![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Waterfront Fuel Storage | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 9803997 | Latitude | 28° 10' 23.298 | ||||||||
Name |
ANCLOTE VILLAGE MARINA 1029 BAILLIES BLUFF RD |
Longitude | 82° 47' 7.1525 | ||||||||
HOLIDAY, FL 34691-9747 | LL Method | DGPS | |||||||||
Contact | FELECIA ONGLEY | LL Status | REVIEWED | ||||||||
Phone | (727) 937-9737 | Status Date | 09/22/2003 | ||||||||
Account Owner Information | |||||||||||
Name | AC ANCLOTE VILLAGE MARINA, LLC 1029 BAILLIES BLUFF RD. HOLIDAY, FL 34691 |
Effective Date | 10/17/2019 | ||||||||
Contact | AUSTIN CAMERON | ||||||||||
Phone | (727) 415-2383 | ||||||||||
FELECIA@BLUFFCREEKMARINA.COM | |||||||||||
Placard # / Date | 705103 - 02/07/2025 | ||||||||||
Property Owner Information | |||||||||||
Name | AC ANCLOTE VILLAGE MARINA, LLC 1029 BAILLIES BLUFF RD. HOLIDAY, FL 34691 |
Effective Date | 10/17/2019 | ||||||||
Contact | AUSTIN CAMERON | ||||||||||
Phone | (727) 415-2383 | ||||||||||
FELECIA@BLUFFCREEKMARINA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 12/01/2001 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/21/2024 | 07/21/2025 | LLOYD'S UNDERWRITERS | ||||||||
INSURANCE | 07/21/2023 | 07/21/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/21/2022 | 07/21/2023 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/11/2018 | 07/11/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/11/2017 | 07/11/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/11/2016 | 07/11/2017 | ACE | ||||||||
INSURANCE | 07/11/2013 | 07/11/2014 | ACE | ||||||||
INSURANCE | 07/11/2011 | 07/11/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/11/2010 | 07/11/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/11/2009 | 07/11/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/08/2006 | IN-COMPLIANCE | CONDOLEON, G J | 1/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/09/2004 | 01/31/2005 | RODRIGUEZ,IVAN | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 09/23/2004 | 10/04/2004 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 01/06/2004 | 01/06/2004 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/10/2003 | 09/26/2003 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 1/0 | COMPLIANCE ASSURANCE | |||||
DPRI | 11/01/2002 | 11/14/2002 | IN-COMPLIANCE | HANSEN, DAVID | 1/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 10/14/2002 | 10/15/2002 | IN-COMPLIANCE | HANSEN, DAVID | 1/0 | COMPLIANCE ASSURANCE | |||||
DPRI | 05/16/2002 | 05/20/2002 | IN-COMPLIANCE | HANSEN, DAVID | 1/0 | TERMINAL FACILITY PROJECT | |||||
TIN | 05/16/2002 | 05/20/2002 | IN-COMPLIANCE | HANSEN, DAVID | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/12/2025 | Major Out of Compliance | MUSLIC_A_1 | 1/0 | Routine Compliance | ||||||
Letter | 02/12/2025 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Electronic Communication | 12/04/2024 | Satisfied | REIS_A | Enforcement | |||||||
Electronic Communication | 12/04/2024 | Satisfied | REIS_A | Enforcement | |||||||
Meeting | 09/06/2024 | Satisfied | REIS_A | Enforcement | |||||||
Record Document | 07/11/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Site Inspection | 07/09/2024 | Major Out of Compliance | MUSLIC_A_1 | 1/0 | Component Installation | ||||||
Letter | 07/09/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Record Document | 07/03/2024 | Satisfied | MUSLIC_A_1 | Component Closure | |||||||
Site Inspection | 06/28/2024 | Major Out of Compliance | MUSLIC_A_1 | 1/0 | Component Closure | ||||||
Letter | 06/28/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Letter | 04/25/2024 | Satisfied | REIS_A | Enforcement | |||||||
Enforcement Referral | 06/19/2023 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 09/01/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 09/01/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 09/01/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 09/01/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 09/01/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 07/25/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Meeting | 04/11/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 08/17/2021 | Major Out of Compliance | JUARISTIC_GK_1 | 1/0 | Routine Compliance | ||||||
Record Document | 08/17/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 08/17/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 08/04/2021 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/12/2021 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Letter | 01/25/2019 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 01/25/2019 | Major Out of Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 01/09/2019 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 08/29/2017 | In Compliance | STRAUSS_RH_1 | 1/0 | Compliance Assistance | ||||||
Letter | 08/29/2017 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Record Document | 12/07/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 09/30/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 09/30/2016 | Major Out of Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 09/12/2016 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Record Document | 10/01/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 07/07/2014 | Minor Out of Compliance | STRAUSS_RH_1 | 1/0 | Routine Compliance | ||||||
Letter | 07/07/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 08/31/2011 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Installation | ||||||
Site Inspection | 08/30/2011 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Closure | ||||||
Site Inspection | 08/30/2011 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 08/20/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 08/20/2010 | Major Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Record Document | 08/20/2010 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 09/29/2009 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Record Document | 03/13/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 08/28/2008 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 08/28/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 07/30/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 07/30/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
08/17/2021 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Submit two consecutive months of release detection to this office. | |||||||
08/17/2021 | 7064 | Minor | 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | At a minimum, the visual inspections should include the tank and piping exterior, the spill containment unit, tank interstice, piping transition sump-the monitoring point for the double-walled piping from the seawall to the dispensers and from the piping transition sump back to the tank; dispensers components. Provide the next two consecutive months of release detection/monthly visual inspections to this office. Please ensure the status of each component is accurately documented. | |||||||
08/17/2021 | 7052 | SNC-B | 1.3 No interstitial integrity test on piping in contact with the soil before being placed in service. | Provide the integrity test results for the new piping. | |||||||
No Discharges Found |