![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/10/2025 Last Data Refresh: 05/09/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Federal Government | ||||||||
County | Okaloosa | Status | OPEN | ||||||||
ID | 9601489 | Latitude | 30° 29' 12.217 | ||||||||
Name |
US AIR FORCE EGLIN AMMO STOR BLDG 1220 |
Longitude | 86° 31' 24.815 | ||||||||
EGLIN AFB, FL 32542 | LL Method | DGPS | |||||||||
Contact | LARRY CHAVERS | LL Status | REVIEWED | ||||||||
Phone | (904) 882-4175 | Status Date | 12/01/2003 | ||||||||
Account Owner Information | |||||||||||
Name | US AIR FORCE 96 CEG/CEVCE 700 RANGE RD BLDG #592 EGLIN AFB, FL 32542 |
Effective Date | 07/24/1996 | ||||||||
Contact | MICHAEL F VANNOY | ||||||||||
Phone | (850) 499-0393 | ||||||||||
MICHAEL.VANNOY@US.AF.MIL | |||||||||||
Placard # / Date | 695068 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | US AIR FORCE 96 CEG/CEVCE 700 RANGE RD BLDG #592 EGLIN AFB, FL 32542 |
Effective Date | 07/24/1996 | ||||||||
Contact | MICHAEL F VANNOY | ||||||||||
Phone | (850) 499-0393 | ||||||||||
MICHAEL.VANNOY@US.AF.MIL | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1220-1 | 6000 | Vehicular Diesel (D) | 01/01/1992 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (I) Suction piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (V) Suction pump check valve |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1220- | 5000 | Leaded Gas (A) | 01/01/1954 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 03/12/2020 | 03/12/2025 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 12/13/2004 | 12/13/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 12/05/2005 | 12/15/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS NOTED THIS INSPECTION | |||||||||||
TCI | 11/04/2004 | 11/08/2004 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/17/2004 | 02/23/2004 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 12/17/2002 | 12/30/2002 | IN-COMPLIANCE | JOHN S. STEVENSON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 11/20/2001 | 12/12/2001 | IN-COMPLIANCE | STEVENSON_JS | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/28/2001 | 03/14/2001 | IN-COMPLIANCE | HUTCHERSON_VP | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/23/2000 | 03/01/2000 | IN-COMPLIANCE | METZLER_SC | 0/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Phone Conversation | 04/11/2025 | Satisfied | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 12/06/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Record Document | 09/27/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Enforcement Referral | 09/27/2024 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 09/27/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Document Management | 07/10/2024 | Satisfied | GARTIN_D | Incident | |||||||
Record Document | 07/10/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 07/10/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 08/31/2023 | In Compliance | GARTIN_D | 0/1 | Routine Compliance | ||||||
Letter | 08/31/2023 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Electronic Communication | 08/31/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Issue Document | 12/27/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Letter | 12/27/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 12/21/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Electronic Communication | 12/21/2021 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 12/21/2021 | In Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 03/24/2020 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Letter | 03/24/2020 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 03/20/2020 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 03/20/2020 | In Compliance | PANGAHAS_RL_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 03/20/2020 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 03/13/2017 | In Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 10/31/2014 | In Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 02/28/2013 | In Compliance | BRAZILE_DO_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 02/03/2011 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/22/2010 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/14/2009 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/17/2008 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 12/13/2006 | In Compliance | HALE_JS_1 | 0/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/10/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The facility must investigate if a discharge has occurred for the failed single wall spill bucket. Additionally, have a certified contractor conduct the replacement of the single wall spill bucket. Submit associated work notification form and documentation from investigation into if a discharge occurred to Daniel.Gartin@flhealth.gov. Once bucket is replaced, submit associated integrity testing of new spill bucket to Daniel.Gartin@flhealth.gov. | |||||||
07/10/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The facility is required to conduct an investigation to determine if a discharge occurred. The dispenser must be repaired or replaced depending on cause of failed integrity testing by a license petroleum contractor. Inform Daniel.Gartin@flhealth.gov of associated work being conducted to repair or replace damaged dispenser and any documentation which shows no discharge occurred. | |||||||
No Discharges Found |