![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Lake | Status | OPEN | ||||||||
ID | 9801117 | Latitude | 28° 52' 24.9773 | ||||||||
Name |
FERESH STOP 1403 1905 N HWY 19 |
Longitude | 81° 41' 14.9939 | ||||||||
EUSTIS, FL 32726 | LL Method | DPHO | |||||||||
Contact | NICOLE MAJKOWICZ | LL Status | REVIEWED | ||||||||
Phone | (312) 506-4180 | Status Date | 09/18/2023 | ||||||||
Account Owner Information | |||||||||||
Name | CAMERON SQRL 1905 EUSTIS LLC 6805 CARNEGIE BLVD, SU#120 CHARLOTTE, NC 28211 |
Effective Date | 03/13/2024 | ||||||||
Contact | NICOLE MAJKOWICZ | ||||||||||
Phone | (312) 506-4180 | ||||||||||
NICOLE@INCONVENIENCEINC.COM | |||||||||||
Placard # / Date | 704724 - 12/17/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CAMERON SQRL 1905 EUSTIS LLC 6805 CARNEGIE BLVD, SU#120 CHARLOTTE, NC 28211 |
Effective Date | 03/13/2024 | ||||||||
Contact | NICOLE MAJKOWICZ | ||||||||||
Phone | (312) 506-4180 | ||||||||||
NICOLE@INCONVENIENCEINC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 12/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Vehicular Diesel (D) | 12/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 11/01/2002 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 12/01/1998 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/18/2023 | 10/25/2024 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 09/03/2021 | 09/03/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 04/15/2019 | 04/15/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 04/15/2017 | 04/15/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 04/15/2014 | 04/15/2015 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 04/15/2013 | 04/15/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 04/15/2012 | 04/15/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2007 | 12/17/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 03/17/2006 | 04/03/2006 | IN-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILTITY OUT OF SERVICE, TANK EMPTY. | |||||||||||
TCI | 03/14/2006 | 03/20/2006 | IN-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SYSTEM IN REGISTERED AS OUT OF SERVICE. PLLD AND VR/SENSOR CERT. DONE 1/06. | |||||||||||
LTR | 03/31/2005 | 04/05/2005 | BOWERS | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED PLLD & SENSOR CERT. | |||||||||||
TCI | 03/14/2005 | 03/21/2005 | MINOR OUT-OF-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PLLD OP TEST AND SENSOR CERT - 3/05. "LIQUID STATUS" AS RD. | |||||||||||
TIN | 06/20/2004 | 07/20/2004 | MINOR OUT-OF-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE REPORT RECEIVED FROM ECS FOR REPLACEMENT OF R/UL SPILL BUCKET. NO NOTIFICATION TO COUNTY PRIOR TO WORK BEING PERFORMED THEREFORE NO CLOSURE INSPECTION WAS PERFORMED. CLOSURE REPORT STATES NO CONTAMINATION . | |||||||||||
TCR | 05/24/2004 | 05/25/2004 | IN-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DISP. 5/6 HYDRO TEST OK. | |||||||||||
TCR | 05/13/2004 | 05/25/2004 | IN-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FILL LIDS PAINTED | |||||||||||
TCI | 03/16/2004 | 03/22/2004 | MINOR OUT-OF-COMPLIANCE | COX, BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PLLD TESTED 4/10/03, SENSOR CERT. 3/10/04 | |||||||||||
IRFR | 03/16/2004 | 04/05/2004 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RECEIVED INF FOR RIPPED CONDUIT BOOT IN DL 5/6. INVESTIGATION FOUND NO DISCHARGE. | |||||||||||
TCDI | 10/13/2003 | 10/15/2003 | IN-COMPLIANCE | BOWERS | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSPECTION IN CONJUNCTION WITH DRF. NEW CONCRETE LAID DOWN, PIPING IS DW, RIDGED, FIB. | |||||||||||
DRFR | 10/09/2003 | 10/13/2003 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RECEIVED DRF IN CONJUNCTION WITH INF FOR LEAK IN PIPING. A.T.C. DOING CLOSURE, SOIL SAMPLES COME BACK CONTAMINATED. | |||||||||||
IRFR | 09/23/2003 | 10/08/2003 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RECEIVED INF FOR RUL PRODUCT LEAK IN STP SUMP. RECEIVED LETTER STATING THAT LEAK WAS IN ELBO OF PRIMARY PIPING JUST OUTSIDE OF SUMP. NO DRF SUBMITTED, FORWARD TO SEMINOLE COUNTY FOR CLEAN-UP. | |||||||||||
TCR | 04/29/2003 | 05/02/2003 | IN-COMPLIANCE | BOWERS/COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes RECEIVED MLLD & SENSOR CERT. FILLS PAINTED W/ CROSSES. | |||||||||||
TCI | 03/25/2003 | 03/27/2003 | MINOR OUT-OF-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SENSOR CERT. 3/28/03, MLLD 4/10/03. RD IS "LIQUID STATUS". | |||||||||||
TXI | 11/25/2002 | 11/27/2002 | IN-COMPLIANCE | COX | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSURE OF 1 UST. WORK DONE BY UNIVERSAL PETRO., CLOSURE PERFORMED BY ATC, INC. AND TANK FILLED IN PLACE BY SOUTHERN FOAM INSALATION. | |||||||||||
TIN | 11/15/2002 | 11/19/2002 | IN-COMPLIANCE | BOWERS/COX | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF 1 - 12,000 GALLON UST (XERXES) BY UNIVERSAL PETRO. LINE AND TANK TEST BY DOWN UNDER - PASS. | |||||||||||
DRFR | 10/31/2002 | 11/05/2002 | BOWERS | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes DRF RECEIVED IN CONJUNCTION WITH CLOSURE OF 1 UST.MONITORING WELL CAME BACK WITH 10.6 PPM OF BENZENE. | |||||||||||
DCCR | 10/31/2002 | 11/17/2003 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF CONFERMED. OCCURED DURING REMOVAL OF TANK. | |||||||||||
IRFR | 08/02/2002 | 09/04/2002 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF RECEIVED FOR ALARMS IN RUL & PUL INTERSTITIAL. J&M PUMP SERVICED AND RESET ALARM | |||||||||||
TCR | 06/13/2002 | 06/20/2002 | IN-COMPLIANCE | COX | 0/3 | DISCHARGE PROJECT | |||||
Completion Notes INTERSTITIAL ALARM OK | |||||||||||
TCI | 03/29/2002 | 04/01/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | COX/BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL COMPLIANCE. MLLD 3/16/02 | |||||||||||
IRFR | 03/18/2002 | 03/26/2002 | BOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LEAKING UNDER DISPENSER. LEAK WAS REPAIRED AND LINE TESTED TIGHT. | |||||||||||
TCI | 01/25/2001 | 02/06/2001 | IN-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL COMPLIANCE. P/UL MLLD DONE 3/22/02. | |||||||||||
