DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District South   Type    Retail Station
 
County Lee   Status    OPEN
 
ID 9804487   Latitude    26° 37' 59.2631
 
Name 7-ELEVEN STORE #39578
9660 HWY 82
Longitude    81° 47' 56.9389
  FORT MYERS, FL 33905 LL Method    DPHO
 
Contact DAVID PETERSEN   LL Status    REVIEWED
 
Phone (407) 403-2995   Status Date    01/05/2004
 
Account Owner Information
 
Name 7-ELEVEN INC.
PO BOX 711
Dallas, TX 75221-711
Effective Date    11/13/2020
 
Contact DAVID PETERSEN | MILEI AVILES | JENNIFER DART
 
Phone (407) 403-2995
 
Email DAVID.PETERSEN@7-11.COM
  Placard # / Date    690278 - 06/18/2024
Property Owner Information
 
Name FORT MYERS PETROLEUM, LLC
9660 STATE ROAD 82
FORT MYERS, FL 33905-5401
Effective Date    11/13/2020
 
Contact DAVID PETERSEN
 
Phone (407) 403-2995
 
Email DAVID.PETERSEN@7-11.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
1 15000 Unleaded Gas (B) 10/01/2001 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
2 12000 Unleaded Gas (B) 10/01/2001 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
3 12000 Vehicular Diesel (D) 10/01/2001 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   12/18/2024 12/18/2025 IRONSHORE SPECIALTY INSURANCE COMPANY
INSURANCE   12/18/2022 12/18/2023 IRONSHORE SPECIALTY INSURANCE COMPANY
INSURANCE   09/03/2020 09/03/2021 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/03/2019 09/03/2020 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/03/2018 09/03/2019 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/03/2017 09/03/2018 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/03/2016 09/03/2017 COMMERCE & INDUSTRY
INSURANCE   09/03/2015 09/03/2016 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   09/03/2013 09/03/2014 COMMERCE & INDUSTRY
INSURANCE   09/03/2012 09/03/2013 COMMERCE & INDUSTRY
INSURANCE   09/03/2011 09/03/2012 COMMERCE & INDUSTRY
INSURANCE   09/03/2010 09/03/2011 COMMERCE & INDUSTRY
INSURANCE   10/14/2004 10/14/2007 COMMERCE & INDUSTRY
INSURANCE   09/03/1991 09/03/2010 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
RRBD 01/17/2006 01/20/2006 S. JOHNSON 0/0 DISCHARGE PROJECT
 
 Completion Notes ADAMS TANK CLEANED AND CHECKED FOR LEAKS ON THE 11TH. NO DISCOVERED. RETURNED AGAIN ON THE 12TH. APPEARS TO HAVE FOUND SMALL LEAK AROUND PIPE. RETURNED AGAIN ON THE 17TH. NO PRODUCT IN SUMP. TANKNOLOGY TESTED LINES AND LLD ALL PASSED.
 
NCLI 01/13/2006 01/13/2006 S. JOHNSON 0/0 COMPLIANCE ASSURANCE
 
TCI 01/11/2006 01/13/2006 MINOR OUT-OF-COMPLIANCE S. JOHNSON 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING - DW ENVIRON RD - MONTHLY VISUALS/LIQUID STATUS NOTE: 1-2 GALLONS OF PRODUCT IN PREMIUM STP. INF SUBMITTED. DIESEL SPILL BUCKET IS WITHIN 3 FEET OF THE DIESEL DISPENSER. NEXT TO BOTH IS LID WITH NATIVE SOIL BENEATH IT. RUNOFF FROM DIPENSER AN
 
IRFR 01/11/2006 01/13/2006 S. JOHNSON 0/0 DISCHARGE PROJECT
 
 Completion Notes PRODUCT DISCOVERED DURING COMPLIANCE INSPECTION. 1-2 GALLONS IN PREMIUM STP. INF SUBMITTED AND ADAMS TANK AND LIFT NOTIFIED.
 
