Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9800896 | Latitude | 25° 53' 44.2097 | ||||||||
Name |
OPA LOCKA ON THE RUN 13350 NW 27TH AVE |
Longitude | 80° 14' 38.0695 | ||||||||
OPA LOCKA, FL 33054-4834 | LL Method | DPHO | |||||||||
Contact | FREDDY LAVERDE | LL Status | REVIEWED | ||||||||
Phone | (305) 888-4611 | Status Date | 08/25/2020 | ||||||||
Account Owner Information | |||||||||||
Name | TROPIC OIL CO 10002 NW 89th Ave Medley, FL 33178-1409 |
Effective Date | 12/16/2021 | ||||||||
Contact | FREDDY LAVERDE / MARK BUMGARDNER | ||||||||||
Phone | (305) 888-4611 | ||||||||||
FREDDY.LAVERDE@PARKLANDUSA.COM | |||||||||||
Placard # / Date | 680819 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | TROPIC OIL CO 10002 NW 89th Ave Medley, FL 33178-1409 |
Effective Date | 12/16/2021 | ||||||||
Contact | FREDDY LAVERDE / MARK BUMGARDNER | ||||||||||
Phone | (305) 888-4611 | ||||||||||
FREDDY.LAVERDE@PARKLANDUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Ethanol E10 (8) | 04/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Ethanol E10 (8) | 04/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Vehicular Diesel (D) | 02/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (8) Manually sampled wells (F) Monitor dbl wall tank space (H) Mechanical line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SURETY BOND | 03/12/2024 | ||||||||||
INSURANCE | 01/01/2023 | 01/01/2024 | SCOTTSDALE INSURANCE COMPANY | ||||||||
INSURANCE | 03/01/2021 | 03/01/2022 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 03/01/2020 | 03/01/2021 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 02/23/2017 | 02/23/2018 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 02/23/2015 | 02/23/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 02/23/2015 | 02/23/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 02/23/2013 | 02/23/2014 | ILLINOIS UNION | ||||||||
INSURANCE | 02/23/2012 | 02/23/2013 | ILLINOIS UNION | ||||||||
INSURANCE | 02/23/2011 | 02/23/2012 | ILLINOIS UNION | ||||||||
INSURANCE | 02/23/2010 | 02/23/2011 | ILLINOIS UNION | ||||||||
INSURANCE | 02/23/2009 | 02/23/2010 | ACE | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 09/06/2005 | 09/12/2005 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/11/2005 | 04/18/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/14/2005 | 04/01/2005 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 02/17/2005 | 02/22/2005 | IN-COMPLIANCE | SHER, R | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/01/2004 | 07/22/2004 | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/15/2004 | 03/30/2004 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 06/12/2003 | 06/16/2003 | IN-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/26/2003 | 03/28/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 11/29/2001 | 12/04/2001 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 02/27/2001 | 03/06/2001 | IN-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 01/31/2001 | 02/01/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 10/18/1999 | 10/20/1999 | IN-COMPLIANCE | RONDON, K | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/18/1999 | 11/05/1999 | RONDON, K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 09/08/1999 | 10/01/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONDON, K | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 08/13/1999 | 08/17/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONDON, K | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 11/22/2024 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 11/22/2024 | Major Out of Compliance | RODRIGUEZ_F | 0/3 | Discharge | ||||||
Site Inspection | 11/06/2023 | In Compliance | JACQUET_F_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 11/06/2023 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 11/06/2023 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 05/17/2023 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 05/17/2023 | Major Out of Compliance | RODRIGUEZ_F | 0/3 | Routine Compliance | ||||||
Electronic Communication | 05/17/2023 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Incident | 12/02/2021 | Has not led to Discharge | JACQUET_F_1 | Incident | |||||||
Electronic Communication | 11/30/2021 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 11/29/2021 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 11/29/2021 | In Compliance | JACQUET_F_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 12/07/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Document Management | 12/07/2020 | Satisfied | JACQUET_F_1 | Incident | |||||||
Electronic Communication | 09/10/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 09/04/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 08/31/2020 | Major Out of Compliance | JACQUET_F_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 08/05/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 08/05/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Record Document | 02/08/2018 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 02/08/2018 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Site Inspection | 02/08/2018 | In Compliance | DEZAYAS_A_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 12/04/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 12/04/2017 | Minor Out of Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/04/2017 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 11/27/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 11/27/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 11/27/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 04/05/2017 | In Compliance | DEZAYAS_A_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 04/06/2016 | Satisfied | CRUZ_I_2 | Non-Compliance | |||||||
Letter | 09/10/2015 | Satisfied | DEZAYAS_A_1 | Non-Compliance | |||||||
Site Inspection | 09/10/2015 | Minor Out of Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/10/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 09/04/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 09/04/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 10/08/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 10/08/2013 | In Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/08/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 05/10/2012 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/16/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 02/16/2012 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 02/16/2012 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/29/2011 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 04/13/2011 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Letter | 04/04/2011 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 02/08/2011 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 10/04/2010 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 06/16/2009 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Enforcement Tracking | 06/16/2009 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Letter | 06/16/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Letter | 06/16/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Letter | 06/16/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Issue Document | 01/09/2009 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Letter | 01/09/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 01/09/2009 | Major Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Enforcement Referral | 01/09/2009 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 07/08/2008 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 06/30/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 03/13/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Letter | 03/07/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 03/07/2008 | Major Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Letter | 07/11/2007 | Satisfied | SHER_RC_1 | Non-Compliance | |||||||
Site Inspection | 07/11/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 06/22/2007 | Minor Out of Compliance | SHER_RC_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 06/19/2007 | Major Out of Compliance | SHER_RC_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/22/2024 | 6018 | SNC-B | 4.6 Discharge not reported within 24-hours, or by next business day. | Submit a DRF for the discharge observed in the monitoring well. | |||||||
11/22/2024 | 6020 | SNC-A | 4.9 Actions not taken immediately to contain, remove, and abate the discharge. | Provide a current and passing test for all of the underground storage tanks (USTs) onsite as follows: 1. Tank tightness test 2. Line tightness test for all primary and secondary product piping 3. Integrity test of the annular space 4. Annual operability test of the release detection device 5. Annual operability test of the overfill protection devices 6. Annual operability of the mechanical line leak detectors 7. Integrity test of the STP sumps 8. Integrity test of dispenser liners 9. Integrity test of the fill port spill containment buckets | |||||||
11/22/2024 | 6020 | SNC-A | 4.9 Actions not taken immediately to contain, remove, and abate the discharge. | Properly remove and dispose of free-floating product within the contaminated monitoring wells provide disposal documentation/manifests. | |||||||
No Discharges Found |