![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 9804977 | Latitude | 30° 11' 25.0706 | ||||||||
Name |
CHEVRON FOOD MART-PC 1409N US HWY 231 |
Longitude | 85° 38' 24.5335 | ||||||||
PANAMA CITY, FL 32401 | LL Method | DPHO | |||||||||
Contact | PAUL BAISCH | LL Status | REVIEWED | ||||||||
Phone | (850) 774-5172 | Status Date | 02/07/2023 | ||||||||
Account Owner Information | |||||||||||
Name | NORTH US 231 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Placard # / Date | 699093 - 07/09/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | NORTH US 231 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 07/01/2002 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 07/01/2002 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/31/2023 | 12/31/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2021 | 12/30/2022 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2020 | 12/31/2021 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2017 | 12/31/2018 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2015 | 12/31/2016 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2013 | 12/31/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 12/31/2012 | 12/31/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2012 | 12/31/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2011 | 04/15/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2007 | 11/11/2008 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/18/2006 | 01/19/2006 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/28/2005 | 02/01/2005 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/20/2005 | 01/24/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: APT DW | |||||||||||
TCR | 04/27/2004 | 05/04/2004 | IN-COMPLIANCE | KHAN | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: APT DW | |||||||||||
RRBD | 04/22/2004 | 04/23/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/13/2004 | 02/16/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: APT DW | |||||||||||
TIN | 12/20/2002 | 01/02/2003 | IN-COMPLIANCE | KHAN/PINKOVSKY | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 03/25/2025 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 03/11/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Enforcement Tracking | 03/04/2025 | Closed With Enforcement | BRISTOL_S | Enforcement | |||||||
Letter | 01/07/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 12/20/2024 | Major Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Meeting | 12/13/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Electronic Communication | 12/13/2024 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 11/25/2024 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
TCAR | 11/22/2024 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Document Management | 11/22/2024 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Electronic Communication | 06/06/2024 | Satisfied | BONDS_M | Enforcement | |||||||
Electronic Communication | 06/06/2024 | Satisfied | BONDS_M | Enforcement | |||||||
Electronic Communication | 06/14/2023 | Satisfied | MATHERLY_H | Enforcement | |||||||
Letter | 04/05/2023 | Satisfied | MATHERLY_H | Enforcement | |||||||
Enforcement Referral | 03/22/2023 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 12/22/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 12/21/2022 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/21/2022 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Issue Document | 03/07/2022 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Issue Document | 02/14/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 02/14/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/10/2022 | In Compliance | KHAN_MR_1 | 0/2 | Component Installation | ||||||
TCAR | 02/08/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 02/08/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 02/08/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 02/08/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 01/11/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 01/11/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 01/11/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 01/10/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 01/10/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 05/03/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 05/03/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 04/29/2021 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 03/16/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 02/01/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 02/01/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 01/29/2021 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 01/14/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 08/19/2019 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 05/22/2019 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Site Inspection | 10/23/2018 | Minor Out of Compliance | BROCK_SN_1 | 0/2 | Complaint | ||||||
Issue Document | 10/01/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 10/01/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/28/2018 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Document Management | 08/16/2018 | Satisfied | KHAN_MR_1 | Discharge | |||||||
Discharge Reporting | 08/15/2018 | Satisfied | KHAN_MR_1 | Discharge | |||||||
Letter | 08/13/2018 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Site Inspection | 08/13/2018 | In Compliance | KHAN_MR_1 | 0/2 | Discharge | ||||||
Record Document | 06/15/2016 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 03/28/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Letter | 02/29/2016 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 02/26/2016 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/25/2014 | Satisfied | DAURIA_KL_1 | Closure | |||||||
TCAR | 04/25/2014 | Satisfied | DAURIA_KL_1 | Closure | |||||||
Record Document | 04/24/2014 | Satisfied | FOXWORTH_S_1 | Closure | |||||||
Document Management | 04/21/2014 | Complete | DAURIA_KL_1 | Closure | |||||||
Enforcement Tracking | 02/28/2014 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Site Inspection | 02/28/2014 | In Compliance | KHAN_MR_1 | 0/2 | Installation | ||||||
Site Inspection | 02/28/2014 | In Compliance | KHAN_MR_1 | 0/2 | Closure | ||||||
