DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Pinellas   Status    OPEN
 
ID 9802341   Latitude    27° 50' 21.1863
 
Name REBEL #816
10544 PARK BLVD
Longitude    82° 47' .5335
  SEMINOLE, FL 33772-5436 LL Method    DGPS
 
Contact CLIFF LINDSEY   LL Status    REVIEWED
 
Phone (954) 812-9398   Status Date    11/17/2003
 
Account Owner Information
 
Name FUTURE ENERGY FLORIDA INC
1450 N BENSON AVE, UN#A
UPLAND, CA 91786
Effective Date    08/11/2021
 
Contact CHITTAL SHAH / CHRIS DEVELLEREZ 909-394-4728
 
Phone (951) 313-7490
 
Email LICENSING@CARENTERPRISES.NET
  Placard # / Date    700006 - 07/23/2024
Property Owner Information
 
Name ANABI REAL ESTATE DEVELOPMENT LLC
1450 N BENSON AVE, UN#A
UPLAND, CA 91786
Effective Date    08/11/2021
 
Contact SUMMER IREIFEJ / RAWA ANABI
 
Phone (909) 394-4728
 
Email SIREIFEJ@CARENTERPRISES.NET
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Unleaded Gas (B) 11/01/1999 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Unleaded Gas (B) 11/01/1999 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 11/01/1999 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Vehicular Diesel (D) 11/01/1999 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   05/14/2023 05/14/2024 IRONSHORE SPECIALTY INSURANCE COMPANY
INSURANCE   05/14/2022 05/14/2023 IRONSHORE SPECIALTY INSURANCE COMPANY
INSURANCE   05/14/2021 05/14/2022 IRONSHORE SPECIALTY INSURANCE CO
SURETY BOND   01/01/2021 12/31/2021
SURETY BOND   01/01/2020 12/31/2020
SURETY BOND   01/01/2019 12/31/2019 LIBERTY MUTUAL
SURETY BOND   01/01/2018 12/31/2018
SURETY BOND   01/01/2017 12/31/2017
SURETY BOND   11/01/2015 12/31/2016 TRAVELERS
SURETY BOND   01/01/2015 12/31/2015 TRAVELERS
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2014 04/30/2015
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2013 04/29/2014
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/20/2012 04/19/2013
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2011 04/29/2012
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/29/2010 04/30/2011
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   04/30/2008 04/29/2009
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
LTR 05/20/2005 05/20/2005 SOWERS 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes LETTER SENT STATING THAT CLOSURE DOCUMENTS WOULD BE ACCEPTED AS SUBMITTED
 
LTR 05/20/2005 05/20/2005 SOWERS 0/0 DISCHARGE PROJECT
 
 Completion Notes LETTER SENT RESOLVING INF BASED ON SUBMITTED CLOSURE DOCUMENTS
 
RRBD 05/11/2005 05/20/2005 SOWERS 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CLOSURE REPORT DOCUMENTS SUBMITTED FOR SPILL BUCKET REPLACEMENT
 
LTR 03/28/2005 03/31/2005 FRAZIER 0/0 COMPLIANCE ASSURANCE
 
LTR 03/28/2005 03/31/2005 FRAZIER 0/0 COMPLIANCE ASSURANCE
 
TIN 03/16/2005 03/31/2005 IN-COMPLIANCE FRAZIER 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALL OF 4 SPILL CONTAINMENT UNITS
 
TXI 03/16/2005 03/31/2005 IN-COMPLIANCE FRAZIER 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes REMOVAL OF 4 SPILL CONTAINMENT UNITS
 
LTR 12/27/2004 01/02/2005 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TCI 11/30/2004 01/02/2005 IN-COMPLIANCE ROGGELIN 0/4 COMPLIANCE ASSURANCE
 
RRBD 06/14/2004 07/11/2004 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CROMPCO REPORT DATED 05/14/04 - ATG CERTIFICATION
 
RRBD 05/24/2004 06/01/2004 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CROMPCO DATED 04/26/04: LINE TESTS AND LLD TESTS
 
LTR 03/30/2004 04/05/2004 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TCI 03/30/2004 04/05/2004 IN-COMPLIANCE ROGGELIN 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes AMERON DW FRP PIPE
 
LTR 06/06/2003 06/09/2003 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TCI 05/27/2003 06/09/2003 IN-COMPLIANCE ROGGELIN 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes AMERON DW; BRAVO BOXES
 
TCI 10/03/2001 10/08/2001 IN-COMPLIANCE TAM 0/4 COMPLIANCE ASSURANCE
 
TCI 03/30/2001 04/02/2001 MINOR OUT-OF-COMPLIANCE ROGGELIN 0/4 COMPLIANCE ASSURANCE
 
RRBD 07/17/2000 08/06/2000 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
RRBD 05/01/2000 05/01/2000 ROGGELIN 0/0 COMPLIANCE ASSURANCE
 
TIN 04/19/2000 04/24/2000 MINOR OUT-OF-COMPLIANCE ROGGELIN 0/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 08/27/2024 Satisfied WIMBERLY_E Enforcement
 
Enforcement Referral 07/26/2024 Accepted PUHR_NM_1 Enforcement
 
Site Inspection 01/19/2024 Major Out of Compliance PUHR_NM_1 0/4 Routine Compliance
 
