![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Fuel user/Non-retail | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9803789 | Latitude | 25° 47' 45.0252 | ||||||||
Name |
DAYTONA US PARTNERSHIP LP 11300 NW 25TH ST |
Longitude | 80° 22' 48.7287 | ||||||||
MIAMI, FL 33172 | LL Method | DPHO | |||||||||
Contact | DOYLE BOLTON | LL Status | REVIEWED | ||||||||
Phone | (786) 845-9600 | Status Date | 10/29/2024 | ||||||||
Account Owner Information | |||||||||||
Name | DAYTONA US PARTNERSHIP LP 11300 NW 25th Street Miami, FL 33172 |
Effective Date | 07/02/2020 | ||||||||
Contact | Doyle Bolton | ||||||||||
Phone | (305) 302-9033 | ||||||||||
DOYLE.BOLTON@TELEFONICA.COM | |||||||||||
Placard # / Date | 700394 - 08/02/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | DAYTONA US PARTNERSHIP LP 11300 NW 25th Street Miami, FL 33172 |
Effective Date | 07/02/2020 | ||||||||
Contact | Doyle Bolton | ||||||||||
Phone | (305) 302-9033 | ||||||||||
DOYLE.BOLTON@TELEFONICA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6500 | Emerg Generator Diesel (G) | 02/01/2001 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(I) Suction piping system (X) No piping associated w/tank |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6500 | Emerg Generator Diesel (G) | 02/01/2001 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(I) Suction piping system (X) No piping associated w/tank |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6500 | Emerg Generator Diesel (G) | 02/01/2001 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket |
(I) Suction piping system (X) No piping associated w/tank |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Emerg Generator Diesel (G) | 09/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 6500 | Emerg Generator Diesel (G) | 09/01/2011 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 6000 | Emerg Generator Diesel (G) | 11/01/2014 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 6000 | Emerg Generator Diesel (G) | 11/01/2014 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (K) AST containment (N) Flow shut-Off (P) Level gauges/alarms |
(D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
||||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 07/08/2020 | 07/08/2021 | ILLINOIS UNION INSURANCE COMPANY | ||||||||
INSURANCE | 03/11/2016 | 03/11/2017 | ACE | ||||||||
INSURANCE | 03/11/2015 | 03/11/2016 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2014 | 03/11/2015 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2013 | 03/11/2014 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2012 | 03/11/2012 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2012 | 03/11/2013 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2011 | 03/11/2011 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2009 | 03/11/2010 | ILLINOIS UNION | ||||||||
INSURANCE | 03/11/2008 | 03/11/2009 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/07/2006 | 03/16/2006 | IN-COMPLIANCE | PADRON, J | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/26/2005 | 02/02/2005 | IN-COMPLIANCE | PADRON, J | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/19/2003 | 09/23/2003 | IN-COMPLIANCE | SMITH, C | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 08/19/2003 | 08/20/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SMITH, C | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/12/2003 | 01/15/2004 | MINOR OUT-OF-COMPLIANCE | PADRON, J | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/16/2002 | 09/24/2002 | MINOR OUT-OF-COMPLIANCE | SMITH, C | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/14/2002 | 03/15/2002 | SMITH, C | 3/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/30/2002 | 02/07/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SMITH, C | 3/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 10/30/2024 | Major Out of Compliance | DEZAYAS_A_1 | 7/0 | Routine Compliance | ||||||
Letter | 10/30/2024 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 10/29/2024 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 09/26/2024 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 01/19/2021 | Satisfied | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Tracking | 01/19/2021 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 12/24/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 12/17/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 12/11/2020 | In Compliance | JACQUET_F_1 | 7/0 | Compliance Assistance | ||||||
Enforcement Referral | 08/05/2020 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 04/07/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Letter | 03/31/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 03/31/2020 | Major Out of Compliance | JACQUET_F_1 | 7/0 | Routine Compliance | ||||||
Electronic Communication | 03/24/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Phone Conversation | 03/24/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 02/27/2017 | Satisfied | CABRERA_VE_1 | Non-Compliance | |||||||
Site Inspection | 02/27/2017 | In Compliance | CABRERA_VE_1 | 7/0 | Non-Compliance | ||||||
Letter | 12/23/2016 | Satisfied | CABRERA_VE_1 | Non-Compliance | |||||||
Site Inspection | 12/23/2016 | Major Out of Compliance | CABRERA_VE_1 | 7/0 | Routine Compliance | ||||||
Electronic Communication | 12/23/2016 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Electronic Communication | 12/22/2016 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 01/21/2015 | In Compliance | LINCHETA_CR_1 | 7/0 | Routine Compliance | ||||||
Site Inspection | 01/21/2015 | In Compliance | RUNTE_C_3 | 2/0 | Installation | ||||||
Phone Conversation | 01/13/2015 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Site Inspection | 03/26/2013 | In Compliance | RUNTE_C_3 | 5/0 | Non-Compliance | ||||||
Letter | 02/26/2013 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 02/26/2013 | Minor Out of Compliance | RUNTE_C_3 | 5/0 | Routine Compliance | ||||||
Phone Conversation | 02/20/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Site Inspection | 01/25/2011 | In Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 12/10/2009 | In Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 10/17/2008 | In Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 09/24/2007 | In Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Site Inspection | 03/22/2007 | Minor Out of Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Letter | 03/22/2007 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/29/2024 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide a current and passing Annual Operability Test for Release Detection device of all (7) ASTs. | |||||||
10/29/2024 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide a current and passing Annual Operability Test for Overfill Protection device for all (7) ASTs. | |||||||
10/29/2024 | 7002 | Minor | 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Provide an updated FDEP Storage Tank Registration form with updated information for Sections A, B, and C. | |||||||
10/29/2024 | 7009 | SNC-B | 1.7 No financial responsibility instrument or expired instrument for < 180 days. | Provide a current Certificate of Financial Responsibility Pollution Liability Insurance. | |||||||
10/29/2024 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Provide the Monthly Maintenance Visual logs for the last 36 months. | |||||||
No Discharges Found |