Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 9801832 | Latitude | 30° 21' 53.414 | ||||||||
Name |
M & A FOOD MART 4211 MONCRIEF RD |
Longitude | 81° 40' 43.8163 | ||||||||
JACKSONVILLE, FL 32209-3937 | LL Method | DGPS | |||||||||
Contact | HITESH PATEL | LL Status | REVIEWED | ||||||||
Phone | (904) 764-1406 | Status Date | 12/12/2003 | ||||||||
Account Owner Information | |||||||||||
Name | M & A FOOD MART 4211 MONCRIEF RD JACKSONVILLE, FL 32209 |
Effective Date | 06/26/2008 | ||||||||
Contact | HITESH PATEL | ||||||||||
Phone | (904) 764-1406 | ||||||||||
PIPELINE4211@GMAIL.COM | |||||||||||
Placard # / Date | 669327 - 08/15/2023 | ||||||||||
Property Owner Information | |||||||||||
Name | M & A FOOD MART 4211 MONCRIEF RD JACKSONVILLE, FL 32209 |
Effective Date | 06/26/2008 | ||||||||
Contact | HITESH PATEL | ||||||||||
Phone | (904) 764-1406 | ||||||||||
PIPELINE4211@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 09/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 09/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/29/2019 | 01/29/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 06/02/2017 | 06/02/2018 | ACE | ||||||||
INSURANCE | 04/21/2016 | 04/21/2017 | ACE | ||||||||
INSURANCE | 02/26/2014 | 02/26/2015 | ACE | ||||||||
INSURANCE | 02/21/2013 | 02/21/2014 | ACE | ||||||||
INSURANCE | 06/29/2011 | 06/29/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/29/2010 | 06/29/2011 | ACE | ||||||||
INSURANCE | 06/26/2009 | 06/26/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/20/2008 | 11/20/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/17/2005 | 03/18/2005 | IN-COMPLIANCE | HOLLOWAY_R | 0/2 | COMPLIANCE ASSURANCE | |||||
PDNE | 06/24/2004 | 06/24/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WITHDRAWAL OF CITATION, REQUIREMENTS WERE MET WITHIN PROPER DEADLINES | |||||||||||
LTR | 06/22/2004 | 06/24/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LETTER WITHDRAWING CITATION SENT, WITH NCLI ISSUED FOR REMAINING VIOLATION TO PROPERLY REFLECT RECORD (170) | |||||||||||
RRBD | 06/22/2004 | 06/24/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED 2003 ATG CERTIFICATION, HAD BEEN COMPLETED WITHIN REQUIRED TIME LIMIT | |||||||||||
CALL | 06/11/2004 | 06/24/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BRYAN CHAMBERLAIN WILL FAX 2003 ATG CERTIFICATION | |||||||||||
CALL | 06/09/2004 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LEFT VOICEMAIL REGARDING SETTLEMENT WITH FACILITY REPRESENTATIVE, STEPHANIE CARDENAS. | |||||||||||
CALL | 05/25/2004 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LEFT VOICEMAIL REGARDING CONSENT ORDER | |||||||||||
CALL | 03/22/2004 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT EMAIL REGARDING SEP INFORMATION AND CONSENT ORDER PROCESS | |||||||||||
CALL | 01/07/2004 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DISCUSSED VIOLATIONS AND CORRECTIVE ACTIONS | |||||||||||
CALL | 01/05/2004 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes DISCUSSED VIOLATIONS AND CORRECTIVE ACTIONS, AND SEP INFORMATION. | |||||||||||
RRBD | 12/29/2003 | 06/09/2004 | LOEFFLER_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESPONSE FROM FACILITY REGARDING CORRECTIVE ACTIONS TO INSPECTOR | |||||||||||
RRBD | 12/27/2003 | 12/29/2003 | IN-COMPLIANCE | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/10/2003 | 12/08/2003 | TORSANKO_G | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/09/2003 | 12/15/2003 | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSURANCE RECEIVED | |||||||||||
CRLE | 12/08/2003 | 12/08/2003 | TORSANKO_G | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes VIOLATIONS 157 & 86 REPEATS | |||||||||||
TCI | 12/06/2003 | 12/08/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/30/2002 | 01/08/2003 | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/19/2002 | 11/20/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/13/2002 | 09/19/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 06/18/2002 | 06/20/2002 | MINOR OUT-OF-COMPLIANCE | TOWNSEND_C | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 10/14/1999 | 12/15/1999 | IN-COMPLIANCE | BORISADE_C | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLED TWO 12000 GAL UST | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Incident | 02/10/2025 | Has not led to Discharge | PAUL_JK | Incident | |||||||
Enforcement Tracking | 07/22/2024 | Closed Without Enforcement | MACK_BT | Enforcement | |||||||
Enforcement Referral | 08/14/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Site Inspection | 08/08/2023 | Major Out of Compliance | LAUGHLIN_MT_1 | 0/2 | Component Closure | ||||||
Electronic Communication | 08/08/2023 | Satisfied | LAUGHLIN_MT_1 | Compliance Assistance | |||||||
Letter | 08/08/2023 | Satisfied | LAUGHLIN_MT_1 | Compliance Assistance | |||||||
Site Inspection | 08/04/2023 | Major Out of Compliance | LAUGHLIN_MT_1 | 0/2 | Routine Compliance | ||||||
Incident | 08/04/2023 | Has not led to Discharge | MCARTOR_H_1 | Incident | |||||||
Electronic Communication | 08/04/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 07/31/2023 | Satisfied | LAUGHLIN_MT_1 | Compliance Assistance | |||||||
Enforcement Tracking | 12/09/2022 | Closed With Enforcement | MACK_BT | Enforcement | |||||||
Enforcement Tracking | 08/10/2022 | Closed Without Enforcement | QUICK_V | Enforcement | |||||||
