![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 9803424 | Latitude | 26° 12' 45.9031 | ||||||||
Name |
CIRCLE K #2723860 4025 PINE RIDGE RD EXT |
Longitude | 81° 41' 16.1007 | ||||||||
NAPLES, FL 34119 | LL Method | DPHO | |||||||||
Contact | Ira Lewis | LL Status | REVIEWED | ||||||||
Phone | (984) 389-1300 | Status Date | 10/12/2023 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 01/07/2016 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 698068 - 06/29/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | GO TIME INC 775 3rd St NW Naples, FL 34120-2018 |
Effective Date | 12/12/2000 | ||||||||
Contact | TIM WOODWARD | ||||||||||
Phone | (239) 354-9839 | ||||||||||
TJWWARD@WORLDNET.ATT.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 09/01/2000 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 09/01/2000 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Vehicular Diesel (D) | 09/01/2000 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/25/2021 | 08/28/2024 | |||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2014 | 11/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2013 | 11/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2012 | 11/01/2013 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2011 | 11/01/2012 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2008 | 11/01/2009 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 01/30/2006 | 01/30/2006 | OWEN_JA | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D NON-HAZARDOUS WASTE MANIFEST FOR REMOVED PETROLEUM CONTACT WATER. CLOSE VIOLATION FROM 1/06 INSPECTION | |||||||||||
TCI | 01/20/2006 | 01/27/2006 | MINOR OUT-OF-COMPLIANCE | POTTS_C | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes SUMPS CONTAINED WATER | |||||||||||
TCI | 12/20/2004 | 12/20/2004 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS | |||||||||||
TCI | 11/24/2003 | 11/24/2003 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: DW FIBERGLASS | |||||||||||
TCI | 11/21/2002 | 11/21/2002 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS | |||||||||||
TCQA | 01/09/2002 | 01/09/2003 | NORMAN, T | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes QA/QC INSPECTION. FACILITY IN COMPLIANCE. | |||||||||||
LTR | 12/18/2001 | 12/18/2001 | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes COVER LETTER FOR TCI | |||||||||||
TCI | 12/14/2001 | 12/17/2001 | IN-COMPLIANCE | KOLANDA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 0 VIOLATIONS | |||||||||||
LTR | 03/30/2001 | 04/02/2001 | SNYDERBURN_P | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TIN COVER LETTER MAILER | |||||||||||
TIN | 03/16/2001 | 03/30/2001 | IN-COMPLIANCE | SNYDERBURN_P | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 3 UST INSTALLED WITH VEEDER ROOTE SYSTEM. | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/29/2024 | Accepted | STANDIFORD_JA | Enforcement | |||||||
Record Document | 01/17/2024 | Satisfied | STANDIFORD_JA | Routine Compliance | |||||||
Record Document | 12/04/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||||||
Letter | 09/06/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||||||
Electronic Communication | 08/31/2023 | Satisfied | STANDIFORD_JA | Routine Compliance | |||||||
Site Inspection | 08/31/2023 | Major Out of Compliance | STANDIFORD_JA | 0/3 | Routine Compliance | ||||||
Incident | 03/24/2022 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/24/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Document Management | 03/24/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/21/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/21/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Electronic Communication | 03/21/2022 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Site Inspection | 08/04/2021 | Major Out of Compliance | HERNANDEZ_N_5 | 0/3 | Routine Compliance | ||||||
Letter | 08/04/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 08/04/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||||||
Incident | 02/10/2021 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||||||
Document Management | 11/18/2020 | Satisfied | HERNANDEZ_N_5 | Incident | |||||||
Incident | 02/27/2020 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Letter | 01/02/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Electronic Communication | 01/02/2020 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Document Management | 12/31/2019 | Satisfied | SNYDERBURN_PJ_2 | Incident | |||||||
Site Inspection | 11/27/2019 | Minor Out of Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/27/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/25/2019 | Satisfied | BATES_TD_1 | Routine Compliance | |||||||
Incident | 10/28/2019 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Document Management | 09/28/2019 | Satisfied | SNYDERBURN_PJ_2 | Incident | |||||||
Letter | 01/03/2018 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Record Document | 01/02/2018 | Satisfied | STANDIFORD_JA_2 | Routine Compliance | |||||||
Electronic Communication | 12/05/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Letter | 09/29/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||||||
Site Inspection | 08/29/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||||||
Incident | 03/04/2016 | Has not led to Discharge | BATES_TD_1 | Incident | |||||||
Document Management | 12/18/2015 | Complete | BATES_TD_1 | Incident | |||||||
Site Inspection | 12/14/2015 | In Compliance | BATES_TD_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/22/2014 | In Compliance | SPARKS_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/30/2013 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 02/20/2013 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||||||
Site Inspection | 02/20/2013 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Closure | ||||||
Emergency Preparedness Information | 08/25/2012 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Record Document | 03/19/2012 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
TCAR | 01/30/2012 | Satisfied | SNYDERBURN_PJ_2 | Closure | |||||||
Document Management | 01/30/2012 | Complete | SNYDERBURN_PJ_2 | Closure | |||||||
Document Management | 01/20/2012 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
Incident | 01/20/2012 | Led to Discharge (Incident promoted) | SNYDERBURN_PJ_2 | Incident | |||||||
Document Management | 01/20/2012 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
Letter | 01/20/2012 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Discharge Reporting | 01/20/2012 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Site Inspection | 01/19/2012 | In Compliance | SNYDERBURN_PJ_2 | 0/1 | Closure | ||||||
Record Document | 12/21/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 12/15/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Letter | 12/15/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 07/07/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/07/2010 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/01/2009 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 05/01/2009 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Record Document | 11/03/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 04/28/2008 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/25/2008 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 05/04/2007 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | OWEN_JA | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/29/2023 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please provide any documentation associated with the integrity test failure of the PUL STP sump within 90 days of the inspection date via email to the inspector. (Please provide any documentation stating what was the cause of the integrity test failure, associated repairs, and a follow up integrity test after repairs were made. Additionally, if there was a damaged component that caused the failure, please submit an Incident Notification Form and perform an investigation to determine if a discharge occurred. If a discharge is confirmed, then the Incident will be promoted to a Discharge and sampling around the PUL STP sump will be required.) | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/13/2012 | COMPLETED | 41 | |||||||||