Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Federal Government | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 9600413 | Latitude | 30° 23' 14.3442 | ||||||||
Name |
U.S.C.G SECTOR JACKSONVILLE ANNEX 4200 OCEAN ST |
Longitude | 81° 26' 5.6468 | ||||||||
ATLANTIC BEACH, FL 32233-2416 | LL Method | DPHO | |||||||||
Contact | AHMED PEREZ | LL Status | REVIEWED | ||||||||
Phone | (904) 564-7562 | Status Date | 10/06/2003 | ||||||||
Account Owner Information | |||||||||||
Name | US COAST GUARD 4200 OCEAN ST ATLANTIC BEACH, FL 32233 |
Effective Date | 03/05/1996 | ||||||||
Contact | PAUL JEFFERYS | ||||||||||
Phone | (904) 564-7550 | ||||||||||
Placard # / Date | |||||||||||
Property Owner Information | |||||||||||
Name | US COAST GUARD 4200 OCEAN ST ATLANTIC BEACH, FL 32233 |
Effective Date | 12/10/2003 | ||||||||
Contact | PAUL JEFFERYS | ||||||||||
Phone | (904) 564-7550 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Vehicular Diesel (D) | 08/01/1996 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 4000 | Unleaded Gas (B) | 11/01/2003 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Unleaded Gas (B) | 08/01/1996 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Vehicular Diesel (D) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 3000 | Vehicular Diesel (D) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Unleaded Gas (B) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 10/31/2024 | ||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 03/05/1996 | 12/31/2030 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/16/2006 | 02/21/2006 | IN-COMPLIANCE | PARISH | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/08/2005 | 06/10/2005 | IN-COMPLIANCE | YATES | 2/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/26/2004 | 07/27/2004 | IN-COMPLIANCE | BORISADE_C | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 05/27/2004 | 05/27/2004 | MINOR OUT-OF-COMPLIANCE | BORISADE_C | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL TEST OF LEAK DETECTION DEVICES. | |||||||||||
DPRI | 05/27/2004 | 05/27/2004 | IN-COMPLIANCE | BORISADE_C | 2/0 | TERMINAL FACILITY PROJECT | |||||
LTR | 11/16/2003 | 11/16/2003 | GRIFFIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO TCAR REQUIRED FOR THIS TANK. 1K GASOLINE #5 REMOVED. | |||||||||||
TIN | 11/13/2003 | 11/17/2003 | IN-COMPLIANCE | CARROLL_A | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK #5 | |||||||||||
TXI | 10/30/2003 | 11/16/2003 | IN-COMPLIANCE | CARROLL_A | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANK 5 REMOVED. REPLACED BY #7. | |||||||||||
DPRI | 04/16/2003 | 04/22/2003 | IN-COMPLIANCE | GRIFFIN_T | 2/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 08/15/2002 | 09/10/2002 | IN-COMPLIANCE | BORISADE_C | 1/0 | COMPLIANCE ASSURANCE | |||||
DPRI | 05/07/2002 | 05/09/2002 | IN-COMPLIANCE | GRIFFIN_T | 2/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 09/05/2001 | 09/06/2001 | IN-COMPLIANCE | TOWNSEND_C | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 04/10/2001 | 04/17/2001 | IN-COMPLIANCE | MACK_W | 2/0 | COMPLIANCE ASSURANCE | |||||
DPRI | 03/13/2001 | 03/15/2001 | IN-COMPLIANCE | DEFALCO_L | 0/0 | TERMINAL FACILITY PROJECT | |||||
Completion Notes DPRC ISSUED | |||||||||||
NCLI | 03/01/2001 | 03/01/2001 | CUMMINGS_C | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/27/2001 | 02/28/2001 | MINOR OUT-OF-COMPLIANCE | MACK_B | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PLACARD/UNMARKED FILL/NO ANNUAL RD TEST | |||||||||||
TCI | 02/18/2000 | 02/18/2000 | IN-COMPLIANCE | CUMMINGS_C | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/02/1999 | 07/13/1999 | IN-COMPLIANCE | TORSANKO_G | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/22/2025 | Satisfied | MCNEIL_A | Compliance Assistance | |||||||
Enforcement Tracking | 04/04/2025 | Closed Without Enforcement | MCNEIL_A | Enforcement | |||||||
Letter | 01/29/2025 | Satisfied | MCNEIL_A | Enforcement | |||||||
Phone Conversation | 01/29/2025 | Satisfied | MCNEIL_A | Enforcement | |||||||
Enforcement Referral | 12/18/2024 | Accepted | AMES_J | Enforcement | |||||||
Electronic Communication | 12/13/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 12/05/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 11/15/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/18/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/08/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/16/2024 | Major Out of Compliance | WESTERMAN_ML_1 | 2/0 | Routine Compliance | ||||||
Incident | 09/16/2024 | Has not led to Discharge | WESTERMAN_ML_1 | Incident | |||||||
Document Management | 09/16/2024 | Satisfied | WESTERMAN_ML_1 | Incident | |||||||
Electronic Communication | 08/27/2024 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Enforcement Tracking | 03/05/2024 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Letter | 03/05/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Letter | 05/19/2023 | Satisfied | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 01/12/2021 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Electronic Communication | 01/12/2021 | Satisfied | MACK_B_1 | Routine Compliance | |||||||
Electronic Communication | 01/12/2021 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Electronic Communication | 01/12/2021 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Enforcement Referral | 01/08/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 11/09/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Letter | 10/20/2020 | Satisfied | MACK_B_1 | Compliance Assistance | |||||||
Site Inspection | 10/19/2020 | Major Out of Compliance | MACK_B_1 | 2/0 | Routine Compliance | ||||||
Incident | 09/25/2020 | Has not led to Discharge | MACK_B_1 | Incident | |||||||
Electronic Communication | 10/31/2017 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Issue Document | 10/31/2017 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Letter | 08/31/2017 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Site Inspection | 08/30/2017 | Minor Out of Compliance | LUNN_RJ_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 01/29/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 01/29/2015 | In Compliance | LUNN_RJ_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 12/26/2012 | In Compliance | KOROUS_E_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 12/26/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 05/16/2011 | In Compliance | CAIN_M_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/18/2010 | In Compliance | SPEARS_CV_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 03/31/2009 | In Compliance | PARISH_KM_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/30/2008 | In Compliance | PARISH_KM_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/19/2007 | In Compliance | PARISH_KM_1 | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/01/1996 | COMPLETED | ||||||||||