Document Management | 08/10/2022 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Enforcement Referral | 01/13/2022 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 12/17/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 10/25/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Electronic Communication | 10/25/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Electronic Communication | 10/25/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Electronic Communication | 10/21/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Phone Conversation | 10/21/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Phone Conversation | 10/21/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Phone Conversation | 10/21/2021 | Satisfied | MACK_BT | Enforcement | |||||||
Enforcement Referral | 10/14/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Site Inspection | 10/04/2021 | Major Out of Compliance | MCARTOR_H_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/04/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 10/04/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Document Management | 09/16/2021 | Satisfied | HARRIS_MJ | Enforcement | |||||||
Phone Conversation | 08/20/2021 | Satisfied | MCARTOR_H_1 | Routine Compliance | |||||||
Electronic Communication | 08/20/2021 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Phone Conversation | 07/26/2021 | Satisfied | MCARTOR_H_1 | Routine Compliance | |||||||
Phone Conversation | 07/26/2021 | Satisfied | MCARTOR_H_1 | Routine Compliance | |||||||
Letter | 05/18/2021 | Satisfied | MCKINLEY_DN_1 | Non-Compliance | |||||||
Site Inspection | 05/17/2021 | Major Out of Compliance | MCKINLEY_DN_1 | 0/2 | Compliance Assistance | ||||||
Phone Conversation | 04/26/2021 | Satisfied | MCKINLEY_DN_1 | Routine Compliance | |||||||
Electronic Communication | 04/23/2021 | Satisfied | MCKINLEY_DN_1 | Routine Compliance | |||||||
Phone Conversation | 04/23/2021 | Satisfied | MCKINLEY_DN_1 | Routine Compliance | |||||||
Document Management | 01/27/2020 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Discharge Reporting | 01/27/2020 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
TCAR | 01/27/2020 | Satisfied | RICHARDS_JE_1 | Closure | |||||||
Letter | 01/27/2020 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Letter | 01/27/2020 | Satisfied | RICHARDS_JE_1 | Closure | |||||||
Phone Conversation | 07/12/2019 | Satisfied | OBRIEN_S | Enforcement | |||||||
Letter | 06/28/2019 | Satisfied | OBRIEN_S | Enforcement | |||||||
Enforcement Referral | 04/02/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Letter | 03/22/2019 | Satisfied | VERMILLION_KN_1 | Non-Compliance | |||||||
Site Inspection | 03/22/2019 | Major Out of Compliance | VERMILLION_KN_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/25/2019 | Satisfied | VERMILLION_KN_1 | Routine Compliance | |||||||
Enforcement Tracking | 12/15/2016 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Letter | 12/15/2016 | Satisfied | TOWLE_M | Enforcement | |||||||
Meeting | 12/13/2016 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 11/17/2016 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Letter | 08/08/2016 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Letter | 06/01/2016 | Satisfied | MONDO_PW_1 | Non-Compliance | |||||||
Document Management | 05/31/2016 | Complete | MONDO_PW_1 | Routine Compliance | |||||||
Site Inspection | 05/31/2016 | Minor Out of Compliance | MONDO_PW_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/31/2016 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Electronic Communication | 03/23/2016 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Electronic Communication | 06/02/2014 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Letter | 06/01/2014 | Satisfied | WILLIAMS_AK_1 | Non-Compliance | |||||||
Site Inspection | 05/29/2014 | Major Out of Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/29/2014 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Enforcement Tracking | 09/19/2013 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Site Inspection | 09/13/2013 | In Compliance | TOWLE_M | 0/2 | Enforcement | ||||||
Phone Conversation | 09/09/2013 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 08/27/2013 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 08/27/2013 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 08/19/2013 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 08/19/2013 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 08/15/2013 | Accepted | TOWLE_M | Enforcement | |||||||
Phone Conversation | 08/12/2013 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Letter | 05/16/2013 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Record Document | 03/01/2013 | Satisfied | KOROUS_E_1 | Non-Compliance | |||||||
Letter | 02/28/2013 | Satisfied | KOROUS_E_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/27/2013 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 02/27/2013 | Major Out of Compliance | KOROUS_E_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/06/2012 | Satisfied | CAIN_M_1 | Non-Compliance | |||||||
Complaint | 02/06/2012 | Satisfied | CAIN_M_1 | Complaint | |||||||
Electronic Communication | 02/06/2012 | Satisfied | CAIN_M_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/19/2012 | Satisfied | CAIN_M_1 | Routine Compliance | |||||||
Record Document | 12/21/2011 | Satisfied | CAIN_M_1 | Non-Compliance | |||||||
Letter | 12/21/2011 | Satisfied | CAIN_M_1 | Non-Compliance | |||||||
