![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Washington | Status | OPEN | ||||||||
ID | 9803128 | Latitude | 30° 45' 10.2327 | ||||||||
Name |
MURPHY USA #7768 1623 MAIN ST |
Longitude | 85° 32' 59.1982 | ||||||||
CHIPLEY, FL 32428-5992 | LL Method | DPHO | |||||||||
Contact | STORE MGR | LL Status | REVIEWED | ||||||||
Phone | (850) 415-4023 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 09/05/2000 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 679928 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 11/04/2020 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 25000 | Unleaded Gas (B) | 07/01/2020 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 26000 | Vehicular Diesel (D) | 07/01/2020 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 07/01/2000 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 07/01/2000 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2023 | 04/30/2024 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 04/30/2022 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2020 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 04/30/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 05/01/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2012 | 04/30/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2009 | 04/30/2010 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2008 | 04/30/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/15/2005 | 03/22/2005 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 10/08/2004 | 11/19/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes THIS IS AN INSTALL INSPECTION FOR THE REGULAR UNLEADED, PLUS, AND PREMIUM SPILL BUCKET REPLACEMENT. ALSO REPLACED AT THIS TIME WAS THE REGULAR UNLEADED AND PREMIUM VAPOR BUCKETS - PART #OWP-1C-2100C | |||||||||||
TII | 10/06/2004 | 11/19/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INITIAL INSPECTION TO VERIFY THE REMOVAL OF THE UNLEADED REGULAR, PLUS, AND PREMIUM SPILL BUCKETS AND THE UNLEADED REGULAR AND PREMIUM VAPOR RECOVERY BUCKETS. | |||||||||||
IRFR | 08/26/2004 | 11/13/2004 | BRAZILE_D | 0/2 | DISCHARGE PROJECT | ||||||
TCI | 02/24/2004 | 02/27/2004 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/18/2003 | 02/24/2003 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/12/2002 | 03/20/2002 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 03/22/2001 | 03/29/2001 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 09/14/2000 | 09/22/2000 | IN-COMPLIANCE | BRAZILE_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/19/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 01/08/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 10/24/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 10/23/2024 | Minor Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 05/10/2023 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/10/2023 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Phone Conversation | 05/09/2023 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 10/17/2022 | Satisfied | WILSON_ML_1 | Installation | |||||||
Site Inspection | 06/27/2022 | In Compliance | KHAN_MR_1 | 0/4 | Installation | ||||||
Letter | 06/07/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 06/07/2021 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 06/04/2021 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 06/02/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
TCAR | 02/10/2021 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Letter | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 02/09/2021 | Satisfied | WILSON_ML_1 | Closure | |||||||
Enforcement Referral | 01/27/2021 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Enforcement Tracking | 01/27/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Tracking | 01/26/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
TCAR | 01/18/2021 | Incomplete | WILSON_ML_1 | Closure | |||||||
Issue Document | 11/20/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 11/20/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Letter | 08/31/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Issue Document | 08/31/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Site Inspection | 08/26/2020 | In Compliance | KHAN_MR_1 | 0/2 | Closure | ||||||
Electronic Communication | 04/15/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Electronic Communication | 02/24/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Enforcement Referral | 01/24/2019 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Issue Document | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 07/27/2018 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 07/27/2018 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 01/22/2016 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 08/29/2014 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Site Inspection | 08/29/2014 | In Compliance | BRAZILE_DO_1 | 0/2 | Closure | ||||||
Document Management | 08/15/2014 | Complete | FOXWORTH_S_1 | Incident | |||||||
Incident | 08/09/2014 | Has not led to Discharge | BRAZILE_DO_1 | Incident | |||||||
Record Document | 02/05/2014 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 12/18/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2013 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/06/2013 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Document Management | 09/01/2011 | Complete | GILLMAN_M | Incident | |||||||
Site Inspection | 04/11/2011 | In Compliance | ALBURY_JE_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/05/2011 | Satisfied | ALBURY_JE_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 03/18/2010 | Satisfied | ALBURY_JE_1 | Routine Compliance | |||||||
Site Inspection | 03/18/2010 | In Compliance | ALBURY_JE_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/17/2008 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Site Inspection | 10/17/2008 | In Compliance | KRAZIT_JL_1 | 0/2 | Routine Compliance | ||||||
Letter | 01/28/2008 | Satisfied | KRAZIT_JL_1 | Closure | |||||||
Site Inspection | 06/19/2007 | In Compliance | KRAZIT_JL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | KRAZIT_JL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | HENDERSON_SA_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/23/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified contractor conduct the annual operability testing for the primary release detection device. Upon completion forward documentation of the annual operability testing for release detection to Daniel.Gartin@flhealth.gov | |||||||
10/23/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified contractor conduct the annual operability testing for the interstitial gauges of the spill buckets. Any damaged components will require repairs or replacement. Send the annual operability testing for the interstitial gauges to Daniel.Gartin@flhealth.gov. | |||||||
10/23/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have a certified contractor conduct the annual operability testing for the line leak detector. Submit the testing annual operability documentation to Daniel.Gartin@flhealth.gov. | |||||||
10/23/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Conduct the overfill prevention annual operability testing for the primary overfill prevention device. Once the work has been completed, forward documentation of annual operability testing to Daniel.Gartin@flhealth.gov. If any components are damaged, a certified contractor will need to be scheduled to conduct repairs or replaces to overfill prevention device(s). | |||||||
10/23/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | If needed, have a certified contractor conduct the integrity testing for the spill buckets installed at the facility and repair/replace any damaged components. Forward any work conducted and passing integrity testing to Daniel.Gartin@flhealth.gov. | |||||||
No Discharges Found |