Letter 01/19/2024 Satisfied PUHR_NM_1 Compliance Assistance
 
Electronic Communication 10/05/2023 Satisfied JUARISTIC_GK_1 Compliance Assistance
 
Record Document 10/05/2023 Satisfied JUARISTIC_GK_1 Compliance Assistance
 
Letter 10/05/2023 Satisfied JUARISTIC_GK_1 Compliance Assistance
 
Record Document 06/21/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 06/21/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Letter 05/23/2022 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 05/23/2022 Major Out of Compliance COLSON_NJ_1 0/4 Routine Compliance
 
Electronic Communication 04/28/2022 Satisfied COLSON_NJ_1 Routine Compliance
 
Letter 09/17/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Record Document 09/17/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Letter 05/29/2019 Satisfied COLSON_NJ_1 Compliance Assistance
 
Site Inspection 05/29/2019 Minor Out of Compliance COLSON_NJ_1 0/4 Routine Compliance
 
Electronic Communication 05/01/2019 Satisfied COLSON_NJ_1 Routine Compliance
 
Record Document 06/05/2017 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 12/30/2016 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 12/30/2016 Major Out of Compliance COLSON_NJ_1 0/4 Routine Compliance
 
Electronic Communication 12/07/2016 Satisfied COLSON_NJ_1 Routine Compliance
 
Site Inspection 02/02/2015 In Compliance COLSON_NJ_1 0/2 Non-Compliance
 
Site Inspection 01/23/2015 Minor Out of Compliance COLSON_NJ_1 0/2 Non-Compliance
 
Letter 01/23/2015 Satisfied COLSON_NJ_1 Non-Compliance
 
Record Document 09/18/2014 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 09/17/2014 Satisfied COLSON_NJ_1 Non-Compliance
 
Letter 08/13/2014 Satisfied COLSON_NJ_1 Non-Compliance
 
Site Inspection 08/13/2014 Major Out of Compliance COLSON_NJ_1 0/4 Routine Compliance
 
Emergency Preparedness Information 08/12/2014 Satisfied COLSON_NJ_1 Routine Compliance
 
Electronic Communication 02/25/2013 Satisfied SOWERS_JA_1 Non-Compliance
 
Letter 07/13/2012 Satisfied LONGEN_JL_1 Non-Compliance
 
Site Inspection 07/13/2012 Minor Out of Compliance LONGEN_JL_1 0/4 Routine Compliance
 
Site Inspection 06/27/2011 In Compliance STRAUSS_RH_1 0/4 Installation
 
Site Inspection 06/27/2011 In Compliance STRAUSS_RH_1 0/4 Closure
 
Site Inspection 06/10/2011 Minor Out of Compliance STRAUSS_RH_1 0/4 Non-Compliance
 
Letter 06/10/2011 Satisfied STRAUSS_RH_1 Non-Compliance
 
Record Document 06/10/2011 Satisfied STRAUSS_RH_1 Non-Compliance
 
Emergency Preparedness Information 05/02/2011 Satisfied STRAUSS_RH_1 Routine Compliance
 
Letter 04/26/2011 Satisfied STRAUSS_RH_1 Non-Compliance
 
Site Inspection 04/26/2011 Minor Out of Compliance STRAUSS_RH_1 0/4 Routine Compliance
 
Site Inspection 05/27/2010 Minor Out of Compliance SOWERS_JA_1 0/4 Routine Compliance
 
Letter 05/27/2010 Satisfied SOWERS_JA_1 Non-Compliance
 
Site Inspection 04/23/2009 In Compliance LONGEN_JL_1 0/4 Routine Compliance
 
Record Document 04/23/2008 Satisfied SOWERS_JA_1 Non-Compliance
 
Site Inspection 02/21/2008 Major Out of Compliance SOWERS_JA_1 0/4 Routine Compliance
 
Letter 02/21/2008 Satisfied SOWERS_JA_1 Non-Compliance
 
Emergency Preparedness Information 02/13/2008 Satisfied SOWERS_JA_1 Routine Compliance
 
Emergency Preparedness Information 02/05/2007 Satisfied LONGEN_JL_1 Routine Compliance
 
Letter 01/10/2007 Satisfied SOWERS_JA_1 Non-Compliance
 
Site Inspection 01/10/2007 Minor Out of Compliance SOWERS_JA_1 0/4 Routine Compliance
 
Emergency Preparedness Information 09/22/2006 Satisfied STRAUSS_RH_1 Routine Compliance
 
Letter 08/30/2006 Satisfied FRAZIER_LA Non-Compliance
 
Site Inspection 05/23/2006 Major Out of Compliance FRAZIER_LA 0/4 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/17/2024 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. *Submit documentation of repair and conduct integrity testing of the Diesel STP Sump, PUL STP Sump, Dispenser 5/6 liner, and Dispenser 7/8 liner, and submit results to this office for review once completed.* Be sure to follow up on all failed testing and to conduct integrity testing of all double-walled spill containment systems every 36 months.
 
01/12/2024 6060 SNC-B 4.11 Release detection methods do not meet monitoring requirements. *Test the PUL STP sump senor to ensure it is operating correctly and submit passing test results to this office for review when completed. Properly document EZ Gauge testing and submit passing results to this office for review when completed.*
 
 
 
No Discharges Found