![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Central | Type | Retail Station | ||||
County | Lake | Status | OPEN | ||||
ID | 9804131 | Latitude | 28° 30' 54.4212 | ||||
Name |
CIRCLE K #5961 11525 KING FISHER |
Longitude | 81° 45' 47.8108 | ||||
CLERMONT, FL 34711 | LL Method | DPHO | |||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||
Phone | (919) 774-6700 | Status Date | 09/18/2023 | ||||
Account Owner Information | |||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 08/15/2001 | ||||
Contact | IRA LEWIS | ||||||
Phone | (423) 400-2480 | ||||||
ILEWIS@CIRCLEK.COM | |||||||
Placard # / Date | 698075 - 06/29/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 12250 | Unleaded Gas (B) | 07/01/2001 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 12250 | Unleaded Gas (B) | 07/01/2001 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 10075 | Vehicular Diesel (D) | 07/01/2001 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
GUARANTEE | 04/28/2024 | 08/26/2025 | |||||
GUARANTEE | 04/24/2022 | 08/21/2023 | |||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 03/14/2006 | 03/19/2006 | IN-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes MLLD & VR/SENSOR CERT. DONE 3/06. | |||||||
IRFR | 11/15/2005 | 12/05/2005 | BOWERS | 0/1 | DISCHARGE PROJECT | ||
Completion Notes INF RECEIVED FOR APPARENT VISUAL CRACK IN SPILL BUCKET. BUCKET TESTED AND PASSED. NO DISCHARGE. | |||||||
TCI | 03/14/2005 | 03/21/2005 | IN-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes MLLD - 2/24/05, VR/SENSOR CERT. - 2/24/05. "LIQUID STATUS" AS RD. | |||||||
TCR | 05/20/2004 | 05/26/2004 | IN-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes D.L.S REPAIRED, HYDRO OK ON 5/20/04. LIQUID REMOVED FROM SUMP. | |||||||
IRFR | 04/27/2004 | 04/27/2004 | BOWERS | 0/3 | DISCHARGE PROJECT | ||
Completion Notes RECEIVED INF DATED 4/13/04 FOR FAILED HYDRO ON DLS. RECEIVED LETTER STATING NO DISCHARGE OCCURRED IN CONJUNCTION WITH INCIDENT. | |||||||
TCQA | 04/01/2004 | 04/14/2004 | JOHNSON_CJ | 0/0 | COMPLIANCE ASSURANCE | ||
TCI | 03/17/2004 | 03/22/2004 | MINOR OUT-OF-COMPLIANCE | COX | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes MLLD TESTED 2/2/04, SENSOR CERT. 5/8/03 & 2/2/04 | |||||||
LTR | 05/13/2003 | 05/14/2003 | BOWERS | 0/3 | COMPLIANCE ASSURANCE | ||
Completion Notes RECEIVED MLLD RESULTS. | |||||||
TCI | 03/25/2003 | 03/27/2003 | MINOR OUT-OF-COMPLIANCE | BOWERS | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes SENSOR CERT. 10/5/02, MLLD 5/8/03. DW FIBERGLASS PIPING | |||||||
IRFR | 02/05/2003 | 02/25/2003 | BOWERS | 0/1 | DISCHARGE PROJECT | ||
Completion Notes INF RECEIVED FOR DIESEL INTERSTITIAL ALARM. ORANGE PETRO. PERFORMED TEST ON PROBE AND REPLACED, CLEARED ALARM. | |||||||
TIN | 10/30/2001 | 11/01/2001 | IN-COMPLIANCE | BOWERS/COX | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes NEW INSTALL OF 3 UST'S. | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Electronic Communication | 05/05/2025 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||
Site Inspection | 05/05/2025 | Minor Out of Compliance | KIDDER_MS_1 | 0/3 | Compliance Assistance | ||
Letter | 05/05/2025 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||
Electronic Communication | 04/28/2025 | Satisfied | KIDDER_MS_1 | Component Closure | |||
Letter | 03/11/2025 | Satisfied | CHANCY_A | Enforcement | |||
Enforcement Referral | 06/21/2024 | Accepted | GREGORY_JW_1 | Enforcement | |||
Electronic Communication | 03/01/2024 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||
Site Inspection | 08/03/2023 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Letter | 08/03/2023 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Electronic Communication | 07/24/2023 | Satisfied | COX_CD_1 | Routine Compliance | |||
Electronic Communication | 02/25/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Letter | 02/25/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Electronic Communication | 02/24/2022 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Site Inspection | 09/23/2021 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Letter | 09/23/2021 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Electronic Communication | 09/13/2021 | Satisfied | COX_CD_1 | Routine Compliance | |||
Electronic Communication | 06/29/2021 | Satisfied | COX_CD_1 | Routine Compliance | |||
Electronic Communication | 06/15/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Document Management | 06/15/2021 | Satisfied | BECKER_GT_1 | Incident | |||
Site Inspection | 02/05/2021 | Minor Out of Compliance | BECKER_GT_1 | 0/1 | Compliance Assistance | ||
Electronic Communication | 02/05/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Letter | 02/05/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/20/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/19/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/13/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/13/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/13/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/13/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/13/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/12/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 01/12/2021 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 09/10/2020 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 09/10/2020 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Electronic Communication | 06/12/2020 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||
