DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 01/22/2025        Last Data Refresh: 01/21/2025        Report Generated from DOPPLER
 
District Southeast   Type    County Government
 
County Miami-Dade   Status    OPEN
 
ID 9602348   Latitude    25° 36' 41.9376
 
Name DADE CNTY-METRO ZOO
12400 SW 152ND ST
Longitude    80° 23' 55.9921
  MIAMI, FL 33177 LL Method    DGPS
 
Contact WILLIAM ELGAR   LL Status    REVIEWED
 
Phone (305) 251-0400   Status Date    01/21/2004
 
Account Owner Information
 
Name DADE CNTY PARKS & RECREATION
275 NW 2ND ST
MIAMI, FL 33128-1741
Effective Date    01/25/2019
 
Contact TMORGAN/ MRICHARD 3053653015 / MNARDI/3057557800
 
Phone (305) 755-7910
 
Email TOM.MORGAN@MIAMIDADE.GOV
  Placard # / Date    699318 - 07/10/2024
Property Owner Information
 
Name DADE CNTY PARKS & RECREATION
275 NW 2ND ST
MIAMI, FL 33128-1741
Effective Date    01/25/2019
 
Contact TMORGAN/ MRICHARD 3053653015 / MNARDI/3057557800
 
Phone (305) 755-7910
 
Email TOM.MORGAN@MIAMIDADE.GOV
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
10 898 Emerg Generator Diesel (G) 09/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
3 1000 Unleaded Gas (B) 02/01/1997 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(P) Internal pipe/internal sump riser
(X) No piping associated w/tank
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
4 1000 Emerg Generator Diesel (G) 08/01/2002 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(K) AST containment
(M) Spill containment bucket
(P) Level gauges/alarms
(X) Concrete
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(6) External piping monitoring
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
5 560 Vehicular Diesel (D) 04/01/2018 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal
(X) No piping associated w/tank
(F) Monitor dbl wall tank space
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
6 640 Emerg Generator Diesel (G) 01/01/2009 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
7 1000 Emerg Generator Diesel (G) 02/01/2014 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
8 1500 Emerg Generator Diesel (G) 05/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
9 1768 Emerg Generator Diesel (G) 11/01/2007 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
 
 
Tank Tank Size Content Installed Placement Status
1 1000 Unleaded Gas (B) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
2 3000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (Y) Unknown
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2024 01/31/2025
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2023 01/31/2024
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2022 01/31/2023
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2021 02/01/2022
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2020 01/31/2021
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2018 02/01/2019
LOCAL GOVERNMENTS - BOND RATING TEST   03/17/2016 03/17/2017
LOCAL GOVERNMENTS - BOND RATING TEST   08/14/2012 08/14/2013
LOCAL GOVERNMENTS - BOND RATING TEST   07/13/2010 07/01/2011
LOCAL GOVERNMENTS - BOND RATING TEST   02/22/2008 02/21/2009
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 12/05/2005 02/09/2006 MINOR OUT-OF-COMPLIANCE ECT/BARATH_J 2/0 COMPLIANCE ASSURANCE
 
 Completion Notes ONE 1,000 GALLON COMPARTMENTED TANK NOT REGISTERED; NO MONTHLY VISUAL INSPECTION LOGS; FILL PORTS NOT COLOR COORDINATED, NEED TO PAINT.
 
LTR 11/17/2005 02/09/2006 ECT/BARATH_J 2/0 COMPLIANCE ASSURANCE
 
 Completion Notes NOTIFICATION FOR TCI ON 11/28/05 AT 12:45 PM. ACTUAL TCI OCCURRED 12/05/05.
 
LTR 08/04/2005 08/04/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SERIES OF E-MAILS CONCERNING WHETHER OR NOT THE 1000 GALLON AST IS REGULATED DUE TO IT BEING DIVIDED BY A SINGLE INTER-WALL. RULE INTERPRETATION IS THAT SINCE THE INTER-WALL IS A SINGLE WALL AND DOEN'T ALLOW FOR INTERSTITIAL MONITORING, IT IS REGULATED.
 