Site Inspection | 12/20/2011 | Major Out of Compliance | CAIN_M_1 | 0/2 | Routine Compliance | ||||||
Record Document | 01/14/2011 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Tracking | 01/14/2011 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Phone Conversation | 01/06/2011 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 01/05/2011 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 01/03/2011 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 12/21/2010 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 12/21/2010 | Satisfied | TOWLE_M | Enforcement | |||||||
Issue Document | 12/06/2010 | Satisfied | TOWLE_M | Enforcement | |||||||
Phone Conversation | 11/09/2010 | Satisfied | TOWLE_M | Enforcement | |||||||
Record Document | 11/04/2010 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Issue Document | 10/07/2010 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 10/04/2010 | Accepted | TOWLE_M | Enforcement | |||||||
Letter | 06/30/2010 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Letter | 05/12/2010 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Site Inspection | 04/13/2010 | Minor Out of Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Record Document | 12/17/2009 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Letter | 12/08/2009 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Letter | 09/23/2009 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Site Inspection | 02/10/2009 | In Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 12/10/2007 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 10/23/2007 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Letter | 10/18/2007 | Satisfied | HOLLOWAY_RW_1 | Non-Compliance | |||||||
Site Inspection | 10/18/2007 | Major Out of Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/24/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
Site Inspection | 05/04/2006 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/04/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the entry boots within the premium STP sump. Remove the corrosion from the product piping within the regular STP sump. Submit photos of the repairs to the inspector. | |||||||
08/04/2023 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | Remove the remaining product from the kerosene compartment to put the kerosene compartment out of service. | |||||||
08/04/2023 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Pay tank registration fees, print off the current placard, then submit a photo of the placard posted on-site. | |||||||
08/04/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the Autostik JR 2, then submit photos of the operable ATG/printout. | |||||||
08/04/2023 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Investigate and determine if a discharge has occurred regarding the liquid within dispenser sumps 3/4 & 5/6. | |||||||
08/04/2023 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Obtain tank insurance, then submit insurance policy, financial mechanism form (part C or D), and certificate of financial responsibility (part P) to the inspector. | |||||||
08/04/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Conduct integrity testing for all gasoline dispenser sumps (1-6), regular and premium spill buckets, and the premium STP sump, then submit testing results to the inspector. | |||||||
08/04/2023 | 6001 | Minor | 2.1 No reasonable access provided. | Remove the cap, stick the tank to check for liquid, then submit photos of the tank stick to the inspector. | |||||||
08/04/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove the corrosion, then submit photos of the repairs to the inspector. | |||||||
08/04/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove the liquid from dispenser sumps 3/4 & 5/6, and dispose of the liquid properly. Responsible party must determine the source of the liquid and determine if a discharge to the environment has occurred or not. Incident investigation and resolution documentation must be provided. Post liquid removal integrity testing must be provided for dispenser sumps 3/4 & 5/6. Sampling may be required | |||||||
08/04/2023 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Investigate the liquid within dispenser sumps 3/4 & 5/6. | |||||||
08/04/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Conduct monthly visual inspections for the months of August, September and October, then submit the records to the inspector. | |||||||
08/04/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Conduct annual operability testing for the ball float valves, then submit testing to the inspector. | |||||||
08/04/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Conduct annual operability testing for the line leak detectors, then submit the results to the inspector. | |||||||
08/04/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Conduct operability testing for the STP sump and interstitial sensors, or update tank registration to show manual sticking/monthly visual inspections for primary release detection. | |||||||
08/04/2023 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Submit an INF for the liquid within dispenser sumps 3/4 & 5/6. | |||||||
08/04/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove the liquid from the spill buckets. Provide documentation of proper liquid disposal and photos of the dry spill buckets to the inspector. | |||||||
08/04/2023 | 6005 | Minor | 2.4 Registration fees not paid (not receiving fuel). | Pay tank registration fees. | |||||||
