DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Bulk Storage Facility
 
County Putnam   Status    CLOSED
 
ID 9801954   Latitude    29° 38' 46.6374
 
Name FLGAS LLC
174 S HWY 17
Longitude    81° 36' 18.4087
  EAST PALATKA, FL 32131-99 LL Method    DPHO
 
Contact JOHN CRAM   LL Status    REVIEWED
 
Phone (503) 970-0782   Status Date    12/31/2014
 
Account Owner Information
 
Name FRANCIS EARL EVERETT
174 S HWY 17
EAST PALATKA, FL 32131
Effective Date    06/23/2017
 
Contact FRANCIS EARL EVERETT
 
Phone (904) 325-3165
 
Email NORTHFLORIDATRACTOR@GMAIL.COM
  Placard # / Date    620519 - 10/14/2021
Property Owner Information
 
Name FRANCIS EARL EVERETT
174 S HWY 17
EAST PALATKA, FL 32131
Effective Date    06/23/2017
 
Contact FRANCIS EARL EVERETT
 
Phone (904) 325-3165
 
Email NORTHFLORIDATRACTOR@GMAIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 20000 Vehicular Diesel (D) 09/01/1999 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(L) Bulk product system
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(E) Monitor UST/liner space
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
10 1600 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
11 6000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
12 6000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
13 1600 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
14 6000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
15 1600 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
16 6000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
17 1400 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
18 4000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
2 20000 Unleaded Gas (B) 09/01/1999 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(L) Bulk product system
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(E) Monitor UST/liner space
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
3 20000 Vehicular Diesel (D) 09/01/1999 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(L) Bulk product system
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 20000 Unleaded Gas (B) 09/01/1999 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(L) Bulk product system
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(E) Monitor UST/liner space
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 4000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(A) Site Suitability Plan
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6 1400 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
7 4000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
8 1600 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
9 6000 New/Lube Oil (O) 02/01/2000 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(K) AST containment
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
(Z) DEP approved tank material
  (A) Abv, no soil contact
(C) Fiberglass
(F) Double wall
(I) Suction piping system
(J) Pressurized piping system
(L) Bulk product system
(N) Approved synthetic material
(E) Monitor UST/liner space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
EXEMPT-NOT REQUIRED  
NONE  
NONE  
INSURANCE   02/16/2018 02/16/2019 ACE AMERICAN INSURANCE COMPANY
INSURANCE   05/28/2005 05/28/2006 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCR 03/01/2006 03/01/2006 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
 Completion Notes ALT.PROCEDURE FOR VAC. GAUGES BEING USED PENDING APPROVAL.
 
RRBD 02/09/2006 02/10/2006 FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
 Completion Notes ALTERNATE PROCEDURE FORM RECEIVED FOR VACUUM GAUGES 2/09/06
 
TCI 01/18/2006 01/19/2006 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
 Completion Notes ALTERNATE PROCEDURE FORM NEEDS TO BE COMPLETED FOR VACUUM GAUGES.
 
TCI 12/20/2004 12/21/2004 IN-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCR 11/17/2003 11/18/2003 IN-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
 Completion Notes TANKS HAVE VAC. GAUGES WITH ANNUAL OPERABILITY DOCUMENTATION.PIPING IS D.WALL WITH OPEN TEST BOOT VALVES. NO BREACH OF INTEGRITY TEST REQUIRED.
 
TCI 10/14/2003 10/15/2003 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCI 10/29/2002 10/30/2002 IN-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCR 12/20/2001 12/20/2001 IN-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCI 11/20/2001 11/20/2001 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TIN 02/15/2001 02/15/2001 IN-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
RRBD 02/14/2001 02/14/2001 FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCR 01/25/2001 01/26/2001 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TCI 11/30/2000 11/30/2000 SIGNIFICANT OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
TIN 05/26/2000 06/07/2000 MINOR OUT-OF-COMPLIANCE FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
SV 10/11/1999 10/11/1999 FLOWERS_D 14/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Phone Conversation 05/08/2025 Satisfied JACKSON_SM Enforcement
 
Electronic Communication 05/08/2025 Satisfied JACKSON_SM Enforcement
 
Enforcement Referral 05/03/2024 Accepted HARRINGTON_RD_1 Enforcement
 
Electronic Communication 06/20/2023 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 06/20/2023 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 06/06/2023 Satisfied SACCHITELLO_E Enforcement
 
