![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/24/2025 Last Data Refresh: 04/23/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 9805835 | Latitude | 30° 17' 58.847 | ||||||||
Name |
SUNSHINE FOOD MART #181 1287 LANE AVE S |
Longitude | 81° 45' 6.216 | ||||||||
JACKSONVILLE, FL 32205-6235 | LL Method | DGPS | |||||||||
Contact | JOE FIELDS X117 | LL Status | REVIEWED | ||||||||
Phone | (321) 631-0245 | Status Date | 12/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | M & R UNITED INC 402 HIGH POINT DR #101 COCOA, FL 32926 |
Effective Date | 10/20/2003 | ||||||||
Contact | JOE FIELDS | ||||||||||
Phone | (321) 631-0245 | ||||||||||
JOE@SOUTHEASTPETRO.COM | |||||||||||
Placard # / Date | 685502 - 06/07/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | M & R UNITED INC 402 HIGH POINT DR #101 COCOA, FL 32926 |
Effective Date | 10/20/2003 | ||||||||
Contact | JOE FIELDS | ||||||||||
Phone | (321) 631-0245 | ||||||||||
JOE@SOUTHEASTPETRO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Unleaded Gas (B) | 05/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Vehicular Diesel (D) | 05/01/2003 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/28/2023 | 07/28/2024 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/28/2022 | 07/28/2023 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/28/2021 | 07/28/2022 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/28/2020 | 07/28/2021 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/13/2019 | 07/13/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 07/13/2018 | 07/13/2019 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 07/13/2017 | 07/13/2018 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 07/13/2016 | 07/13/2017 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 08/01/2015 | 08/01/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/01/2015 | 08/01/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/01/2014 | 08/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/01/2013 | 08/01/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/01/2012 | 08/01/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/08/2010 | 09/08/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/08/2009 | 09/08/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/08/2008 | 09/08/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/21/2006 | 03/01/2006 | IN-COMPLIANCE | TORSANKO | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 02/16/2005 | 02/17/2005 | IN-COMPLIANCE | BORISADE | 0/2 | COMPLIANCE ASSURANCE | |||||
TCQA | 04/08/2004 | 06/01/2004 | IN-COMPLIANCE | LUBINSKI_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes QA INSPECTION CONDUCTED FOR ANNUAL PROGRAM REVIEW. | |||||||||||
TCI | 01/15/2004 | 01/16/2004 | IN-COMPLIANCE | HOLLOWAY_R | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 09/26/2003 | 10/01/2003 | IN-COMPLIANCE | CARROLL_A | 0/2 | COMPLIANCE ASSURANCE | |||||
SV | 08/14/2003 | 09/14/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONCRETE & STORE | |||||||||||
SV | 08/12/2003 | 09/14/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONCRETE DRIVE | |||||||||||
SV | 07/31/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PREPARING TO POUR CONCRETE | |||||||||||
SV | 07/29/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ELECTRICAL & STORE | |||||||||||
SV | 07/28/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ELECT & PAVEMENT/GRADING | |||||||||||
SV | 07/22/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ELECTRICAL | |||||||||||
SV | 07/16/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CANOPY & ELECTRICAL | |||||||||||
SV | 06/30/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BUILDING | |||||||||||
SV | 06/26/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BUILDING | |||||||||||
SV | 06/25/2003 | 01/05/2004 | CARROLL_A | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BUILDING | |||||||||||
SV | 06/24/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes BUILDING & CANOPY FOOTERS | |||||||||||
SV | 06/20/2003 | 08/10/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CANOPY & BUILDING | |||||||||||
SV | 06/20/2003 | 06/24/2003 | CARROLL_A | 0/2 | COMPLIANCE ASSURANCE | ||||||
SV | 06/18/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CANOPY | |||||||||||
SV | 06/18/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CANOPY | |||||||||||
SV | 05/20/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes AIR STILL ON LINES | |||||||||||
SV | 05/16/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes POURED CONCRETE | |||||||||||
SV | 05/14/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONCRETE FORMING | |||||||||||
SV | 05/13/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CHECK AIR ON REPAIRED SECONDARY #3 DISP LINER | |||||||||||
SV | 05/07/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REPAIRED SECONDARY BOOT ON #3 DISPENSER LINER | |||||||||||
SV | 05/02/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 05/01/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/30/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/29/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/24/2003 | 06/19/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/23/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/22/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL DISPENSER LINERS & PIPING | |||||||||||
SV | 04/17/2003 | 06/18/2003 | CARROLL_A | /3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALLING STP SUMPS & PUMPS | |||||||||||
SV | 04/15/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALLING PIPE/RISER | |||||||||||
SV | 04/11/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FINISHED STRAPPING TANKS TO DEADMAN - BACK FILLING AROUND TANKS | |||||||||||
SV | 04/09/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INSTALL TANK IN EXCAVATION | |||||||||||
SV | 04/06/2003 | 06/18/2003 | CARROLL_A | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes EXCAVATING FOR NEW TANKS | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 10/26/2023 | Satisfied | MCARTOR_H_1 | Incident | |||||||