Letter | 01/10/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/10/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 01/10/2014 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Enforcement Referral | 10/30/2013 | Cancelled | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 10/15/2013 | Satisfied | BRISTOL_S | Enforcement | |||||||
Electronic Communication | 09/09/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 07/24/2013 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 07/23/2013 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Non-Compliance | ||||||
Record Document | 06/11/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 01/24/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/21/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 12/21/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/21/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/19/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 03/15/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/15/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 08/24/2011 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Site Inspection | 08/24/2011 | In Compliance | GILLMAN_M | 0/2 | Enforcement | ||||||
Site Inspection | 08/23/2011 | In Compliance | BRAZILE_DO_1 | 0/2 | Non-Compliance | ||||||
Document Management | 07/03/2011 | Complete | BRAZILE_DO_1 | Closure | |||||||
Document Management | 06/06/2011 | Complete | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 05/14/2011 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Closure | ||||||
Site Inspection | 05/14/2011 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Installation | ||||||
Record Document | 10/29/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Electronic Communication | 10/29/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Phone Conversation | 10/29/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Letter | 10/11/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 09/24/2010 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 09/14/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Record Document | 09/07/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Discharge Reporting | 06/18/2010 | Satisfied | BRAZILE_DO_1 | Discharge | |||||||
Letter | 06/17/2010 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Document Management | 06/17/2010 | Complete | BRAZILE_DO_1 | Discharge | |||||||
Enforcement Referral | 06/17/2010 | Accepted | BRISTOL_S | Enforcement | |||||||
TCAR | 06/17/2010 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Site Inspection | 06/16/2010 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Discharge | ||||||
Letter | 06/16/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Letter | 06/16/2010 | Satisfied | PIERCE_LL_1 | Discharge | |||||||
Site Inspection | 02/22/2010 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/22/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 12/02/2009 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||||||
Site Inspection | 11/19/2009 | In Compliance | BRAZILE_DO_1 | 0/2 | Closure | ||||||
Record Document | 01/06/2009 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 11/07/2008 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Enforcement Referral | 11/03/2008 | Accepted | GILLMAN_M | Enforcement | |||||||
Site Inspection | 10/30/2008 | Minor Out of Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/30/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Record Document | 10/24/2008 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 10/23/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 10/23/2008 | In Compliance | KHAN_MR_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 04/14/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Letter | 01/17/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 12/07/2007 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/21/2007 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 04/04/2007 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Record Document | 06/23/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/20/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified contractor provide completed testing that shows the vacuum testing conducted passed for the double wall spill buckets. | |||||||
12/20/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | A certified contractor must properly cap and seal electrical wires and conduits to prevent potential hazards posed by exposed wires. Submit associated information of detailed work invoice and photographs to Daniel.Gartin@flhealth.gov for resolving this violation. | |||||||
12/20/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have the premium spill bucket gauge replaced by a certified contractor and submit associated testing of the gauge and a vacuum integrity testing of the premium spill bucket to Daniel.Gartin@flhealth.gov. | |||||||
12/20/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Have the registration updated to tank 1 and tank 2 to the proper content code of the fuel present in the tank. Send information to Daniel.Gartin@flhealth.gov showing the registration information is updated. | |||||||
12/19/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The liquid needs to be removed from the interstitial space of the premium and diesel spill bucket and determine if the bucket's integrity is compromised. Submit the integrity testing of the premium and diesel double wall spill bucket with photograph and the work invoice detailing the source of the liquid intrusion to Daniel.Gartin@flhealth.gov | |||||||
12/19/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove the liquid from the double wall spill buckets and STP sump and submit a detailed work invoice or photograph showing liquid has been removed to Daniel.Gartin@flhealth.gov | |||||||
12/18/2024 | 6002 | Minor | 2.1 Operator Training records not available. | During the operation hours of a facility, at least a Class A, Class B, or Class C operator must be present during normal course of business. Provide Class C training to all individuals that may be left on shift and provide the copies of the Class C Operator Training Certificate to Daniel.Gartin@flhealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
07/02/2018 | COMPLETED | ||||||||||
12/06/2009 | COMPLETED | 30 | |||||||||