TCR 06/16/2005 06/22/2005 IN-COMPLIANCE S. JOHNSON 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes FACILITY HAS PUMPED OUT ALL SUMPS. VERIFIED ALL SENSORS WERE OPERATIONAL BY FLIPPING THEM UPSIDE DOWN. DIESEL SUMP STILL GETTING WATER INTRUSION. GASKET BAD AROUND LID. FACILITY ORDERED NEW GASKET. WATER BELOW SECONDARY PIPING.
 
CWOE 06/16/2005 06/22/2005 S. JOHNSON 0/0 COMPLIANCE ASSURANCE
 
NCLI 02/28/2005 02/28/2005 S JOHNSON 0/3 COMPLIANCE ASSURANCE
 
TCR 02/24/2005 02/24/2005 SIGNIFICANT OUT-OF-COMPLIANCE S JOHNSON 0/3 COMPLIANCE ASSURANCE
 
NCLI 10/19/2004 10/19/2004 S JOHNSON 0/0 COMPLIANCE ASSURANCE
 
TCI 10/19/2004 10/19/2004 SIGNIFICANT OUT-OF-COMPLIANCE S JOHNSON/J SAIYA 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING- DW ENVIRON RDRL- MONTHLY VISUALS
 
TCR 11/19/2003 11/20/2003 IN-COMPLIANCE S. JOHNSON 0/3 COMPLIANCE ASSURANCE
 
TCI 10/07/2003 10/07/2003 MINOR OUT-OF-COMPLIANCE S. JOHNSON 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING - ENVIRON GEOFLEX RDRL - MONTHLY VISUALS AND LIQUID STATUS
 
TCR 10/25/2002 10/30/2002 IN-COMPLIANCE DEMACK,P 0/3 COMPLIANCE ASSURANCE
 
TCI 09/16/2002 09/27/2002 SIGNIFICANT OUT-OF-COMPLIANCE DEMACK,P 0/3 COMPLIANCE ASSURANCE
 
TIN 10/02/2001 09/27/2002 IN-COMPLIANCE DEMACK,P 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes NEW INSTALLATION OF 3 DW GLASS STEEL II UST'S
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 01/31/2025 Major Out of Compliance KLEINMANN_K_1 0/3 Routine Compliance
 
Electronic Communication 01/30/2025 Satisfied KLEINMANN_K_1 Routine Compliance
 
Letter 06/09/2023 Satisfied KLEINMANN_K_1 Routine Compliance
 
Site Inspection 05/18/2023 In Compliance KLEINMANN_K_1 0/3 Routine Compliance
 
Electronic Communication 05/18/2023 Satisfied KLEINMANN_K_1 Routine Compliance
 
Letter 06/03/2022 Satisfied KLEINMANN_K_1 Compliance Assistance
 
Site Inspection 09/30/2020 Major Out of Compliance SAUTTER_MA_2 0/3 Routine Compliance
 
Site Inspection 03/29/2018 In Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Record Document 06/08/2016 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Enforcement Tracking 01/29/2016 Closed With Enforcement HERNANDEZ_N Enforcement
 
Letter 12/31/2015 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Site Inspection 12/31/2015 Major Out of Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Emergency Preparedness Information 12/02/2013 Satisfied ZIMMERMAN_CA_1 Routine Compliance
 
Site Inspection 12/02/2013 In Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Site Inspection 02/01/2013 In Compliance JOHNSON_SG_1 0/3 Non-Compliance
 
Site Inspection 11/21/2012 Major Out of Compliance JOHNSON_SG_1 0/3 Routine Compliance
 
