WELLS AND TEST TANK INTERSTICE SENSORS | |||||||||||
TCI | 04/13/2001 | 04/16/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HOGAN_S | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSE WELLS, VERIFY OR INSTALL OVERFILL, RD DEVICES ANNUAL TEST | |||||||||||
TCI | 03/21/2000 | 03/23/2000 | IN-COMPLIANCE | SILLERY_W | 0/2 | COMPLIANCE ASSURANCE | |||||
CWOE | 08/17/1999 | 08/17/1999 | LAWSON_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 08/17/1999 | 08/17/1999 | LAWSON_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 07/21/1999 | 08/02/1999 | MINOR OUT-OF-COMPLIANCE | LAWSON_D | 0/2 | COMPLIANCE ASSURANCE | |||||
WLI | 06/18/1999 | 08/17/1999 | LAWSON_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/23/1999 | 08/17/1999 | LAWSON_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/12/1999 | 04/22/1999 | MINOR OUT-OF-COMPLIANCE | LAWSON_D | 0/2 | COMPLIANCE ASSURANCE | |||||
UTCI | 06/18/1998 | 06/24/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Completion Notes ROUTINE | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/12/2024 | Accepted | STANDIFORD_JA | Enforcement | |||||||
Record Document | 02/29/2024 | Satisfied | STANDIFORD_JA | Routine Compliance | |||||||
Letter | 12/06/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||||||
Site Inspection | 11/29/2023 | Major Out of Compliance | STANDIFORD_JA | 0/2 | Routine Compliance | ||||||
Letter | 11/10/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 11/10/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 11/08/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 11/08/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 10/14/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 10/12/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 09/27/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 09/14/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Letter | 09/10/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Site Inspection | 09/10/2021 | Major Out of Compliance | HERNANDEZ_N_5 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 09/02/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||||||
Incident | 06/18/2020 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 06/18/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Letter | 06/18/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/09/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/06/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Letter | 09/30/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Site Inspection | 09/30/2019 | Major Out of Compliance | BATES_TD_1 | 0/2 | Routine Compliance | ||||||
Document Management | 09/26/2019 | Satisfied | BATES_TD_1 | Incident | |||||||
Electronic Communication | 09/26/2019 | Satisfied | BATES_TD_1 | Routine Compliance | |||||||
Enforcement Tracking | 04/01/2019 | Closed Without Enforcement | HERNANDEZ_N | Enforcement | |||||||
Issue Document | 04/01/2019 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Electronic Communication | 03/29/2019 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Site Inspection | 03/29/2019 | In Compliance | HERNANDEZ_N | 0/2 | Enforcement | ||||||
Electronic Communication | 10/18/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Electronic Communication | 04/13/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Phone Conversation | 04/13/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Enforcement Referral | 04/13/2018 | Accepted | STANDIFORD_JA_2 | Enforcement | |||||||
Electronic Communication | 04/13/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Phone Conversation | 04/13/2018 | Satisfied | HERNANDEZ_N | Enforcement | |||||||
Record Document | 02/09/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Record Document | 02/08/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Letter | 12/04/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Site Inspection | 11/30/2017 | Major Out of Compliance | STANDIFORD_JA_2 | 0/2 | Routine Compliance | ||||||
Document Management | 01/30/2017 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
TCAR | 01/30/2017 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Letter | 01/30/2017 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Incident | 01/30/2017 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Site Inspection | 01/30/2017 | In Compliance | SNYDERBURN_PJ_2 | 0/2 | Closure | ||||||
Document Management | 01/30/2017 | Satisfied | SNYDERBURN_PJ_2 | Incident | |||||||
Site Inspection | 01/30/2017 | In Compliance | SNYDERBURN_PJ_2 | 0/2 | Installation | ||||||
Site Inspection | 12/08/2015 | In Compliance | STANDIFORD_JA_2 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/20/2014 | In Compliance | SPARKS_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/22/2013 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 07/22/2013 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Letter | 06/28/2013 | Satisfied | SPARKS_JD_1 | Non-Compliance | |||||||
Site Inspection | 06/28/2013 | Minor Out of Compliance | SPARKS_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/25/2012 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Site Inspection | 12/07/2011 | In Compliance | SNYDERBURN_PJ_2 | 0/2 | Non-Compliance | ||||||
Record Document | 10/18/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 10/10/2011 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/2 | Routine Compliance | ||||||
Letter | 10/10/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Letter | 01/17/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 01/16/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/2 | Routine Compliance | ||||||
Record Document | 09/03/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Document Management | 03/08/2010 | Complete | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 01/22/2010 | Minor Out of Compliance | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 11/19/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Letter | 11/18/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 11/18/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 11/18/2009 | Major Out of Compliance | NOVAK_KM_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 12/19/2008 | In Compliance | NOVAK_KM_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 10/29/2008 | Minor Out of Compliance | WILSON_KM | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/29/2008 | Satisfied | WILSON_KM | Routine Compliance | |||||||
Letter | 10/29/2008 | Satisfied | WILSON_KM | Non-Compliance | |||||||
TCAR | 07/08/2008 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Site Inspection | 07/08/2008 | In Compliance | POTTS_CR | 0/2 | Non-Compliance | ||||||
Record Document | 02/25/2008 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Phone Conversation | 12/11/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Record Document | 11/13/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Letter | 10/26/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Phone Conversation | 10/22/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Site Inspection | 09/19/2007 | Major Out of Compliance | POTTS_CR | 0/2 | Routine Compliance | ||||||
Letter | 09/19/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Emergency Preparedness Information | 09/10/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/29/2023 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Perform integrity testing and provide the associated test record to the Inspector within 90 days of the inspection date. Ensure integrity testing is performed every 3 years (on or before 3 year date) as required by rule. | |||||||
11/29/2023 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Within 90 days of the inspection date: Please perform an integrity test and provide the completed test record via email to the Inspector. If the integrity test fails, submit an INF. The Incident will then be investigated to determine if a discharge occurred. If a discharge occurred, please submit a DRF and then initiate a site assessment to include sampling. | |||||||
No Discharges Found |