TCR | 05/22/2000 | 05/24/2000 | IN-COMPLIANCE | BOWERS/COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes RE-INSP. | |||||||||||
TCI | 04/17/2000 | 04/19/2000 | MINOR OUT-OF-COMPLIANCE | BOWERS/COX | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ANNUAL COMPLIANCE | |||||||||||
TIN | 06/01/1999 | 06/17/1999 | IN-COMPLIANCE | KRUSE | 0/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF NEW SYSTEM. | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/13/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
TCAR | 03/13/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
TCAR | 03/12/2025 | Incomplete | KIDDER_MS_1 | Component Closure | |||||||
Site Inspection | 02/24/2025 | Major Out of Compliance | KIDDER_MS_1 | 0/3 | Compliance Assistance | ||||||
Letter | 02/24/2025 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 02/13/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Electronic Communication | 02/12/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Document Management | 02/07/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Electronic Communication | 02/04/2025 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 12/11/2024 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Electronic Communication | 02/26/2024 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 02/26/2024 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Letter | 02/26/2024 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Electronic Communication | 12/18/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Letter | 12/07/2023 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Site Inspection | 12/07/2023 | Minor Out of Compliance | KIDDER_MS_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 11/27/2023 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Electronic Communication | 11/27/2023 | Satisfied | KIDDER_MS_1 | Component Closure | |||||||
Letter | 10/02/2023 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Electronic Communication | 10/02/2023 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Site Inspection | 10/02/2023 | Major Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/25/2023 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 04/04/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Letter | 04/04/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Site Inspection | 03/31/2022 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Letter | 03/31/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Electronic Communication | 03/10/2022 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 03/07/2022 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 12/29/2021 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Enforcement Tracking | 11/22/2021 | Closed With Enforcement | RAINEY_A | Enforcement | |||||||
Document Management | 11/22/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Document Management | 11/04/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Document Management | 10/27/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/11/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Phone Conversation | 10/07/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Phone Conversation | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Document Management | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Phone Conversation | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Phone Conversation | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 10/06/2021 | Satisfied | RAINEY_A | Enforcement | |||||||
Site Inspection | 05/24/2021 | Major Out of Compliance | RAINEY_A | 0/3 | Enforcement | ||||||
Enforcement Referral | 11/23/2020 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 11/10/2020 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Issue Document | 11/10/2020 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 10/07/2020 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/05/2020 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Electronic Communication | 04/20/2020 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Electronic Communication | 01/02/2020 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Letter | 10/18/2019 | Satisfied | COX_CD_1 | Compliance Assistance | |||||||
Site Inspection | 10/18/2019 | Major Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 10/09/2019 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 08/22/2019 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 06/05/2017 | Satisfied | COX_CD_1 | Non-Compliance | |||||||
Letter | 05/08/2017 | Satisfied | COX_CD_1 | Non-Compliance | |||||||
Site Inspection | 04/27/2017 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 03/24/2017 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Electronic Communication | 03/13/2017 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 03/02/2015 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Site Inspection | 03/02/2015 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/08/2013 | In Compliance | COX_CD_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 05/07/2013 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/22/2012 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/24/2011 | In Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/17/2010 | In Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 03/23/2009 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 03/21/2008 | In Compliance | ZIMMERMAN_RA_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 03/14/2007 | In Compliance | ZIMMERMAN_RA_1 | 0/4 | Routine Compliance | ||||||
Record Document | 02/21/2007 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | COX_CD_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/07/2025 | 6083 | SNC-B | 4.14 Closure assessment, sampling not performed and submitted within 60 days. | Please provide the PUL, and DSL spill bucket closure assessment for review. | |||||||
02/04/2025 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Please provide the required Financial Responsibility forms in order to resolve the violation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/31/2002 | COMPLETED | 10 | |||||||||