DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Washington   Status    OPEN
 
ID 9803128   Latitude    30° 45' 10.2327
 
Name MURPHY USA #7768
1623 MAIN ST
Longitude    85° 32' 59.1982
  CHIPLEY, FL 32428-5992 LL Method    DPHO
 
Contact STORE MGR   LL Status    REVIEWED
 
Phone (850) 415-4023   Status Date    06/15/2023
 
Account Owner Information
 
Name MURPHY OIL USA INC
200 PEACH ST
El Dorado, AR 71730
Effective Date    09/05/2000
 
Contact KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE
 
Phone (870) 677-6116
 
Email KRYSTAL.TERRELL@MURPHYUSA.COM
  Placard # / Date    679928 - 06/05/2024
Property Owner Information
 
Name MURPHY OIL USA INC
200 PEACH ST
El Dorado, AR 71730
Effective Date    11/04/2020
 
Contact KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE
 
Phone (870) 677-6116
 
Email KRYSTAL.TERRELL@MURPHYUSA.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
3 25000 Unleaded Gas (B) 07/01/2020 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
4 26000 Vehicular Diesel (D) 07/01/2020 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 12000 Unleaded Gas (B) 07/01/2000 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(Z) DEP approved piping
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(A) Site Suitability Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 12000 Unleaded Gas (B) 07/01/2000 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(Z) DEP approved piping
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(A) Site Suitability Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   01/01/2024 04/30/2025
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   01/01/2023 04/30/2024
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   01/01/2022 04/30/2023
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   01/01/2021 04/30/2022
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2020 04/30/2021
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2018 04/30/2019
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2015 04/30/2016
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2014 04/30/2015
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2013 05/01/2014
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2012 04/30/2013
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2010 04/30/2011
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2009 04/30/2010
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER   05/01/2008 04/30/2009
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 03/15/2005 03/22/2005 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
TIN 10/08/2004 11/19/2004 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes THIS IS AN INSTALL INSPECTION FOR THE REGULAR UNLEADED, PLUS, AND PREMIUM SPILL BUCKET REPLACEMENT. ALSO REPLACED AT THIS TIME WAS THE REGULAR UNLEADED AND PREMIUM VAPOR BUCKETS - PART #OWP-1C-2100C
 
TII 10/06/2004 11/19/2004 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes INITIAL INSPECTION TO VERIFY THE REMOVAL OF THE UNLEADED REGULAR, PLUS, AND PREMIUM SPILL BUCKETS AND THE UNLEADED REGULAR AND PREMIUM VAPOR RECOVERY BUCKETS.
 
IRFR 08/26/2004 11/13/2004 BRAZILE_D 0/2 DISCHARGE PROJECT
 
TCI 02/24/2004 02/27/2004 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
TCI 02/18/2003 02/24/2003 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
TCI 03/12/2002 03/20/2002 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
TCI 03/22/2001 03/29/2001 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
TIN 09/14/2000 09/22/2000 IN-COMPLIANCE BRAZILE_D 0/2 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 02/19/2025 Accepted GARTIN_D Enforcement
 
Electronic Communication 01/08/2025 Satisfied GARTIN_D Compliance Assistance
 
Letter 10/24/2024 Satisfied GARTIN_D Compliance Assistance
 
Site Inspection 10/23/2024 Minor Out of Compliance GARTIN_D 0/2 Routine Compliance
 