Letter 11/21/2012 Satisfied JOHNSON_SG_1 Non-Compliance
 
Issue Document 09/10/2012 Satisfied CERQUERA_L Enforcement
 
Issue Document 09/10/2012 Satisfied CERQUERA_L Enforcement
 
Phone Conversation 08/01/2012 Satisfied CERQUERA_L Enforcement
 
Issue Document 07/27/2012 Satisfied CERQUERA_L Enforcement
 
Phone Conversation 07/24/2012 Satisfied CERQUERA_L Enforcement
 
Record Document 07/24/2012 Satisfied CERQUERA_L Enforcement
 
Electronic Communication 06/11/2012 Satisfied CERQUERA_L Enforcement
 
Electronic Communication 05/22/2012 Satisfied CERQUERA_L Enforcement
 
Issue Document 05/22/2012 Satisfied CERQUERA_L Enforcement
 
Letter 12/12/2011 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Site Inspection 12/12/2011 Minor Out of Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Record Document 05/20/2011 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 12/03/2010 Minor Out of Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Letter 12/03/2010 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Record Document 11/24/2010 Satisfied JOHNSON_SG_1 Closure
 
Letter 11/24/2010 Satisfied JOHNSON_SG_1 Closure
 
Discharge Reporting 11/15/2010 Satisfied JOHNSON_SG_1 Discharge
 
Document Management 11/15/2010 Complete JOHNSON_SG_1 Discharge
 
Letter 11/15/2010 Satisfied JOHNSON_SG_1 Discharge
 
Incident 10/29/2010 Has not led to Discharge JOHNSON_SG_1 Incident
 
Letter 10/22/2010 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 10/22/2010 In Compliance JOHNSON_SG_1 0/3 Installation
 
Document Management 10/22/2010 Complete JOHNSON_SG_1 Incident
 
Site Inspection 10/22/2010 Minor Out of Compliance JOHNSON_SG_1 0/3 Closure
 
Discharge Reporting 03/31/2010 Satisfied JOHNSON_SG_1 Discharge
 
Document Management 03/29/2010 Complete JOHNSON_SG_1 Discharge
 
Site Inspection 12/17/2009 In Compliance ZIMMERMAN_CA_1 0/3 Routine Compliance
 
Enforcement Referral 11/23/2009 Accepted MURPHY_EM Enforcement
 
Issue Document 03/19/2009 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 03/13/2009 Major Out of Compliance JOHNSON_SG_1 0/3 Non-Compliance
 
Letter 12/12/2008 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 12/12/2008 Major Out of Compliance JOHNSON_SG_1 0/3 Routine Compliance
 
Record Document 02/29/2008 Satisfied JOHNSON_SG_1 Non-Compliance
 
Record Document 02/08/2008 Satisfied JOHNSON_SG_1 Non-Compliance
 
Letter 02/01/2008 Satisfied ZIMMERMAN_CA_1 Non-Compliance
 
Site Inspection 01/31/2008 Major Out of Compliance JOHNSON_SG_1 0/3 Routine Compliance
 
Record Document 07/17/2007 Satisfied JOHNSON_BW_1 Closure
 
Record Document 05/30/2007 Satisfied JOHNSON_SG_1 Discharge
 
Emergency Preparedness Information 05/22/2007 Satisfied ZIMMERMAN_CA_1 Routine Compliance
 
Emergency Preparedness Information 05/21/2007 Satisfied ZIMMERMAN_CA_1 Routine Compliance
 
Letter 03/02/2007 Satisfied JOHNSON_SG_1 Non-Compliance
 
Site Inspection 02/28/2007 Minor Out of Compliance JOHNSON_SG_1 0/3 Routine Compliance
 
Emergency Preparedness Information 02/13/2007 Satisfied JOHNSON_SG_1 Routine Compliance
 
Emergency Preparedness Information 09/28/2006 Satisfied JOHNSON_SG_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/30/2025 6065 SNC-B 4.3 Damaged system not taken out of service or out of operation until repair is made. Replace nozzle and send documentation of repairs.
 
01/30/2025 6002 Minor 2.1 Operator Training records not available. During hours of operation, facilities must have at least one certified operator (either a Class A, Class B, or Class C operator) present at the facility. At least one employee per shift needs to complete the training within 15 days and keep a copy of the certificate on site. Train employees as needed to provide the required coverage.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
11/02/2010   COMPLETED 50
 
05/25/2007   COMPLETED 45