![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Leon | Status | OPEN | ||||||||
ID | 9801506 | Latitude | 30° 35' 14.7207 | ||||||||
Name |
BRADFORDVILLE SUSIE Q'S FOOD 1500 BANNERMAN RD |
Longitude | 84° 15' 6.9514 | ||||||||
TALLAHASSEE, FL 32308 | LL Method | DPHO | |||||||||
Contact | SAGAR PATEL | LL Status | REVIEWED | ||||||||
Phone | (850) 894-9912 | Status Date | 09/21/2023 | ||||||||
Account Owner Information | |||||||||||
Name | ADE 719 LLC PO BOX 2300 THOMASVILLE, GA 31799 |
Effective Date | 06/24/2021 | ||||||||
Contact | MUKESH PATEL | ||||||||||
Phone | (229) 551-1811 | ||||||||||
JENNIFER@SUSIE-QS.COM | |||||||||||
Placard # / Date | 683507 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ADE 719 LLC PO BOX 2300 THOMASVILLE, GA 31799 |
Effective Date | 06/24/2021 | ||||||||
Contact | MUKESH PATEL | ||||||||||
Phone | (229) 551-1811 | ||||||||||
JENNIFER@SUSIE-QS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 12/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 12/01/1998 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Vehicular Diesel (D) | 12/01/1998 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/30/2024 | 09/30/2025 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/30/2022 | 09/30/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/30/2021 | 09/30/2022 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/30/2020 | 09/30/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/30/2018 | 09/30/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/30/2017 | 09/30/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/24/2014 | 12/24/2015 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 12/24/2012 | 12/24/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/24/2011 | 12/24/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/24/2010 | 12/24/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/24/2009 | 12/24/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/24/2008 | 12/24/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
CWOE | 02/02/2006 | 03/10/2006 | FRENHC | 0/1 | COMPLIANCE ASSURANCE | ||||||
TCR | 02/02/2006 | 03/10/2006 | IN-COMPLIANCE | FRENCH | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/18/2006 | 03/10/2006 | FRENCH | 0/1 | COMPLIANCE ASSURANCE | ||||||
NCLI | 01/06/2006 | 01/06/2006 | FRENCH | /1 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/29/2005 | 01/06/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | FRENCH | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 01/26/2005 | 02/04/2005 | IN-COMPLIANCE | HATCHER | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/24/2004 | 02/27/2004 | IN-COMPLIANCE | HATCHER | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 01/13/2003 | 01/23/2003 | IN-COMPLIANCE | HATCHER | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/13/2002 | 12/13/2002 | FRENCH | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/06/2002 | 12/13/2002 | IN-COMPLIANCE | FRENCH | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/06/2002 | 08/06/2002 | FRENCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 08/05/2002 | 08/06/2002 | IN-COMPLIANCE | FRENCH | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/11/2002 | 08/06/2002 | FRENCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 02/12/2002 | 02/12/2002 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/05/2002 | 02/12/2002 | MINOR OUT-OF-COMPLIANCE | ROSS | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 03/27/2001 | 03/28/2001 | IN-COMPLIANCE | SHEFFIELD | 0/2 | COMPLIANCE ASSURANCE | |||||
DSNR | 03/27/2001 | 03/28/2001 | ROSS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes TCR SHOWS VACUUM REAPPLIED AND HOLDING SEE COMPLIANCE PROJECT. | |||||||||||
CWOE | 03/27/2001 | 03/28/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VACUUM LOSS INVESTIGATED, VACUUM REAPPLIED, OK. | |||||||||||
RRBD | 03/21/2001 | 03/28/2001 | ROSS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LTR SAYING VACUUM REAPPLIED. | |||||||||||
NCLI | 03/01/2001 | 03/01/2001 | ROSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
IRFR | 02/26/2001 | 03/01/2001 | ROSS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes VACUUM LOSS BEYOND 20% BOTH TANKS | |||||||||||
TCI | 02/26/2001 | 03/01/2001 | MINOR OUT-OF-COMPLIANCE | SHEFFIELD | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/03/2000 | 02/09/2000 | IN-COMPLIANCE | MICHAEL SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 04/20/1999 | 04/30/1999 | IN-COMPLIANCE | SHEFFIELD | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 04/04/2025 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Electronic Communication | 04/02/2025 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Letter | 04/02/2025 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Enforcement Referral | 03/25/2025 | Accepted | FRENCH_EC_1 | Enforcement | |||||||
Letter | 12/06/2024 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 12/06/2024 | Major Out of Compliance | FRENCH_EC_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/14/2023 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Letter | 02/14/2023 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 01/05/2023 | Major Out of Compliance | FRENCH_EC_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/05/2023 | Satisfied | FRENCH_EC_1 | Compliance Assistance | |||||||
Site Inspection | 12/08/2020 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/25/2019 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/28/2018 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/24/2016 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/28/2015 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/28/2015 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 10/25/2013 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Issue Document | 10/25/2013 | Satisfied | BRISTOL_S | Enforcement | |||||||
Site Inspection | 10/23/2013 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/23/2013 | In Compliance | HATCHER_JD_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 10/23/2013 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Record Document | 09/27/2013 | Satisfied | FRENCH_EC_1 | Non-Compliance | |||||||
Issue Document | 09/13/2013 | Satisfied | BRISTOL_S | Enforcement | |||||||
Site Inspection | 12/17/2012 | Minor Out of Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/17/2012 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Enforcement Referral | 11/26/2012 | Accepted | BRISTOL_S | Enforcement | |||||||
Letter | 07/26/2012 | Satisfied | FRENCH_EC_1 | Non-Compliance | |||||||
Letter | 06/04/2012 | Satisfied | FRENCH_EC_1 | Non-Compliance | |||||||
Site Inspection | 06/04/2012 | Minor Out of Compliance | FRENCH_EC_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/31/2012 | Satisfied | FRENCH_EC_1 | Routine Compliance | |||||||
Site Inspection | 03/11/2011 | In Compliance | FRENCH_EC_1 | 0/2 | Non-Compliance | ||||||
Phone Conversation | 02/23/2011 | Satisfied | FRENCH_EC_1 | Non-Compliance | |||||||
Site Inspection | 02/01/2011 | Minor Out of Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/01/2011 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Letter | 02/01/2011 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 01/25/2010 | In Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 03/05/2009 | In Compliance | FRENCH_EC_1 | 0/3 | Non-Compliance | ||||||
Letter | 12/09/2008 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 12/09/2008 | Minor Out of Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/09/2008 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 12/09/2008 | In Compliance | HATCHER_JD_1 | 0/2 | Closure | ||||||
Record Document | 11/18/2008 | Satisfied | BRISTOL_S | Enforcement | |||||||
Enforcement Tracking | 11/18/2008 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Issue Document | 09/16/2008 | Satisfied | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 03/10/2008 | Accepted | BRISTOL_S | Enforcement | |||||||
Letter | 02/15/2008 | Satisfied | FRENCH_EC_1 | Discharge | |||||||
Letter | 12/12/2007 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Site Inspection | 12/12/2007 | Minor Out of Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Site Inspection | 05/14/2007 | In Compliance | FRENCH_EC_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 03/06/2007 | Minor Out of Compliance | HATCHER_JD_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/06/2007 | Satisfied | HATCHER_JD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/19/2007 | Satisfied | HATCHER_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/02/2006 | Satisfied | FRENCH_EC_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/13/2008 | COMPLETED | 55 | |||||||||