Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Osceola | Status | OPEN | ||||||||
ID | 9802611 | Latitude | 28° 20' 31.9836 | ||||||||
Name |
CIRCLE K #2708958 808 BUENA VENTURA BLVD |
Longitude | 81° 21' 47.3532 | ||||||||
KISSIMMEE, FL 34743 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 09/18/2023 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 08/24/2012 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 698113 - 06/29/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BUENAVENTURA 14661 LLC 16413 N 91ST #C-140 SCOTTSDALE, AZ 85260 |
Effective Date | 06/30/2010 | ||||||||
Contact | TRISHA FRUTH | ||||||||||
Phone | (480) 354-3452 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 12/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 12/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 12/01/1999 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/30/2023 | 08/28/2024 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 03/03/2011 | 03/03/2012 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 03/03/2010 | 03/03/2011 | CHUBB | ||||||||
INSURANCE | 01/01/2009 | 01/01/2010 | ACE | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 03/22/2006 | 03/23/2006 | IN-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
RRBD | 07/25/2005 | 10/05/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 07/18/2005 | 07/21/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | MARK GILL | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes VIOLATION OF 62-761.400(3) FOR NO RECORD OF INSURANCE OR CFR ON SITE VIOLATION OF 62-761.700(1)(C)1 FOR EXCESSIVE LIQUID IN UNLEADED AND MID GRADE SUMP. VIOLATION OF 62-761.700 (1)(C)3 NO RECORD OF ANNUAL TEST MONITOR AND LLD. REGISTRATION , RDRL OK | |||||||||||
TCI | 07/20/2004 | 07/20/2004 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY APPEARS TO BE IN COMPLIANCE | |||||||||||
TCR | 08/15/2003 | 08/18/2003 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes RECV'D MANIFEST OF LIQUID BEING PUMPED | |||||||||||
TCI | 07/11/2003 | 07/16/2003 | MINOR OUT-OF-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY OUT OF COMPLIANCE | |||||||||||
TCR | 08/22/2002 | 08/22/2002 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS FACILITY IS NOW IN COMPLIANCE | |||||||||||
RRBD | 08/20/2002 | 08/21/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 07/12/2002 | 07/15/2002 | MINOR OUT-OF-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY OUT OF COMPLIANCE | |||||||||||
TCI | 09/07/2001 | 09/07/2001 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY IN COMPLIANCE | |||||||||||
TCI | 09/19/2000 | 09/20/2000 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS FACILITY IS IN COMPLIANCE | |||||||||||
TIN | 02/28/2000 | 03/02/2000 | IN-COMPLIANCE | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes FINAL INSPECTION | |||||||||||
SV | 01/03/2000 | 03/02/2000 | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes HYDROSTATIC TEST | |||||||||||
SV | 12/23/1999 | 03/02/2000 | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PRI AND SEC PIPING AIR TEST | |||||||||||
SV | 12/08/1999 | 03/02/2000 | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK PLACEMENT AND RIE DOWNS | |||||||||||
SV | 12/03/1999 | 03/02/2000 | BILL BRADSHAW | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK AIR TEST | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 06/21/2024 | Accepted | GREGORY_JW_1 | Enforcement | |||||||
Site Inspection | 12/13/2023 | Minor Out of Compliance | SAVOY_JA_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 12/13/2023 | Satisfied | SAVOY_JA_1 | Compliance Assistance | |||||||
Letter | 12/13/2023 | Satisfied | SAVOY_JA_1 | Compliance Assistance | |||||||
Electronic Communication | 12/12/2023 | Satisfied | SAVOY_JA_1 | Compliance Assistance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Letter | 01/21/2022 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Site Inspection | 01/10/2022 | In Compliance | SAVOY_JA_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 01/10/2022 | Satisfied | SAVOY_JA_1 | Routine Compliance | |||||||
Record Document | 09/25/2020 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 09/25/2020 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Letter | 10/29/2019 | Satisfied | SANCHEZ_JI_1 | Compliance Assistance | |||||||
Site Inspection | 10/24/2019 | Major Out of Compliance | SANCHEZ_JI_1 | 0/3 | Routine Compliance | ||||||
Incident | 07/31/2018 | Has not led to Discharge | RAINEY_A | Incident | |||||||