10/01/2021 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove liquid from the Regular STP sump and the Kerosene STP sump and provide documentation demonstrating the removal of the liquid. | |||||||
10/01/2021 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove liquid from the Regular STP sump and the Kerosene STP sump and provide documentation demonstrating the removal of the liquid. | |||||||
10/01/2021 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must provide Release Detection test results that demonstrate that the Automatic Tank Gauge (AutoStik Jr. 2) and the interstitial sensors in Tank 1 and Tank 2 are functioning properly and that there is an absence of liquid in the interstitial spaces of each tank. Additionally, the responsible party must ensure that the Automatic Tank Gauge is continuously functioning properly and must print electronic release detection records monthly and review those records monthly to ensure the absence of liquid in the Tank 1 and Tank 2 interstitial spaces. | |||||||
10/01/2021 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must provide Release Detection test results that demonstrate that the Automatic Tank Gauge (AutoStik Jr. 2) and the interstitial sensors in Tank 1 and Tank 2 are functioning properly and that there is an absence of liquid in the interstitial spaces of each tank. Additionally, the responsible party must ensure that the Automatic Tank Gauge is continuously functioning properly and must print electronic release detection records monthly and review those records monthly to ensure the absence of liquid in the Tank 1 and Tank 2 interstitial spaces. | |||||||
10/01/2021 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must provide Release Detection test results that demonstrate that the Automatic Tank Gauge (AutoStik Jr. 2) and the interstitial sensors in Tank 1 and Tank 2 are functioning properly and that there is an absence of liquid in the interstitial spaces of each tank. Additionally, the responsible party must ensure that the Automatic Tank Gauge is continuously functioning properly and must print electronic release detection records monthly and review those records monthly to ensure the absence of liquid in the Tank 1 and Tank 2 interstitial spaces. | |||||||
10/01/2021 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove liquid from the Regular STP sump and the Kerosene STP sump and provide documentation demonstrating the removal of the liquid. | |||||||
10/01/2021 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove liquid from the Regular STP sump and the Kerosene STP sump and provide documentation demonstrating the removal of the liquid. | |||||||
09/28/2021 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove all liquid from Dispenser Sumps 3/4 and 5/6 and dispose of the liquid properly and provide documentation of that liquid removal. Entry boots and/or bowed out/damaged sump containers in Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be repaired or replaced and documentation of work completed must be provided. The gap between Dispenser 1/2 and its sump must be eliminated and documentation of work completed must be provided. Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be integrity tested and documentation must be provided. | |||||||
09/28/2021 | 6001 | Minor | 2.1 No reasonable access provided. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must provide Release Detection test results that demonstrate that the Automatic Tank Gauge (AutoStik Jr. 2) and the interstitial sensors in Tank 1 and Tank 2 are functioning properly and that there is an absence of liquid in the interstitial spaces of each tank. Additionally, the responsible party must ensure that the Automatic Tank Gauge is continuously functioning properly and must print electronic release detection records monthly and review those records monthly to ensure the absence of liquid in the Tank 1 and Tank 2 interstitial spaces. | |||||||
09/28/2021 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove all liquid from Dispenser Sumps 3/4 and 5/6 and dispose of the liquid properly and provide documentation of that liquid removal. Entry boots and/or bowed out/damaged sump containers in Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be repaired or replaced and documentation of work completed must be provided. The gap between Dispenser 1/2 and its sump must be eliminated and documentation of work completed must be provided. Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be integrity tested and documentation must be provided. | |||||||
09/28/2021 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove all liquid from Dispenser Sumps 3/4 and 5/6 and dispose of the liquid properly and provide documentation of that liquid removal. Entry boots and/or bowed out/damaged sump containers in Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be repaired or replaced and documentation of work completed must be provided. The gap between Dispenser 1/2 and its sump must be eliminated and documentation of work completed must be provided. Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be integrity tested and documentation must be provided. | |||||||
