Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 9803696 | Latitude | 27° 51' 47.842 | ||||||||
Name |
GATEWAY BUILDING 10222 MCI DRIVE |
Longitude | 82° 40' 39.7483 | ||||||||
PINELLAS PARK, FL 33782 | LL Method | DPHO | |||||||||
Contact | ROBERT VILLALTA | LL Status | REVIEWED | ||||||||
Phone | (305) 751-6664 | Status Date | 04/21/2004 | ||||||||
Account Owner Information | |||||||||||
Name | PINELLAS PLAZA LLC 888 7TH AVE,20TH FL NEW YORK, FL 10106 |
Effective Date | 04/11/2018 | ||||||||
Contact | ROBERT VILLALTA | ||||||||||
Phone | (305) 751-6664 | ||||||||||
ROBERT@DPLACEMIAMI.COM | |||||||||||
Placard # / Date | 682945 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PINELLAS PLAZA LLC 888 7TH AVE,20TH FL NEW YORK, FL 10106 |
Effective Date | 04/11/2018 | ||||||||
Contact | ROBERT VILLALTA | ||||||||||
Phone | (305) 751-6664 | ||||||||||
ROBERT@DPLACEMIAMI.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Emerg Generator Diesel (G) | 10/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (Z) DEP approved piping |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/04/2018 | 07/04/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 07/04/2017 | 07/04/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 07/14/2014 | 07/14/2015 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 07/14/2013 | 07/14/2014 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 07/14/2012 | 07/14/2013 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 06/23/2010 | 06/23/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/23/2009 | 06/23/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/23/2007 | 06/23/2008 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
CFFE | 11/03/2004 | 11/05/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
SCOE | 11/03/2004 | 11/05/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/08/2004 | 07/16/2004 | IN-COMPLIANCE | BARNETT | 1/0 | COMPLIANCE ASSURANCE | |||||
LTR | 07/08/2004 | 07/16/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
EPI | 06/01/2004 | 11/05/2004 | LEWIS_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 09/04/2003 | 09/08/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes 6 MONTH GAP IN INSURANCE COVERAGE | |||||||||||
NCLI | 05/28/2003 | 06/02/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/19/2003 | 06/02/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/04/2002 | 04/09/2002 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 03/25/2002 | 04/08/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/21/2002 | 04/02/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 05/18/2001 | 05/30/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/12/2001 | 04/22/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 02/28/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 02/28/2023 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 02/28/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/22/2023 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 03/30/2020 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 03/30/2020 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/11/2020 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Letter | 11/01/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 04/09/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Enforcement Referral | 04/09/2018 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 04/09/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Record Document | 04/03/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 01/03/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 01/03/2018 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 12/18/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Phone Conversation | 12/18/2017 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 04/28/2015 | In Compliance | COLSON_NJ_1 | 1/0 | Non-Compliance | ||||||
Issue Document | 04/28/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 03/16/2015 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 03/16/2015 | Minor Out of Compliance | COLSON_NJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 03/28/2013 | In Compliance | JUEDES_HC_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 03/28/2013 | Satisfied | JUEDES_HC_1 | Routine Compliance | |||||||
Issue Document | 06/07/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 06/06/2011 | In Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 05/18/2010 | In Compliance | LONGEN_JL_1 | 1/0 | Routine Compliance | ||||||
Record Document | 03/09/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Letter | 03/03/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 03/03/2009 | Major Out of Compliance | BARNETT_JX | 1/0 | Routine Compliance | ||||||
Record Document | 09/03/2008 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 06/19/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Enforcement Tracking | 06/18/2008 | Closed With Enforcement | RANDOLPH_L | Enforcement | |||||||
Record Document | 03/05/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Meeting | 02/20/2008 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Enforcement Referral | 02/15/2008 | Accepted | RANDOLPH_L | Enforcement | |||||||
Site Inspection | 11/30/2007 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Routine Compliance | ||||||
Letter | 11/30/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 05/04/2007 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 10/27/2006 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 10/27/2006 | Major Out of Compliance | BARNETT_JX | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/30/2020 | 5005 | SNC-B | 1.5 Motor fuel being deposited into storage tank at facility where valid registration placard is not displayed. | Submit a copy of the current (2019-2020) registration placard. Be sure to keep a copy available for review at the facility. | |||||||
03/30/2020 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Submit current operability test results for the overfill protection device (Krueger Level Gauge). | |||||||
03/30/2020 | 5011 | SNC-B | 1.6 Failure to maintain and demonstrate financial responsibility. | Submit the missing documentation for Financial Responsibility. Utilize FR Forms Part D & Part P. | |||||||
03/30/2020 | 5002 | Minor | 1.2 Registration Form not submitted for change in service or closure. | Fill out & submit an updated storage tank registration form. | |||||||
01/03/2018 | 5012 | Minor | 1.7 Incomplete documentation demonstrating financial responsibility. | Submit copies of the storage tank insurance policies from 2015 to current. For the current policy, fill out & submit copies of FDEP FR forms, Part D and Part P. | |||||||
01/03/2018 | 5102 | Minor | 3.3 Shop fabricated storage tank system release detection devices not tested annually. | Be sure to have required testing performed within 12 months of the last test date. Submit past test results, if found. Submit a current operability test result for the leak gauge. | |||||||
01/03/2018 | 5094 | SNC-B | 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. | Be sure to properly perform & document release detection inspections every month & no more than 35 days apart. Submit records for consecutive months, showing proper documentation is now being performed. | |||||||
No Discharges Found |