![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9802341 | Latitude | 27° 50' 21.1863 | ||||||||
Name |
REBEL #816 10544 PARK BLVD |
Longitude | 82° 47' .5335 | ||||||||
SEMINOLE, FL 33772-5436 | LL Method | DGPS | |||||||||
Contact | CLIFF LINDSEY | LL Status | REVIEWED | ||||||||
Phone | (954) 812-9398 | Status Date | 11/17/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FUTURE ENERGY FLORIDA INC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/11/2021 | ||||||||
Contact | CHITTAL SHAH / CHRIS DEVELLEREZ 909-394-4728 | ||||||||||
Phone | (951) 313-7490 | ||||||||||
LICENSING@CARENTERPRISES.NET | |||||||||||
Placard # / Date | 700006 - 07/23/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ANABI REAL ESTATE DEVELOPMENT LLC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/11/2021 | ||||||||
Contact | SUMMER IREIFEJ / RAWA ANABI | ||||||||||
Phone | (909) 394-4728 | ||||||||||
SIREIFEJ@CARENTERPRISES.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 11/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 11/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 11/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 11/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2022 | 05/14/2023 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2021 | 05/14/2022 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
SURETY BOND | 01/01/2021 | 12/31/2021 | |||||||||
SURETY BOND | 01/01/2020 | 12/31/2020 | |||||||||
SURETY BOND | 01/01/2019 | 12/31/2019 | LIBERTY MUTUAL | ||||||||
SURETY BOND | 01/01/2018 | 12/31/2018 | |||||||||
SURETY BOND | 01/01/2017 | 12/31/2017 | |||||||||
SURETY BOND | 11/01/2015 | 12/31/2016 | TRAVELERS | ||||||||
SURETY BOND | 01/01/2015 | 12/31/2015 | TRAVELERS | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2014 | 04/30/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2013 | 04/29/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/20/2012 | 04/19/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2011 | 04/29/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2008 | 04/29/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 05/20/2005 | 05/20/2005 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LETTER SENT STATING THAT CLOSURE DOCUMENTS WOULD BE ACCEPTED AS SUBMITTED | |||||||||||
LTR | 05/20/2005 | 05/20/2005 | SOWERS | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes LETTER SENT RESOLVING INF BASED ON SUBMITTED CLOSURE DOCUMENTS | |||||||||||
RRBD | 05/11/2005 | 05/20/2005 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSURE REPORT DOCUMENTS SUBMITTED FOR SPILL BUCKET REPLACEMENT | |||||||||||
LTR | 03/28/2005 | 03/31/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 03/28/2005 | 03/31/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 03/16/2005 | 03/31/2005 | IN-COMPLIANCE | FRAZIER | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALL OF 4 SPILL CONTAINMENT UNITS | |||||||||||
TXI | 03/16/2005 | 03/31/2005 | IN-COMPLIANCE | FRAZIER | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOVAL OF 4 SPILL CONTAINMENT UNITS | |||||||||||
LTR | 12/27/2004 | 01/02/2005 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/30/2004 | 01/02/2005 | IN-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/14/2004 | 07/11/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CROMPCO REPORT DATED 05/14/04 - ATG CERTIFICATION | |||||||||||
RRBD | 05/24/2004 | 06/01/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CROMPCO DATED 04/26/04: LINE TESTS AND LLD TESTS | |||||||||||
LTR | 03/30/2004 | 04/05/2004 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/30/2004 | 04/05/2004 | IN-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW FRP PIPE | |||||||||||
LTR | 06/06/2003 | 06/09/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/27/2003 | 06/09/2003 | IN-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes AMERON DW; BRAVO BOXES | |||||||||||
TCI | 10/03/2001 | 10/08/2001 | IN-COMPLIANCE | TAM | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/30/2001 | 04/02/2001 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/17/2000 | 08/06/2000 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 05/01/2000 | 05/01/2000 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 04/19/2000 | 04/24/2000 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 08/27/2024 | Satisfied | WIMBERLY_E | Enforcement | |||||||
Enforcement Referral | 07/26/2024 | Accepted | PUHR_NM_1 | Enforcement | |||||||
Site Inspection | 01/19/2024 | Major Out of Compliance | PUHR_NM_1 | 0/4 | Routine Compliance | ||||||
Letter | 01/19/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Electronic Communication | 10/05/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 10/05/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 10/05/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 06/21/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 06/21/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 05/23/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/23/2022 | Major Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 04/28/2022 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 09/17/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 09/17/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 05/29/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/29/2019 | Minor Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 05/01/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Record Document | 06/05/2017 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 12/30/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 12/30/2016 | Major Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 12/07/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 02/02/2015 | In Compliance | COLSON_NJ_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 01/23/2015 | Minor Out of Compliance | COLSON_NJ_1 | 0/2 | Non-Compliance | ||||||
Letter | 01/23/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Record Document | 09/18/2014 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 09/17/2014 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 08/13/2014 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 08/13/2014 | Major Out of Compliance | COLSON_NJ_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/12/2014 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Electronic Communication | 02/25/2013 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Letter | 07/13/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/13/2012 | Minor Out of Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 06/27/2011 | In Compliance | STRAUSS_RH_1 | 0/4 | Installation | ||||||
Site Inspection | 06/27/2011 | In Compliance | STRAUSS_RH_1 | 0/4 | Closure | ||||||
Site Inspection | 06/10/2011 | Minor Out of Compliance | STRAUSS_RH_1 | 0/4 | Non-Compliance | ||||||
Letter | 06/10/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 06/10/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/02/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 04/26/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 04/26/2011 | Minor Out of Compliance | STRAUSS_RH_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 05/27/2010 | Minor Out of Compliance | SOWERS_JA_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/27/2010 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 04/23/2009 | In Compliance | LONGEN_JL_1 | 0/4 | Routine Compliance | ||||||
Record Document | 04/23/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 02/21/2008 | Major Out of Compliance | SOWERS_JA_1 | 0/4 | Routine Compliance | ||||||
Letter | 02/21/2008 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/13/2008 | Satisfied | SOWERS_JA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Letter | 01/10/2007 | Satisfied | SOWERS_JA_1 | Non-Compliance | |||||||
Site Inspection | 01/10/2007 | Minor Out of Compliance | SOWERS_JA_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 08/30/2006 | Satisfied | FRAZIER_LA | Non-Compliance | |||||||
Site Inspection | 05/23/2006 | Major Out of Compliance | FRAZIER_LA | 0/4 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/17/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | *Submit documentation of repair and conduct integrity testing of the Diesel STP Sump, PUL STP Sump, Dispenser 5/6 liner, and Dispenser 7/8 liner, and submit results to this office for review once completed.* Be sure to follow up on all failed testing and to conduct integrity testing of all double-walled spill containment systems every 36 months. | |||||||
01/12/2024 | 6060 | SNC-B | 4.11 Release detection methods do not meet monitoring requirements. | *Test the PUL STP sump senor to ensure it is operating correctly and submit passing test results to this office for review when completed. Properly document EZ Gauge testing and submit passing results to this office for review when completed.* | |||||||
No Discharges Found |