Enforcement Tracking 06/06/2023 Closed Without Enforcement SACCHITELLO_E Enforcement
 
Record Document 03/26/2023 Satisfied HARRINGTON_RD_1 Discharge
 
Electronic Communication 03/26/2023 Satisfied HARRINGTON_RD_1 Discharge
 
Record Document 03/26/2023 Satisfied HARRINGTON_RD_1 Closure
 
Letter 01/13/2023 Satisfied RAMSEY_TH_1 Closure
 
TCAR 01/13/2023 Satisfied RAMSEY_TH_1 Closure
 
Electronic Communication 01/13/2023 Satisfied RAMSEY_TH_1 Closure
 
Electronic Communication 01/01/2023 Satisfied HARRINGTON_RD_1 Closure
 
Site Inspection 11/20/2022 Major Out of Compliance HARRINGTON_RD_1 0/4 Closure
 
Letter 04/24/2022 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Issue Document 04/24/2022 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 03/31/2022 Major Out of Compliance HARRINGTON_RD_1 0/4 Routine Compliance
 
Issue Document 03/27/2022 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Meeting 03/27/2022 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Phone Conversation 01/05/2022 Satisfied HARRIS_SB Enforcement
 
Letter 01/05/2022 Satisfied HARRIS_SB Enforcement
 
Enforcement Referral 05/18/2020 Accepted HARRINGTON_RD_1 Enforcement
 
Electronic Communication 05/17/2020 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Letter 08/18/2019 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Electronic Communication 08/18/2019 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 08/18/2019 Major Out of Compliance HARRINGTON_RD_1 0/4 Routine Compliance
 
Enforcement Referral 02/28/2018 Accepted HARRIS_MJ Enforcement
 
Enforcement Tracking 02/28/2018 Closed Without Enforcement HARRIS_MJ Enforcement
 
Letter 02/28/2018 Satisfied OLIVA_L Enforcement
 
Enforcement Tracking 02/28/2018 Closed Without Enforcement HARRIS_MJ Enforcement
 
Enforcement Referral 01/08/2018 Accepted HARRINGTON_RD_1 Enforcement
 
Letter 09/15/2017 Satisfied HARRINGTON_RD_1 Compliance Assistance
 
Site Inspection 08/30/2017 Major Out of Compliance HARRINGTON_RD_1 0/4 Routine Compliance
 
Site Inspection 08/24/2015 In Compliance HARRINGTON_RD_1 0/4 Routine Compliance
 
Electronic Communication 08/24/2015 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Record Document 08/13/2014 Satisfied HARRINGTON_RD_1 Closure
 
Site Inspection 04/04/2014 In Compliance HARRINGTON_RD_1 14/0 Closure
 
Electronic Communication 03/25/2014 Satisfied HARRINGTON_RD_1 Routine Compliance
 
Site Inspection 03/25/2014 In Compliance HARRINGTON_RD_1 14/4 Routine Compliance
 
Site Inspection 06/02/2011 In Compliance HARRINGTON_RD_1 14/4 Routine Compliance
 
Enforcement Tracking 02/18/2011 Closed With Enforcement DEFALCO_L Enforcement
 
Record Document 07/12/2010 Satisfied HARRINGTON_RD_1 Non-Compliance
 
Letter 01/27/2010 Minor Out of Compliance BARNETT_PC_1 Non-Compliance
 
Record Document 01/27/2010 Minor Out of Compliance BARNETT_PC_1 Non-Compliance
 
Site Inspection 12/23/2009 Major Out of Compliance BARNETT_PC_1 14/4 Routine Compliance
 
Enforcement Referral 02/21/2008 Accepted DEFALCO_L Enforcement
 
Emergency Preparedness Information 05/24/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Emergency Preparedness Information 02/16/2007 Satisfied BARNETT_PC_1 Routine Compliance
 
Record Document 02/16/2007 Satisfied FLOWERS_D Non-Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
03/26/2023 6010 SNC-B 4.5 Discharge Notification Form (DRF) not received in a timely manner. Submit DRF to Alachua County Environmental Protection Department. Form has been provided to the facility.
 
 
 
No Discharges Found