Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||
Cover Page Report | |||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||
District | Southeast | Type | Retail Station | ||||
County | Miami-Dade | Status | OPEN | ||||
ID | 9802395 | Latitude | 25° 27' 21.929 | ||||
Name |
MURPHY USA #5738 33517 S DIXIE HWY |
Longitude | 80° 28' 25.8922 | ||||
FLORIDA CITY, FL 33034-5628 | LL Method | DPHO | |||||
Contact | TERRELL BROOKS JR | LL Status | REVIEWED | ||||
Phone | (305) 245-4531 | Status Date | 08/13/2019 | ||||
Account Owner Information | |||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 01/11/2000 | ||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||
Phone | (870) 677-6116 | ||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||
Placard # / Date | 679923 - 06/05/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 12000 | Unleaded Gas (B) | 12/01/1999 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 12000 | Unleaded Gas (B) | 12/01/1999 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2023 | 04/30/2024 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 01/01/2022 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2019 | 04/30/2020 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2017 | 04/30/2018 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2016 | 04/30/2017 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/26/2016 | 04/26/2017 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 04/30/2014 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2012 | 04/30/2013 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2011 | 04/30/2012 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2010 | 04/30/2011 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2009 | 04/30/2010 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2008 | 04/30/2009 | |||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 11/09/2005 | 12/01/2005 | IN-COMPLIANCE | HARRIS, J | 0/2 | COMPLIANCE ASSURANCE | |
TCR | 05/04/2005 | 05/20/2005 | IN-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCI | 04/11/2005 | 04/18/2005 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TIN | 03/10/2005 | 04/01/2005 | IN-COMPLIANCE | PALERMO, C | 0/2 | COMPLIANCE ASSURANCE | |
TCR | 04/27/2004 | 05/04/2004 | IN-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCDI | 04/20/2004 | 04/26/2004 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCR | 05/13/2003 | 05/19/2003 | IN-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCI | 03/25/2003 | 03/28/2003 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCR | 01/14/2002 | 01/24/2002 | IN-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TCI | 01/04/2002 | 01/22/2002 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/2 | COMPLIANCE ASSURANCE | |
TIN | 03/27/2000 | 03/31/2000 | IN-COMPLIANCE | LAMOLA, S | 0/2 | COMPLIANCE ASSURANCE | |
TCI | 03/27/2000 | 03/30/2000 | IN-COMPLIANCE | LAMOLA, S | 0/2 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Site Inspection | 02/29/2024 | Major Out of Compliance | MATUTERODRIGUEZ_MA_1 | 0/2 | Routine Compliance | ||
Letter | 02/29/2024 | Satisfied | MATUTERODRIGUEZ_MA_1 | Compliance Assistance | |||
Electronic Communication | 02/28/2024 | Satisfied | MATUTERODRIGUEZ_MA_1 | Routine Compliance | |||
Letter | 09/29/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||
Site Inspection | 09/28/2021 | In Compliance | GRIMALDO_JN_1 | 0/2 | Routine Compliance | ||
Electronic Communication | 09/27/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||
Site Inspection | 02/06/2020 | In Compliance | DEZAYAS_A_1 | 0/2 | Compliance Assistance | ||
Letter | 02/06/2020 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||
Enforcement Tracking | 02/06/2020 | Closed Without Enforcement | DEZAYAS_A_1 | Enforcement | |||
Enforcement Referral | 11/15/2019 | Accepted | DASHTAKI_K_1 | Enforcement | |||
Site Inspection | 08/19/2019 | Major Out of Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||
Letter | 08/19/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||
Electronic Communication | 08/13/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||
Phone Conversation | 08/01/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||
Electronic Communication | 08/01/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||
Electronic Communication | 03/27/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||
Site Inspection | 03/06/2017 | In Compliance | FERNANDEZBANGO_CE_1 | 0/2 | Routine Compliance | ||
Letter | 03/05/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||
Phone Conversation | 02/04/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||
Site Inspection | 01/16/2015 | Minor Out of Compliance | FERNANDEZBANGO_CE_1 | 0/2 | Routine Compliance | ||
Site Inspection | 06/26/2013 | In Compliance | RUNTE_C_3 | 0/2 | Non-Compliance | ||
Discharge Reporting | 03/14/2013 | Satisfied | KONG_TE_1 | Discharge | |||
Letter | 03/11/2013 | Satisfied | RUNTE_C_3 | Non-Compliance | |||
Emergency Preparedness Information | 03/11/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||
Site Inspection | 03/11/2013 | Minor Out of Compliance | RUNTE_C_3 | 0/2 | Routine Compliance | ||
Phone Conversation | 03/04/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||
Document Management | 05/27/2011 | Complete | KONG_TE_1 | Discharge | |||
Site Inspection | 05/26/2011 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||
Site Inspection | 05/19/2011 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||
Site Inspection | 04/14/2011 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||
Emergency Preparedness Information | 04/14/2011 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||
Letter | 04/14/2011 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||
Site Inspection | 03/25/2010 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||
Site Inspection | 09/18/2008 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||
Site Inspection | 09/18/2008 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||
Site Inspection | 08/08/2008 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Non-Compliance | ||
Letter | 08/08/2008 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||
Site Inspection | 07/07/2008 | Major Out of Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||
Letter | 07/07/2008 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||
Emergency Preparedness Information | 02/06/2007 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||
Site Inspection | 01/29/2007 | In Compliance | CAJUSTE_PJ_1 | 0/2 | Routine Compliance | ||
Emergency Preparedness Information | 09/21/2006 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
02/28/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing tests: - Integrity tests of two (2) STP sumps - Integrity test of four (4) dispenser sumps | |||
02/28/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove the corrosion and reapply exterior coating to ONLY the regular STP and sump components. Provide photos of completed work. | |||
02/28/2024 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide the monthly visual and electronic release detection logs. | |||
02/28/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current and passing test: - Annual operability test of the overfill protection devices | |||
02/28/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide current Class A/B and C operator training certificates. | |||
02/28/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | - Annual operability test of the electronic release detection device (Gilbarco EMC panel) - Annual operability test of the mechanical line leak detectors | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
09/27/2010 | COMPLETED | 30 | |||||
04/20/2004 | COMPLETED | 30 | |||||