Letter | 10/26/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 10/26/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Incident | 10/26/2023 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Site Inspection | 09/26/2023 | Major Out of Compliance | LAUGHLIN_MT_1 | 0/2 | Routine Compliance | ||||||
Letter | 09/26/2023 | Satisfied | LAUGHLIN_MT_1 | Compliance Assistance | |||||||
Electronic Communication | 08/18/2023 | Satisfied | LAUGHLIN_MT_1 | Compliance Assistance | |||||||
Letter | 08/31/2022 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Enforcement Tracking | 08/31/2022 | Closed Without Enforcement | MCKINLEY_D | Enforcement | |||||||
Letter | 08/11/2022 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Enforcement Referral | 05/23/2022 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 12/15/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Site Inspection | 12/13/2021 | Major Out of Compliance | MCKINLEY_DN_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/13/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Letter | 01/31/2020 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Discharge Reporting | 01/03/2020 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Letter | 12/13/2019 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Site Inspection | 12/13/2019 | Minor Out of Compliance | MONDO_PW_1 | 0/2 | Discharge | ||||||
Letter | 11/07/2019 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Document Management | 11/04/2019 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Site Inspection | 10/18/2019 | Minor Out of Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 10/18/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Letter | 10/18/2019 | Satisfied | LUNN_RJ_1 | Compliance Assistance | |||||||
Electronic Communication | 09/20/2017 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Incident | 09/20/2017 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Letter | 09/18/2017 | Satisfied | WESTERMAN_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/18/2017 | Minor Out of Compliance | WESTERMAN_ML_1 | 0/2 | Compliance Assistance | ||||||
Letter | 06/28/2017 | Satisfied | RICHARDS_JE_1 | Compliance Assistance | |||||||
Letter | 04/12/2017 | Satisfied | SPIRKO_LS_1 | Non-Compliance | |||||||
Site Inspection | 04/11/2017 | Minor Out of Compliance | SPIRKO_LS_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/11/2017 | Satisfied | SPIRKO_LS_1 | Routine Compliance | |||||||
Electronic Communication | 03/30/2017 | Satisfied | SPIRKO_LS_1 | Routine Compliance | |||||||
Electronic Communication | 02/28/2017 | Satisfied | SPIRKO_LS_1 | Routine Compliance | |||||||
Incident | 06/08/2016 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Document Management | 04/08/2016 | Complete | RICHARDS_JE_1 | Incident | |||||||
Electronic Communication | 02/16/2016 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Site Inspection | 02/16/2016 | In Compliance | LUNN_RJ_1 | 0/2 | Non-Compliance | ||||||
Phone Conversation | 12/23/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 09/25/2015 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Electronic Communication | 06/29/2015 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 06/29/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Electronic Communication | 06/25/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 06/24/2015 | Minor Out of Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/31/2012 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Discharge Reporting | 11/01/2012 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Site Inspection | 10/10/2012 | In Compliance | LUNN_RJ_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 10/09/2012 | In Compliance | LUNN_RJ_1 | 0/1 | Discharge | ||||||
Letter | 10/08/2012 | Satisfied | RICHARDS_JE_1 | Discharge | |||||||
Document Management | 10/05/2012 | Complete | RICHARDS_JE_1 | Discharge | |||||||
Electronic Communication | 06/06/2011 | Satisfied | BORISADE_KA_1 | Non-Compliance | |||||||
Letter | 05/27/2011 | Satisfied | BORISADE_KA_1 | Non-Compliance | |||||||
Site Inspection | 05/25/2011 | Minor Out of Compliance | BORISADE_KA_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/24/2011 | Satisfied | BORISADE_KA_1 | Routine Compliance | |||||||
Issue Document | 02/10/2010 | Satisfied | WILLIAMS_EM_1 | Non-Compliance | |||||||
Site Inspection | 02/08/2010 | In Compliance | SPEARS_CV_1 | 0/2 | Non-Compliance | ||||||
Letter | 01/27/2010 | Minor Out of Compliance | GRIFFIN_TW_1 | Non-Compliance | |||||||
Site Inspection | 01/25/2010 | Minor Out of Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 01/28/2009 | In Compliance | SPEARS_CV_1 | 0/2 | Non-Compliance | ||||||
Letter | 01/21/2009 | Satisfied | SPEARS_CV_1 | Non-Compliance | |||||||
Site Inspection | 01/21/2009 | Minor Out of Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/13/2009 | Satisfied | SPEARS_CV_1 | Routine Compliance | |||||||
Site Inspection | 01/22/2008 | In Compliance | SPEARS_CV_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/22/2008 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Site Inspection | 06/18/2007 | In Compliance | GRIFFIN_TW_1 | 0/2 | Non-Compliance | ||||||
Letter | 04/24/2007 | Satisfied | GRIFFIN_TW_1 | Non-Compliance | |||||||
Site Inspection | 04/24/2007 | Major Out of Compliance | GRIFFIN_TW_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
TCAR | 10/03/2006 | Satisfied | GRIFFIN_TW_1 | Closure | |||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | CARROLL_A | Routine Compliance | |||||||
Site Inspection | 06/23/2006 | In Compliance | LUNN_RJ_1 | 0/2 | Closure | ||||||
Site Inspection | 06/23/2006 | In Compliance | LUNN_RJ_1 | 0/2 | Installation | ||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/31/2019 | ACTIVE | McIntosh, Allene | 9046301212 | ||||||||
10/04/2012 | INACTIVE | 41 | McIntosh, Allene | 9046301212 | |||||||