![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Bulk Storage Facility | ||||||||
County | Putnam | Status | CLOSED | ||||||||
ID | 9801954 | Latitude | 29° 38' 46.6374 | ||||||||
Name |
FLGAS LLC 174 S HWY 17 |
Longitude | 81° 36' 18.4087 | ||||||||
EAST PALATKA, FL 32131-99 | LL Method | DPHO | |||||||||
Contact | JOHN CRAM | LL Status | REVIEWED | ||||||||
Phone | (503) 970-0782 | Status Date | 12/31/2014 | ||||||||
Account Owner Information | |||||||||||
Name | FRANCIS EARL EVERETT 174 S HWY 17 EAST PALATKA, FL 32131 |
Effective Date | 06/23/2017 | ||||||||
Contact | FRANCIS EARL EVERETT | ||||||||||
Phone | (904) 325-3165 | ||||||||||
NORTHFLORIDATRACTOR@GMAIL.COM | |||||||||||
Placard # / Date | 620519 - 10/14/2021 | ||||||||||
Property Owner Information | |||||||||||
Name | FRANCIS EARL EVERETT 174 S HWY 17 EAST PALATKA, FL 32131 |
Effective Date | 06/23/2017 | ||||||||
Contact | FRANCIS EARL EVERETT | ||||||||||
Phone | (904) 325-3165 | ||||||||||
NORTHFLORIDATRACTOR@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Vehicular Diesel (D) | 09/01/1999 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 1600 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 6000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 6000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 1600 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
14 | 6000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
15 | 1600 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
16 | 6000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
17 | 1400 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
18 | 4000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Unleaded Gas (B) | 09/01/1999 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 20000 | Vehicular Diesel (D) | 09/01/1999 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (J) Pressurized piping system (L) Bulk product system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 09/01/1999 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(A) Site Suitability Plan (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1400 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 4000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 1600 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 6000 | New/Lube Oil (O) | 02/01/2000 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (K) AST containment (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (Z) DEP approved tank material |
(A) Abv, no soil contact (C) Fiberglass (F) Double wall (I) Suction piping system (J) Pressurized piping system (L) Bulk product system (N) Approved synthetic material |
(E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-NOT REQUIRED | |||||||||||
NONE | |||||||||||
NONE | |||||||||||
INSURANCE | 02/16/2018 | 02/16/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/28/2005 | 05/28/2006 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 03/01/2006 | 03/01/2006 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes ALT.PROCEDURE FOR VAC. GAUGES BEING USED PENDING APPROVAL. | |||||||||||
RRBD | 02/09/2006 | 02/10/2006 | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ALTERNATE PROCEDURE FORM RECEIVED FOR VACUUM GAUGES 2/09/06 | |||||||||||
TCI | 01/18/2006 | 01/19/2006 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes ALTERNATE PROCEDURE FORM NEEDS TO BE COMPLETED FOR VACUUM GAUGES. | |||||||||||
TCI | 12/20/2004 | 12/21/2004 | IN-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TCR | 11/17/2003 | 11/18/2003 | IN-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes TANKS HAVE VAC. GAUGES WITH ANNUAL OPERABILITY DOCUMENTATION.PIPING IS D.WALL WITH OPEN TEST BOOT VALVES. NO BREACH OF INTEGRITY TEST REQUIRED. | |||||||||||
TCI | 10/14/2003 | 10/15/2003 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TCI | 10/29/2002 | 10/30/2002 | IN-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TCR | 12/20/2001 | 12/20/2001 | IN-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TCI | 11/20/2001 | 11/20/2001 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TIN | 02/15/2001 | 02/15/2001 | IN-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/14/2001 | 02/14/2001 | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 01/25/2001 | 01/26/2001 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TCI | 11/30/2000 | 11/30/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
TIN | 05/26/2000 | 06/07/2000 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | |||||
SV | 10/11/1999 | 10/11/1999 | FLOWERS_D | 14/4 | COMPLIANCE ASSURANCE | ||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Phone Conversation | 05/08/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Electronic Communication | 05/08/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 05/03/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 06/20/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 06/20/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 06/06/2023 | Satisfied | SACCHITELLO_E | Enforcement | |||||||
Enforcement Tracking | 06/06/2023 | Closed Without Enforcement | SACCHITELLO_E | Enforcement | |||||||
Record Document | 03/26/2023 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Electronic Communication | 03/26/2023 | Satisfied | HARRINGTON_RD_1 | Discharge | |||||||
Record Document | 03/26/2023 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Letter | 01/13/2023 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
TCAR | 01/13/2023 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Electronic Communication | 01/13/2023 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Electronic Communication | 01/01/2023 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Site Inspection | 11/20/2022 | Major Out of Compliance | HARRINGTON_RD_1 | 0/4 | Closure | ||||||
Letter | 04/24/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Issue Document | 04/24/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/31/2022 | Major Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Issue Document | 03/27/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Meeting | 03/27/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Phone Conversation | 01/05/2022 | Satisfied | HARRIS_SB | Enforcement | |||||||
Letter | 01/05/2022 | Satisfied | HARRIS_SB | Enforcement | |||||||
Enforcement Referral | 05/18/2020 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 05/17/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 08/18/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 08/18/2019 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 08/18/2019 | Major Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Enforcement Referral | 02/28/2018 | Accepted | HARRIS_MJ | Enforcement | |||||||
Enforcement Tracking | 02/28/2018 | Closed Without Enforcement | HARRIS_MJ | Enforcement | |||||||
Letter | 02/28/2018 | Satisfied | OLIVA_L | Enforcement | |||||||
Enforcement Tracking | 02/28/2018 | Closed Without Enforcement | HARRIS_MJ | Enforcement | |||||||
Enforcement Referral | 01/08/2018 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 09/15/2017 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 08/30/2017 | Major Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 08/24/2015 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 08/24/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 08/13/2014 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Site Inspection | 04/04/2014 | In Compliance | HARRINGTON_RD_1 | 14/0 | Closure | ||||||
Electronic Communication | 03/25/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 03/25/2014 | In Compliance | HARRINGTON_RD_1 | 14/4 | Routine Compliance | ||||||
Site Inspection | 06/02/2011 | In Compliance | HARRINGTON_RD_1 | 14/4 | Routine Compliance | ||||||
Enforcement Tracking | 02/18/2011 | Closed With Enforcement | DEFALCO_L | Enforcement | |||||||
Record Document | 07/12/2010 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 01/27/2010 | Minor Out of Compliance | BARNETT_PC_1 | Non-Compliance | |||||||
Record Document | 01/27/2010 | Minor Out of Compliance | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 12/23/2009 | Major Out of Compliance | BARNETT_PC_1 | 14/4 | Routine Compliance | ||||||
Enforcement Referral | 02/21/2008 | Accepted | DEFALCO_L | Enforcement | |||||||
Emergency Preparedness Information | 05/24/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Record Document | 02/16/2007 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/26/2023 | 6010 | SNC-B | 4.5 Discharge Notification Form (DRF) not received in a timely manner. | Submit DRF to Alachua County Environmental Protection Department. Form has been provided to the facility. | |||||||
No Discharges Found |