Document Management | 06/12/2020 | Satisfied | COX_CD_1 | Incident | |||
Incident | 06/12/2020 | Has not led to Discharge | COX_CD_1 | Incident | |||
Incident | 10/04/2019 | Has not led to Discharge | COX_CD_1 | Incident | |||
Document Management | 10/04/2019 | Satisfied | COX_CD_1 | Incident | |||
Electronic Communication | 10/04/2019 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Letter | 10/04/2019 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Letter | 09/09/2019 | Satisfied | COX_CD_1 | Compliance Assistance | |||
Site Inspection | 09/09/2019 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Electronic Communication | 08/07/2019 | Satisfied | COX_CD_1 | Routine Compliance | |||
Incident | 01/05/2018 | Has not led to Discharge | COX_CD_1 | Incident | |||
Issue Document | 11/16/2017 | Satisfied | COX_CD_1 | Routine Compliance | |||
Record Document | 11/16/2017 | Satisfied | COX_CD_1 | Routine Compliance | |||
Site Inspection | 10/19/2017 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Letter | 04/22/2016 | Satisfied | COX_CD_1 | Non-Compliance | |||
Site Inspection | 03/30/2016 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Electronic Communication | 03/21/2016 | Satisfied | COX_CD_1 | Routine Compliance | |||
Document Management | 07/01/2014 | Complete | BECKER_GT_1 | Incident | |||
Incident | 07/01/2014 | Has not led to Discharge | BECKER_GT_1 | Incident | |||
Site Inspection | 06/11/2014 | In Compliance | COX_CD_1 | 0/3 | Complaint | ||
Complaint | 06/11/2014 | Satisfied | COX_CD_1 | Complaint | |||
Site Inspection | 05/28/2014 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Site Inspection | 08/14/2013 | In Compliance | COX_CD_1 | 0/3 | Non-Compliance | ||
Letter | 06/25/2013 | Satisfied | COX_CD_1 | Non-Compliance | |||
Site Inspection | 06/25/2013 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Emergency Preparedness Information | 06/25/2013 | Satisfied | COX_CD_1 | Routine Compliance | |||
Site Inspection | 06/05/2012 | In Compliance | COX_CD_1 | 0/3 | Installation | ||
TCAR | 02/28/2012 | Satisfied | COX_CD_1 | Closure | |||
Letter | 02/28/2012 | Satisfied | COX_CD_1 | Closure | |||
Site Inspection | 02/22/2012 | Minor Out of Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Letter | 02/22/2012 | Satisfied | COX_CD_1 | Non-Compliance | |||
Incident | 02/08/2012 | Has not led to Discharge | COX_CD_1 | Incident | |||
Site Inspection | 02/06/2012 | In Compliance | COX_CD_1 | 0/3 | Closure | ||
Site Inspection | 02/06/2012 | In Compliance | COX_CD_1 | 0/3 | Installation | ||
Meeting | 06/30/2011 | Satisfied | COX_CD_1 | Closure | |||
Letter | 06/09/2011 | Satisfied | COX_CD_1 | Discharge | |||
Discharge Reporting | 05/13/2011 | Satisfied | COX_CD_1 | Discharge | |||
TCAR | 05/05/2011 | Satisfied | COX_CD_1 | Closure | |||
Record Document | 04/19/2011 | Satisfied | COX_CD_1 | Discharge | |||
Letter | 04/19/2011 | Satisfied | COX_CD_1 | Non-Compliance | |||
Site Inspection | 04/15/2011 | In Compliance | COX_CD_1 | 0/3 | Non-Compliance | ||
Letter | 04/13/2011 | Satisfied | COX_CD_1 | Non-Compliance | |||
Site Inspection | 04/13/2011 | Minor Out of Compliance | COX_CD_1 | 0/3 | Closure | ||
Site Inspection | 04/13/2011 | Minor Out of Compliance | COX_CD_1 | 0/3 | Installation | ||
Letter | 04/08/2011 | Satisfied | COX_CD_1 | Non-Compliance | |||
Incident | 04/08/2011 | Has not led to Discharge | COX_CD_1 | Incident | |||
Site Inspection | 04/07/2011 | Minor Out of Compliance | COX_CD_1 | 0/3 | Non-Compliance | ||
Emergency Preparedness Information | 03/31/2011 | Satisfied | ZIMMERMAN_RA_1 | Routine Compliance | |||
Letter | 03/21/2011 | Satisfied | COX_CD_1 | Non-Compliance | |||
Site Inspection | 03/03/2011 | Minor Out of Compliance | COX_CD_1 | 0/3 | Non-Compliance | ||
Letter | 02/24/2011 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Site Inspection | 02/24/2011 | Minor Out of Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||
Site Inspection | 02/17/2010 | In Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||
Site Inspection | 04/30/2009 | In Compliance | ZIMMERMAN_RA_1 | 0/3 | Non-Compliance | ||
Record Document | 04/30/2009 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Letter | 03/25/2009 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Site Inspection | 03/25/2009 | Minor Out of Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||
Record Document | 05/12/2008 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Phone Conversation | 05/12/2008 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Site Inspection | 03/17/2008 | Minor Out of Compliance | ZIMMERMAN_RA_1 | 0/3 | Routine Compliance | ||
Letter | 03/17/2008 | Satisfied | ZIMMERMAN_RA_1 | Non-Compliance | |||
Site Inspection | 03/15/2007 | In Compliance | COX_CD_1 | 0/3 | Routine Compliance | ||
Emergency Preparedness Information | 02/12/2007 | Satisfied | ZIMMERMAN_RA_1 | Routine Compliance | |||
Emergency Preparedness Information | 09/27/2006 | Satisfied | ZIMMERMAN_RA_1 | Routine Compliance | |||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
04/29/2025 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Provide an INF, and determine whether or not a discharge has occurred. Premium spill bucket shall be replaced if repairs cannot be made. | |||
08/03/2023 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Clean and re-coat all of the components in the regular and premium STP sumps. Create a better seal for the cap of the ATG ports to prevent gasoline fumes in the sump. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
04/14/2011 | COMPLETED | 45 | |||||