CWOE 06/30/2005 06/30/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
LTR 06/30/2005 06/30/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
RRBD 06/30/2005 06/30/2005 IN-COMPLIANCE SELF_M 0/0 COMPLIANCE ASSURANCE
 
RRBD 06/20/2005 06/30/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
CALL 06/06/2005 06/06/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
RRBD 04/12/2005 06/03/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
MEET 04/07/2005 04/07/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
NCLI 02/25/2005 03/14/2005 SELF_M 0/0 COMPLIANCE ASSURANCE
 
TCI 12/14/2004 02/08/2005 SIGNIFICANT OUT-OF-COMPLIANCE CUBINSKI_K 2/0 COMPLIANCE ASSURANCE
 
 Completion Notes TANK 3 IS A 1,000 GALLON COMPARTMENTED TANK (500 EACH SIDE) THAT IS USED TO FUEL VEHICLES. THIS TANK WAS MISTAKENLY REMOVED FROM LIST OF REGISTERED TANKS.
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 12/02/2024 Major Out of Compliance SABIR_A 8/0 Routine Compliance
 
Site Inspection 10/21/2024 Major Out of Compliance SABIR_A 5/0 Installation
 
Site Inspection 12/13/2021 Major Out of Compliance LANDFIELD_J 3/0 Routine Compliance
 
Electronic Communication 11/08/2021 Satisfied LANDFIELD_J Routine Compliance
 
Letter 01/23/2019 Satisfied WILLIAMS_CEW Routine Compliance
 
Letter 01/04/2019 Satisfied WILLIAMS_CEW Compliance Assistance
 
Site Inspection 01/02/2019 Minor Out of Compliance WILLIAMS_CEW 2/0 Routine Compliance
 
Site Inspection 03/18/2016 In Compliance WILLIAMS_CEW 2/0 Routine Compliance
 
Site Inspection 03/20/2013 In Compliance WILLIAMS_CEW 2/0 Routine Compliance
 
Site Inspection 11/04/2010 In Compliance DOLAN_J 2/0 Routine Compliance
 
Record Document 02/12/2009 Satisfied DOLAN_J Non-Compliance
 
Record Document 07/10/2008 Satisfied LARA_MX Non-Compliance
 
Letter 06/26/2008 Satisfied LARA_MX Non-Compliance
 
Site Inspection 06/23/2008 Major Out of Compliance LARA_MX 2/0 Routine Compliance
 
Site Inspection 04/25/2007 Minor Out of Compliance WHITE_CM 1/0 Routine Compliance
 
Record Document 09/19/2006 Satisfied QURESHI_SA Non-Compliance
 
Letter 07/28/2006 Satisfied QURESHI_SA Non-Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
04/22/2024 7125 SNC-A 1.17 Owner, operator, or supplier deposited motor fuel into storage tank without current valid registration placard. Notify The Department of any installation activities minimum 30-45 days prior to the work being done
 
04/22/2024 7010 SNC-A 1.8 No financial responsibility instrument or expired instrument for > 180 days. Provide certificates of responsibility to Tanks 4, 6, 7, 8, 9, 10.
 
04/22/2024 7040 SNC-B 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. Install an FDEP approved equipment gauge or high level and high fuel alarms that are either visible or audible to the operator at 90 and 95% fill capacity.
 
04/22/2024 7065 SNC-B 1.6 Storage tank system not visually inspected once a month. Provide monthly monitoring to Tank 4.
 
04/22/2024 7079 Minor 3.5 Repairs not completed per applicable standards. Repair the component.
 
04/22/2024 7020 Minor 1.2 Integrity Testing of secondary containment systems and interstitial spaces not performed before being placed into service. Test the interstice in Tanks 6,7,8,9,10.
 
03/26/2024 7075 SNC-B 3.1 Not repaired component or piping which has not caused a discharge or release. Repair or replace the components. Tank 5 Krueger Gauge Replaced. - 4/3/2024.
 
03/26/2024 7041 Minor 1.10 Failure to designate, register, or annually test primary overfill protection device, Submit the document.
 
03/26/2024 7010 SNC-A 1.8 No financial responsibility instrument or expired instrument for > 180 days. Provide proof of insurance.
 
 
 
No Discharges Found