Site Inspection | 07/17/2018 | In Compliance | RAUENZAHN_RA_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 07/06/2018 | Satisfied | RAINEY_A | Enforcement | |||||||
Enforcement Tracking | 07/06/2018 | Closed Without Enforcement | RAINEY_A | Enforcement | |||||||
Electronic Communication | 07/06/2018 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 06/28/2018 | Satisfied | RAINEY_A | Enforcement | |||||||
Electronic Communication | 06/19/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 06/15/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 05/16/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 02/13/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 02/09/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 02/07/2018 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Electronic Communication | 12/29/2017 | Satisfied | MOORHEAD_SB_1 | Compliance Assistance | |||||||
Enforcement Referral | 12/28/2017 | Accepted | RAUENZAHN_RA_1 | Enforcement | |||||||
Electronic Communication | 12/26/2017 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 12/20/2017 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Letter | 12/20/2017 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Site Inspection | 12/20/2017 | Major Out of Compliance | MOORHEAD_SB_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 12/06/2017 | Satisfied | MOORHEAD_SB_1 | Routine Compliance | |||||||
Document Management | 10/11/2017 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Letter | 05/04/2017 | Satisfied | MOORHEAD_SB_1 | Non-Compliance | |||||||
Site Inspection | 04/27/2017 | Minor Out of Compliance | MOORHEAD_SB_1 | 0/3 | Installation | ||||||
Site Inspection | 04/27/2017 | Minor Out of Compliance | MOORHEAD_SB_1 | 0/3 | Closure | ||||||
Document Management | 04/06/2017 | Satisfied | BECKER_GT_1 | Incident | |||||||
Document Management | 02/01/2017 | Satisfied | BECKER_GT_1 | Incident | |||||||
Site Inspection | 11/25/2015 | In Compliance | BOWERS_M_2 | 0/3 | Routine Compliance | ||||||
Document Management | 10/31/2015 | Complete | BOWERS_M_2 | Routine Compliance | |||||||
Electronic Communication | 10/28/2015 | Satisfied | BOWERS_M_2 | Routine Compliance | |||||||
Site Inspection | 03/28/2014 | In Compliance | BOWERS_M_2 | 0/3 | Non-Compliance | ||||||
Site Inspection | 02/25/2014 | Minor Out of Compliance | BOWERS_M_2 | 0/3 | Routine Compliance | ||||||
Letter | 02/25/2014 | Satisfied | BOWERS_M_2 | Non-Compliance | |||||||
Site Inspection | 04/02/2013 | In Compliance | BECKER_GT_1 | 0/3 | Closure | ||||||
Site Inspection | 03/29/2013 | In Compliance | MOORHEAD_SB_1 | 0/3 | Installation | ||||||
Incident | 07/24/2012 | Has not led to Discharge | JOHNSON_CJ | Incident | |||||||
Meeting | 07/18/2012 | Satisfied | JOHNSON_CJ | Routine Compliance | |||||||
Document Management | 07/18/2012 | Complete | JOHNSON_CJ | Incident | |||||||
Site Inspection | 02/13/2012 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/10/2010 | Minor Out of Compliance | GILL_MA_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/09/2010 | In Compliance | GILL_MA_1 | 0/3 | Closure | ||||||
Site Inspection | 12/09/2010 | In Compliance | GILL_MA_1 | 0/3 | Installation | ||||||
Emergency Preparedness Information | 06/18/2010 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 10/21/2009 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 09/18/2009 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Site Inspection | 01/13/2009 | In Compliance | GILL_MA_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/20/2008 | In Compliance | COTTRELL_SA_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 02/17/2008 | Satisfied | COTTRELL_SA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/21/2007 | Satisfied | GILL_MA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | GILL_MA_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | GILL_MA_1 | Routine Compliance | |||||||
Site Inspection | 07/26/2006 | Minor Out of Compliance | GILL_MA_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/13/2023 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Remove the tank stick from the drop tube and perform operability test on overfill protection device. Send documentation to joseph.savoy@ocfl.net. | |||||||
12/13/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Test overfill protection devices and send documentation to joseph.savoy@ocfl.net. | |||||||
12/13/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Perform operability test on tank monitor and leak detectors. Send documentation to joseph.savoy@ocfl.net. | |||||||
No Discharges Found |