09/28/2021 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Conduct integrity testing for Regular, Premium, and Kerosene STP and Dispenser Sumps and provide testing documentation. Note: If Kerosene fuel is no longer being dispensed at this facility, to be able to cease having to conduct future integirty testing of the Kerosene STP and Dispenser Sumps, proper documentation needs to be provided that demonstrates that the Kerosene compartment of Tank 2 is empty and the Kerosene fill port is locked to prevent it from being able to be filled. | |||||||
09/28/2021 | 6038 | SNC-B | 4.9 Shear valve not installed properly. | Responsible party must perform repairs to the shear valve anchoring systems in all Dispenser Sumps (1/2, 3/4, 5/6) and provide documentation of repairs. Provide documentation that proves all of the Dispenser's shear valves are anchored properly. | |||||||
09/28/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Responsible party must investigate issues and submit an Incident Notification Form. Responsible party must remove all liquid from Dispenser Sumps 3/4 and 5/6 and dispose of the liquid properly and provide documentation of that liquid removal. Entry boots and/or bowed out/damaged sump containers in Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be repaired or replaced and documentation of work completed must be provided. The gap between Dispenser 1/2 and its sump must be eliminated and documentation of work completed must be provided. Dispenser Sumps 1/2, 3/4, 5/6 and the Kerosene Dispenser Sump must be integrity tested and documentation must be provided. | |||||||
05/17/2021 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Financial responsibility shall be maintained and demonstrated to the county or Department for all storage tank systems until the storage tank systems are properly closed pursuant to subsections 62-761.800(2) and (3), F.A.C., and the Closure Report or the Limited Closure Report Form for USTs 62-761.900(8), effective date, January 2017, hereby adopted and incorporated by reference, is submitted to and approved by the county or the Department. Pursuant to Section 376.309(1), F.S., the facility owner is required to establish and maintain evidence of financial responsibility and is liable in event of noncompliance. If the facility owner, facility operator, tank owner, and tank operator are separate persons, then evidence of financial responsibility may be demonstrated if one of those persons obtains financial responsibility on behalf of the facility owner. | |||||||
05/17/2021 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | An operational or structural problem that could potentially result in a release or discharge, or lead to the presence of groundwater or surface water in the interstice of a double-walled storage tank or integral piping. Have the dispenser liners repaired and send a picture to the EQD inspector. | |||||||
05/17/2021 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | Visual inspections. At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually shall be visually inspected and documented as to its condition pursuant to Rule 62-761.710, F.A.C. | |||||||
05/17/2021 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Annual operability testing of release detection systems. All release detection devices shall be tested annually at intervals not exceeding 12 months to ensure proper operation. The test must either simulate an actual alarm condition or shall be conducted according to manufacturers specifications, and shall include, at a minimum, a determination of whether the device operates as designed. Conduct annual operability testing for release detection and send results to EQD inspector. | |||||||
03/21/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | In order to correct this violation, the dispensers must be hydro-tested and the Sumps should be re-tested. Documentation of the testing must be sent to the inspector for review. | |||||||
03/21/2019 | 4077 | Minor | 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. | In order to correct this violation, the liquid should be removed and properly managed, and documentation must be sent to the inspector for review. | |||||||
03/21/2019 | 4058 | SNC-A | 4.4 Storage tank systems not provided with a release detection method to detect a new release from any portion of the system, including interstitial spaces. This violation may lead to Placard Revocation and Delivery Prohibition. | In order to correct this violation, the ATG must maintain operation for continuous electronic monitoring. | |||||||
03/21/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | In order to correct this violation, the Financial Responsibility documentation for 2018-2019 must be sent to the inspector for review. | |||||||
03/21/2019 | 4081 | Minor | 2.9 Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility not kept. | In order to correct this violation, appropriate Operator Training Certificates must be attained by the facility, and documentation must be sent to the inspector for review. | |||||||
03/21/2019 | 4079 | Minor | 2.7 Records requiring 3 years documentation period not kept by facility. | In order to correct this violation, 3 years' worth records must be maintained and provided for review during an inspection. | |||||||
03/21/2019 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | In order to correct this violation, monthly inspection records must be done every month not to exceed 35 days and consistently monitored for electronic monitoring. Documentation for any previous monthlies and for current monthly monitoring must be sent to the inspector for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/17/2019 | INACTIVE | ||||||||||