![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Suwannee | Status | OPEN | ||||||||
ID | 9803207 | Latitude | 30° 19' 31 | ||||||||
Name |
FRESH STOP 1407 6886 SUWANNEE PLAZA LN |
Longitude | 82° 57' 56 | ||||||||
LIVE OAK, FL 32060 | LL Method | AGPS | |||||||||
Contact | JOSE SAMORA | LL Status | REVIEWED | ||||||||
Phone | (386) 215-9346 | Status Date | 04/08/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CAMERON-SQRL LIVE OAK LLC 6805 CARNEGIE BLVD STE 120 CHARLOTTE, NC 28211 |
Effective Date | 10/07/2024 | ||||||||
Contact | SCOTT BURCHFIELD / NICOLE MAJKOWICZ 312-506-4180 | ||||||||||
Phone | (813) 599-2793 | ||||||||||
SBURCHFIELD@YOURFRESHSTOP.COM | |||||||||||
Placard # / Date | 704935 - 01/17/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | CAMERON-SQRL LIVE OAK LLC 6805 CARNEGIE BLVD STE 120 CHARLOTTE, NC 28211 |
Effective Date | 03/17/2023 | ||||||||
Contact | SCOTT BURCHFIELD / NICOLE MAJKOWICZ 312-506-4180 | ||||||||||
Phone | (813) 599-2793 | ||||||||||
SBURCHFIELD@YOURFRESHSTOP.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 08/01/2000 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 08/01/2000 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | COMMERCE & INDUSTRY | ||||||||||
INSURANCE | 07/14/2023 | 07/14/2024 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 03/20/2022 | 03/20/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 12/01/2021 | 03/22/2022 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2018 | 09/01/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2017 | 09/01/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2016 | 09/01/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 09/01/2014 | 09/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2012 | 09/01/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2011 | 09/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/01/2010 | 09/01/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/30/2009 | 09/30/2010 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/27/2005 | IN-COMPLIANCE | STEVE SNIPES | 0/2 | COMPLIANCE ASSURANCE | ||||||
FR | 09/19/2005 | 09/19/2005 | IN-COMPLIANCE | HUTCHERSON | 0/0 | COMPLIANCE ASSURANCE | |||||
TCI | 05/24/2005 | 06/03/2005 | MINOR OUT-OF-COMPLIANCE | PAUL HUTCHERSON | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/22/2004 | 07/22/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED FAX COPY OF BINDER FOR FR | |||||||||||
CWOE | 07/22/2004 | 07/22/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 07/21/2004 | 07/22/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes VERIFIED REPAIRS MADE | |||||||||||
NCLI | 05/21/2004 | 06/18/2004 | WAYNE ERATO | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/13/2004 | 05/18/2004 | MINOR OUT-OF-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/22/2003 | 06/06/2003 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING IS DOUBLE WALL FIBERGLASS | |||||||||||
TCI | 06/13/2002 | 06/13/2002 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes FACILITY DUE FOR SENSOR TESTING BY 6-17-02 | |||||||||||
TIN | 11/09/2000 | 12/01/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes FINAL INSPECTION | |||||||||||
TIN | 09/21/2000 | 09/28/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TEST OF SECONDARY PIPE AND DISPENSER LINERS.ALL PASSED. | |||||||||||
TIN | 09/20/2000 | 09/28/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PRIMARY PIPING TEST, OK. | |||||||||||
TIN | 08/23/2000 | 09/28/2000 | IN-COMPLIANCE | WAYNE ERATO | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEW FACILITY. TWO TANKS DELIVERED AND ANCHORED | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 03/03/2025 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Tracking | 01/30/2025 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 01/21/2025 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Electronic Communication | 01/14/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 01/14/2025 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 01/14/2025 | Major Out of Compliance | ZIMMERMAN_RA_2 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/02/2025 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Enforcement Referral | 05/03/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Electronic Communication | 04/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 03/09/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 03/09/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 03/09/2023 | Major Out of Compliance | ZIMMERMAN_RA_2 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 01/30/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 01/13/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 01/13/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 12/02/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 09/09/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 09/09/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 09/09/2020 | Major Out of Compliance | ZIMMERMAN_RA_2 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/28/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 06/22/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 06/22/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 06/22/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/16/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 01/16/2019 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/2 | Routine Compliance | ||||||
Letter | 01/16/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 11/28/2018 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Issue Document | 10/24/2016 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 10/24/2016 | In Compliance | GRAHAM_DL_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 08/17/2016 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Phone Conversation | 08/16/2016 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Record Document | 04/29/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/26/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 03/26/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 03/26/2015 | Major Out of Compliance | GRAHAM_DL_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/01/2013 | In Compliance | GRAHAM_DL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/01/2013 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Electronic Communication | 11/06/2012 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/08/2012 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 05/08/2012 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 05/08/2012 | Minor Out of Compliance | GRAHAM_DL_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 11/04/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 11/04/2010 | In Compliance | SNIPES_SR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/04/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 10/18/2010 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/14/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Issue Document | 10/14/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/14/2009 | In Compliance | SNIPES_SR_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 08/13/2009 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/05/2008 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 11/05/2008 | In Compliance | SNIPES_SR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/24/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/24/2007 | In Compliance | SNIPES_SR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
Site Inspection | 10/18/2006 | In Compliance | SNIPES_SR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/24/2006 | Satisfied | SNIPES_SR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/14/2025 | 6001 | Minor | 2.1 No reasonable access provided. | Contact DEP-NED to resolve violations. | |||||||
01/14/2025 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Email current Proof of Financial Responsibility to DEP-NED. | |||||||
03/09/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Submit incident notification for failed CIE testing; Have RUL spill bucket repaired or replaced – perform post repair/replacement containment integrity evaluation testing of spill bucket and email INF and passing test certification to ACEPD. | |||||||
No Discharges Found |