![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Washington | Status | OPEN | ||||||||
ID | 9803128 | Latitude | 30° 45' 10.2327 | ||||||||
Name |
MURPHY USA #7768 1623 MAIN ST |
Longitude | 85° 32' 59.1982 | ||||||||
CHIPLEY, FL 32428-5992 | LL Method | DPHO | |||||||||
Contact | STORE MGR | LL Status | REVIEWED | ||||||||
Phone | (850) 415-4023 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 09/05/2000 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 679928 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 11/04/2020 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 25000 | Unleaded Gas (B) | 07/01/2020 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 26000 | Vehicular Diesel (D) | 07/01/2020 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 07/01/2000 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 07/01/2000 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2023 | 04/30/2024 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 04/30/2022 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2020 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 04/30/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 05/01/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2012 | 04/30/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2009 | 04/30/2010 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2008 | 04/30/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/15/2005 | 03/22/2005 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 10/08/2004 | 11/19/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS IS AN INSTALL INSPECTION FOR THE REGULAR UNLEADED, PLUS, AND PREMIUM SPILL BUCKET REPLACEMENT. ALSO REPLACED AT THIS TIME WAS THE REGULAR UNLEADED AND PREMIUM VAPOR BUCKETS - PART #OWP-1C-2100C | |||||||||||
TII | 10/06/2004 | 11/19/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INITIAL INSPECTION TO VERIFY THE REMOVAL OF THE UNLEADED REGULAR, PLUS, AND PREMIUM SPILL BUCKETS AND THE UNLEADED REGULAR AND PREMIUM VAPOR RECOVERY BUCKETS. | |||||||||||
IRFR | 08/26/2004 | 11/13/2004 | BRAZILE_D | 0/2 | DISCHARGE PROJECT | ||||||
TCI | 02/24/2004 | 02/27/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/18/2003 | 02/24/2003 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/12/2002 | 03/20/2002 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/22/2001 | 03/29/2001 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 09/14/2000 | 09/22/2000 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 03/31/2025 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 02/19/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/08/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 10/24/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 10/23/2024 | Minor Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 05/10/2023 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/10/2023 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 05/09/2023 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 10/17/2022 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 06/27/2022 | In Compliance | KHAN_MR_1 | 0/4 | Installation | ||||||
Letter | 06/07/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 06/07/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 06/04/2021 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 06/02/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
TCAR | 02/10/2021 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Document Management | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Enforcement Referral | 01/27/2021 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Enforcement Tracking | 01/27/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Tracking | 01/26/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
TCAR | 01/18/2021 | Incomplete | WILSON_ML_1 | Closure | |||||||
Letter | 11/20/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 11/20/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 08/31/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 08/31/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 08/26/2020 | In Compliance | KHAN_MR_1 | 0/2 | Closure | ||||||
Electronic Communication | 04/15/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Electronic Communication | 02/24/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Enforcement Referral | 01/24/2019 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Letter | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 07/27/2018 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 07/27/2018 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/22/2016 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 08/29/2014 | In Compliance | BRAZILE_DO_1 | 0/2 | Closure | ||||||
Site Inspection | 08/29/2014 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Document Management | 08/15/2014 | Complete | FOXWORTH_S_1 | Incident | |||||||
Incident | 08/09/2014 | Has not led to Discharge | BRAZILE_DO_1 | Incident | |||||||
Record Document | 02/05/2014 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 12/18/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2013 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/06/2013 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Document Management | 09/01/2011 | Complete | GILLMAN_M | Incident | |||||||
Site Inspection | 04/11/2011 | In Compliance | ALBURY_JE_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/05/2011 | Satisfied | ALBURY_JE_1 | Routine Compliance | |||||||
Site Inspection | 03/18/2010 | In Compliance | ALBURY_JE_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/18/2010 | Satisfied | ALBURY_JE_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/17/2008 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Site Inspection | 10/17/2008 | In Compliance | KRAZIT_JL_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/28/2008 | Satisfied | KRAZIT_JL_1 | Closure | |||||||
Site Inspection | 06/19/2007 | In Compliance | KRAZIT_JL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | HENDERSON_SA_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
No Discharges Found |