Electronic Communication 10/22/2024 Satisfied GARTIN_D Routine Compliance
 
Electronic Communication 10/22/2024 Satisfied GARTIN_D Routine Compliance
 
Site Inspection 05/10/2023 In Compliance KHAN_MR_1 0/2 Routine Compliance
 
Letter 05/10/2023 Satisfied WILSON_ML_1 Routine Compliance
 
Phone Conversation 05/09/2023 Satisfied KHAN_MR_1 Routine Compliance
 
Letter 10/17/2022 Satisfied WILSON_ML_1 Installation
 
Site Inspection 06/27/2022 In Compliance KHAN_MR_1 0/4 Installation
 
Letter 06/07/2021 Satisfied WILSON_ML_1 Routine Compliance
 
Issue Document 06/07/2021 Satisfied WILSON_ML_1 Routine Compliance
 
Site Inspection 06/04/2021 In Compliance KHAN_MR_1 0/2 Routine Compliance
 
Phone Conversation 06/02/2021 Satisfied KHAN_MR_1 Routine Compliance
 
TCAR 02/10/2021 Satisfied PAYNE_CL_1 Closure
 
Letter 02/09/2021 Satisfied WILSON_ML_1 Closure
 
Document Management 02/09/2021 Satisfied WILSON_ML_1 Closure
 
Issue Document 02/09/2021 Satisfied WILSON_ML_1 Closure
 
Enforcement Referral 01/27/2021 Accepted WILSON_ML_1 Enforcement
 
Enforcement Tracking 01/27/2021 Closed Without Enforcement GILLMAN_M Enforcement
 
Enforcement Tracking 01/26/2021 Closed Without Enforcement GILLMAN_M Enforcement
 
TCAR 01/18/2021 Incomplete WILSON_ML_1 Closure
 
Issue Document 11/20/2020 Satisfied WILSON_ML_1 Closure
 
Letter 11/20/2020 Satisfied WILSON_ML_1 Closure
 
Letter 08/31/2020 Satisfied WILSON_ML_1 Closure
 
Issue Document 08/31/2020 Satisfied WILSON_ML_1 Closure
 
Site Inspection 08/26/2020 In Compliance KHAN_MR_1 0/2 Closure
 
Electronic Communication 04/15/2020 Satisfied THROCKMORTON_JN Enforcement
 
Electronic Communication 02/24/2020 Satisfied THROCKMORTON_JN Enforcement
 
Enforcement Referral 01/24/2019 Accepted WILSON_ML_1 Enforcement
 
Issue Document 07/30/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 07/30/2018 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 07/27/2018 Major Out of Compliance KHAN_MR_1 0/2 Routine Compliance
 
Phone Conversation 07/27/2018 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 01/22/2016 In Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
Site Inspection 08/29/2014 In Compliance BRAZILE_DO_1 0/2 Installation
 
Site Inspection 08/29/2014 In Compliance BRAZILE_DO_1 0/2 Closure
 
Document Management 08/15/2014 Complete FOXWORTH_S_1 Incident
 
Incident 08/09/2014 Has not led to Discharge BRAZILE_DO_1 Incident
 
Record Document 02/05/2014 Satisfied BRAZILE_DO_1 Non-Compliance
 
Letter 12/18/2013 Satisfied DAURIA_KL_1 Non-Compliance
 
Site Inspection 12/16/2013 Minor Out of Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
Site Inspection 02/06/2013 In Compliance BRAZILE_DO_1 0/2 Routine Compliance
 
Document Management 09/01/2011 Complete GILLMAN_M Incident
 
Site Inspection 04/11/2011 In Compliance ALBURY_JE_1 0/2 Routine Compliance
 
Emergency Preparedness Information 04/05/2011 Satisfied ALBURY_JE_1 Routine Compliance
 
Emergency Preparedness Information 03/18/2010 Satisfied ALBURY_JE_1 Routine Compliance
 
Site Inspection 03/18/2010 In Compliance ALBURY_JE_1 0/2 Routine Compliance
 
Emergency Preparedness Information 10/17/2008 Satisfied KRAZIT_JL_1 Routine Compliance
 
Site Inspection 10/17/2008 In Compliance KRAZIT_JL_1 0/2 Routine Compliance
 
Letter 01/28/2008 Satisfied KRAZIT_JL_1 Closure
 
Site Inspection 06/19/2007 In Compliance KRAZIT_JL_1 0/2 Routine Compliance
 
Emergency Preparedness Information 05/23/2007 Satisfied KRAZIT_JL_1 Routine Compliance
 
Emergency Preparedness Information 02/09/2007 Satisfied KRAZIT_JL_1 Routine Compliance
 
Emergency Preparedness Information 09/22/2006 Satisfied HENDERSON_SA_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
10/23/2024 6062 Minor 2.5 Release detection devices not tested annually. Have a certified contractor conduct the annual operability testing for the primary release detection device. Upon completion forward documentation of the annual operability testing for release detection to Daniel.Gartin@flhealth.gov
 
10/23/2024 6062 Minor 2.5 Release detection devices not tested annually. Have a certified contractor conduct the annual operability testing for the interstitial gauges of the spill buckets. Any damaged components will require repairs or replacement. Send the annual operability testing for the interstitial gauges to Daniel.Gartin@flhealth.gov.
 
10/23/2024 6062 Minor 2.5 Release detection devices not tested annually. Have a certified contractor conduct the annual operability testing for the line leak detector. Submit the testing annual operability documentation to Daniel.Gartin@flhealth.gov.
 
10/23/2024 6053 Minor 4.7 Primary overfill protection not provided, registered, or tested as required. Conduct the overfill prevention annual operability testing for the primary overfill prevention device. Once the work has been completed, forward documentation of annual operability testing to Daniel.Gartin@flhealth.gov. If any components are damaged, a certified contractor will need to be scheduled to conduct repairs or replaces to overfill prevention device(s).
 
10/23/2024 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. If needed, have a certified contractor conduct the integrity testing for the spill buckets installed at the facility and repair/replace any damaged components. Forward any work conducted and passing integrity testing to Daniel.Gartin@flhealth.gov.
 
 
 
No Discharges Found