DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 04/19/2025        Last Data Refresh: 04/18/2025        Report Generated from DOPPLER
 
District Southwest   Type    Fuel user/Non-retail
 
County Polk   Status    OPEN
 
ID 9807387   Latitude    28° 10' 6.8724
 
Name ORLAMPA, INC.
1400 BROADWAY BLVD SE
Longitude    81° 48' 33.557
  POLK CITY, FL 33868-9109 LL Method    DPHO
 
Contact EDITH TINGLEY   LL Status    REVIEWED
 
Phone (863) 874-5406   Status Date    06/28/2021
 
Account Owner Information
 
Name ORLAMPA, INC
1400 BROADWAY BLVD SE
POLK CITY, FL 33868
Effective Date    06/13/2005
 
Contact SARA JO SMITH
 
Phone (863) 874-5406
 
Email SSMITH@FANTASYOFFLIGHT.COM
  Placard # / Date    702277 - 10/16/2024
No Property Owner Information Found
 
 
Tank Tank Size Content Installed Placement Status
1 2000 Aviation Gas (E) 06/01/2005 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) External protective coating
(I) Suction piping system
(K) Dispenser liners
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   COMMERCE & INDUSTRY
INSURANCE   12/06/2017 12/06/2018 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   12/06/2015 12/06/2016 AIG
INSURANCE   12/06/2014 12/06/2015 COMMERCE & INDUSTRY
INSURANCE   12/06/2011 12/06/2012 COMMERCE & INDUSTRY
INSURANCE   12/06/2010 12/06/2011 COMMERCE & INDUSTRY
INSURANCE   12/06/2009 12/06/2010 AIG
INSURANCE   12/06/2008 12/06/2009 COMMERCE & INDUSTRY
 
 
No Legacy Data Found
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 06/01/2021 Major Out of Compliance CASSELS_CR_2 1/0 Routine Compliance
 
Electronic Communication 06/01/2021 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 06/01/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Electronic Communication 06/01/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Letter 06/01/2021 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 10/12/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Electronic Communication 10/12/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Letter 10/12/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Electronic Communication 10/11/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Electronic Communication 10/04/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Electronic Communication 09/18/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Letter 09/18/2018 Satisfied WILLIAMSON_KE_1 Compliance Assistance
 
Site Inspection 09/18/2018 Major Out of Compliance WILLIAMSON_KE_1 1/0 Routine Compliance
 
Electronic Communication 08/16/2018 Satisfied WILLIAMSON_KE_1 Routine Compliance
 
Site Inspection 08/11/2016 In Compliance GLENN_LE_1 1/0 Routine Compliance
 
Electronic Communication 08/11/2016 Satisfied GLENN_LE_1 Routine Compliance
 
Electronic Communication 06/24/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Electronic Communication 06/24/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Electronic Communication 06/24/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Electronic Communication 05/18/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Site Inspection 03/18/2015 Major Out of Compliance MERRYMAN_DT_1 1/0 Routine Compliance
 
Letter 03/18/2015 Satisfied JARRETT_SE_1 Non-Compliance
 
Site Inspection 12/30/2011 In Compliance WINN_JP_1 1/0 Routine Compliance
 
Site Inspection 01/18/2011 In Compliance SLAPPEY_WR_1 1/0 Routine Compliance
 
Site Inspection 02/12/2010 In Compliance CASSELS_CR_1 1/0 Non-Compliance
 
Electronic Communication 02/10/2010 Satisfied CASSELS_CR_1 Non-Compliance
 
Letter 12/23/2009 Satisfied CASSELS_CR_1 Non-Compliance
 
Site Inspection 12/23/2009 Major Out of Compliance CASSELS_CR_1 1/0 Routine Compliance
 
Phone Conversation 12/18/2009 Satisfied CASSELS_CR_1 Routine Compliance
 
Site Inspection 01/28/2009 In Compliance DERY_WC_1 1/0 Routine Compliance
 
Phone Conversation 01/22/2009 Satisfied DERY_WC_1 Routine Compliance
 
Enforcement Tracking 10/20/2008 Closed With Enforcement MARSH_L Enforcement
 
Record Document 03/12/2008 Satisfied NEWBERG_DR_1 Non-Compliance
 
Phone Conversation 03/05/2008 Satisfied NEWBERG_DR_1 Routine Compliance
 
Letter 02/21/2008 Satisfied NEWBERG_DR_1 Non-Compliance
 
Site Inspection 02/21/2008 Minor Out of Compliance NEWBERG_DR_1 1/0 Routine Compliance
 
Enforcement Referral 01/31/2008 Accepted MARSH_L Enforcement
 
Record Document 09/14/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Meeting 07/20/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Letter 07/13/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Letter 07/13/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Site Inspection 04/17/2007 In Compliance CASSELS_CR_1 1/0 Non-Compliance
 
Phone Conversation 04/10/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Issue Document 03/14/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Record Document 02/26/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Record Document 01/18/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Issue Document 01/18/2007 Satisfied CASSELS_CR_1 Non-Compliance
 
Enforcement Referral Activity - OLD 12/04/2006 Terminated CULBRETH_L Enforcement
 
Site Inspection 12/01/2006 Major Out of Compliance CASSELS_CR_1 1/0 Installation
 
Site Inspection 12/01/2006 Major Out of Compliance CASSELS_CR_1 1/0 Routine Compliance
 
Record Document 11/09/2006 Satisfied CASSELS_CR_1 Non-Compliance
 
Issue Document 11/09/2006 Satisfied CASSELS_CR_1 Non-Compliance
 
Phone Conversation 11/03/2006 Satisfied CASSELS_CR_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
05/03/2021 5011 SNC-B 1.6 Failure to maintain and demonstrate financial responsibility. Copies of all required documents, which includes the full policy and the appropriate DEP Form Part completed by an authorized representative of the insurance company for the type of FR mechanism used, of each policy for the 2018-2019, 2019-2020, and 2020-2021 periods, must be submitted to the Department.
 
05/03/2021 5003 Minor 1.3 Following owner change or discovery of unregistered facility, Registration Form not submitted. The information can be updated using DEP's electronic self-service application portal here: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration. Or alternatively, a Storage Tank Facility Registration Form can be completed with the updated information and submitted to TankRegistration@FloridaDEP.gov. Submit information showing updates when completed.
 
05/03/2021 5127 Minor 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. The peeling paint and corrosion should be cleaned and removed, and the areas re-coated with a rust inhibitive paint to maintain corrosion protection. The Department must be notified when the work is completed.
 
05/03/2021 5114 Minor 3.4 Shop fabricated storage tank system has a not repaired component which has or could cause a release or discharge. The spill containment tray must be liquid tight. A liquid tight, petroleum resistant, plug or valve must be installed in the hole in the spill containment tray, and the Department notified.
 
05/03/2021 5042 SNC-B 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. If any records are available, copies must be submitted to the Department. If the test has not been performed, the test must be performed immediately with a copy of the results submitted to the Department. Please note, the designated primary overfill protection equipment must be tested for operability annually at intervals not exceeding 12 months to ensure proper operation.
 
05/03/2021 5012 Minor 1.7 Incomplete documentation demonstrating financial responsibility. A DEP Certification of Financial Responsibility (CFR) Form Part P must be completed by facility personnel for each policy period of the Financial Responsibility. A CFR Form Part P must be completed for the 2018-2019, 2019-2020, and 2020-2021 policy periods and copies submitted to the Department.
 
 
 
No Discharges Found