![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9701266 | Latitude | 25° 26' 31.4398 | ||||||||
Name |
SUNSHINE #06 505 SE 1ST AVE |
Longitude | 80° 28' 28.8674 | ||||||||
HOMESTEAD, FL 33034-5011 | LL Method | DPHO | |||||||||
Contact | MAXIMO ALVAREZ | LL Status | REVIEWED | ||||||||
Phone | (305) 477-5800 | Status Date | 10/29/2019 | ||||||||
Account Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 12/11/2012 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Placard # / Date | 694703 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE Doral, FL 33172-2614 |
Effective Date | 01/24/2019 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Ethanol E10 (8) | 08/01/1997 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Ethanol E10 (8) | 08/01/1997 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/25/2023 | 09/25/2024 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2021 | 09/25/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 09/25/2014 | 09/25/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 09/25/2013 | 09/25/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 09/25/2012 | 09/25/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 05/19/2011 | 05/19/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/19/2010 | 05/19/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/19/2007 | 05/19/2008 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 08/08/2005 | 08/30/2005 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/30/2004 | 01/04/2005 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/03/2004 | 11/09/2004 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/27/2004 | 10/28/2004 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 10/26/2004 | 10/28/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 10/09/2003 | 10/10/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | BOWEN, O | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 07/10/2002 | 07/12/2002 | MINOR OUT-OF-COMPLIANCE | BOWEN, O | 0/2 | COMPLIANCE ASSURANCE | |||||
TCQA | 03/21/2002 | 06/21/2002 | MINOR OUT-OF-COMPLIANCE | RAINEY_A | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST QUALITY INSPECTION | |||||||||||
TCI | 02/26/2002 | 02/26/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | BOWEN, O | 0/2 | COMPLIANCE ASSURANCE | |||||
PDNE | 12/29/2000 | 01/08/2001 | LAMOLA_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes QUESTION #119 WAS ENTERED BY MISTAKE ON 22-MAY-2000 | |||||||||||
TCI | 05/22/2000 | 05/25/2000 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/27/2000 | 03/29/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | LAMOLA, S | 0/2 | COMPLIANCE ASSURANCE | |||||
TCDI | 06/04/1999 | 06/21/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | LAMOLA, S | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 10/31/2023 | Major Out of Compliance | MATUTERODRIGUEZ_MA_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/31/2023 | Satisfied | MATUTERODRIGUEZ_MA_1 | Compliance Assistance | |||||||
Electronic Communication | 10/27/2023 | Satisfied | MATUTERODRIGUEZ_MA_1 | Routine Compliance | |||||||
Letter | 12/28/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||||||
Site Inspection | 12/28/2021 | In Compliance | GRIMALDO_JN_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/23/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||||||
Electronic Communication | 01/21/2020 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 01/21/2020 | Satisfied | DASHTAKI_K_1 | Compliance Assistance | |||||||
Electronic Communication | 10/30/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 10/29/2019 | Major Out of Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/29/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 03/27/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Site Inspection | 03/15/2017 | In Compliance | FERNANDEZBANGO_CE_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/14/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Site Inspection | 04/14/2015 | In Compliance | FERNANDEZBANGO_CE_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 04/14/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Enforcement Tracking | 02/27/2014 | Closed Without Enforcement | KONG_TE_1 | Enforcement | |||||||
Site Inspection | 11/04/2013 | In Compliance | BARTHELEMY_BX_1 | 0/2 | Non-Compliance | ||||||
Document Management | 10/07/2013 | Complete | KONG_TE_1 | Enforcement | |||||||
Enforcement Referral | 09/27/2013 | Accepted | KONG_TE_1 | Enforcement | |||||||
Site Inspection | 09/26/2013 | Major Out of Compliance | BARTHELEMY_BX_1 | 0/2 | Non-Compliance | ||||||
Letter | 09/26/2013 | Satisfied | BARTHELEMY_BX_1 | Non-Compliance | |||||||
Site Inspection | 08/12/2013 | Minor Out of Compliance | BARTHELEMY_BX_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/08/2013 | Satisfied | BARTHELEMY_BX_1 | Routine Compliance | |||||||
Phone Conversation | 08/08/2013 | Satisfied | BARTHELEMY_BX_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/20/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 05/20/2013 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 05/20/2013 | Major Out of Compliance | DASHTAKI_K_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/20/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 09/15/2011 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 09/09/2011 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||||||
Letter | 09/07/2011 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 09/07/2011 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/11/2011 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 01/27/2011 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 01/03/2011 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Letter | 08/10/2010 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 08/10/2010 | Major Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/22/2008 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Letter | 04/08/2008 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 04/08/2008 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 03/11/2008 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/11/2008 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 09/17/2007 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||||||
Letter | 01/08/2007 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 01/08/2007 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Letter | 12/05/2006 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 12/05/2006 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||||||
Letter | 10/23/2006 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 10/23/2006 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/27/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing tests: - Integrity test of two (2) double-walled fill port spill buckets - Integrity tests of two (2) STP sumps - Integrity test of four (4) dispenser sumps | |||||||
10/27/2023 | 6038 | SNC-B | 4.9 Shear valve not installed properly. | Properly brace the shear valves in dispensers #3-4 and #7-8. Provide photos of completed work. | |||||||
10/27/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Vacuum gauges were replaced by Discovery Tank Testing on 05/03/2023 and on 05/25/2023 but have not been certified. Provide a passing certification. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/03/1999 | COMPLETED | 47 | |||||||||