![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 9808093 | Latitude | 30° 16' 55.8433 | ||||||||
Name |
MURHPY USA #7336 4100 PHILLIPS HWY |
Longitude | 81° 37' 48.4412 | ||||||||
JACKSONVILLE, FL 32207 | LL Method | DPHO | |||||||||
Contact | CARLOS GUTIERREZ | LL Status | REVIEWED | ||||||||
Phone | (904) 367-4287 | Status Date | 04/14/2015 | ||||||||
Account Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 05/12/2006 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Placard # / Date | 679988 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 08/27/2012 | ||||||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||||||
Phone | (870) 677-6116 | ||||||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 20000 | Unleaded Gas (B) | 04/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 20000 | Vehicular Diesel (D) | 04/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2023 | 04/30/2024 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 04/30/2022 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2020 | 04/30/2021 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2017 | 04/30/2018 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2016 | 04/30/2017 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 04/30/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 04/30/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2012 | 04/30/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2010 | 04/30/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2009 | 04/30/2010 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2008 | 04/30/2009 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 03/25/2025 | Closed Without Enforcement | STERLING_C | Enforcement | |||||||
Enforcement Referral | 12/20/2024 | Accepted | AMES_J | Enforcement | |||||||
Electronic Communication | 12/09/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 11/06/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 10/14/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Letter | 09/10/2024 | Satisfied | SORIANO_JC_1 | Compliance Assistance | |||||||
Site Inspection | 09/10/2024 | Major Out of Compliance | SORIANO_JC_1 | 0/2 | Routine Compliance | ||||||
Letter | 08/08/2024 | Satisfied | STERLING_C | Enforcement | |||||||
Electronic Communication | 08/08/2024 | Satisfied | SORIANO_JC_1 | Compliance Assistance | |||||||
Enforcement Referral | 11/28/2023 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 04/24/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/15/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Electronic Communication | 03/03/2023 | Satisfied | MCARTOR_H_1 | Compliance Assistance | |||||||
Site Inspection | 12/30/2022 | Major Out of Compliance | JORDAN_SL_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/30/2022 | Satisfied | JORDAN_SL_1 | Compliance Assistance | |||||||
Electronic Communication | 12/01/2022 | Satisfied | JORDAN_SL_1 | Routine Compliance | |||||||
Enforcement Tracking | 05/26/2021 | Closed Without Enforcement | COLE_K | Enforcement | |||||||
Letter | 05/26/2021 | Satisfied | COLE_K | Enforcement | |||||||
Letter | 04/08/2021 | Satisfied | COLE_K | Enforcement | |||||||
Enforcement Referral | 03/12/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 02/25/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 02/25/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 02/24/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Phone Conversation | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Electronic Communication | 12/22/2020 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Letter | 12/14/2020 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Site Inspection | 12/11/2020 | Major Out of Compliance | AUSTIN_JH_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/10/2020 | Satisfied | AUSTIN_JH_1 | Routine Compliance | |||||||
Site Inspection | 08/28/2018 | In Compliance | WESTERMAN_ML_1 | 0/2 | Routine Compliance | ||||||
Letter | 08/28/2018 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Electronic Communication | 08/20/2018 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Electronic Communication | 09/12/2016 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Site Inspection | 09/12/2016 | In Compliance | MONDO_PW_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/11/2016 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Electronic Communication | 09/15/2014 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Site Inspection | 09/12/2014 | In Compliance | WILLIAMS_AK_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/29/2014 | Satisfied | WILLIAMS_AK_1 | Routine Compliance | |||||||
Incident | 09/05/2013 | Has not led to Discharge | RICHARDS_JE_1 | Incident | |||||||
Document Management | 07/31/2013 | Complete | RICHARDS_JE_1 | Incident | |||||||
Document Management | 08/30/2012 | Complete | KOROUS_E_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 08/22/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Electronic Communication | 08/22/2012 | Satisfied | KOROUS_E_1 | Routine Compliance | |||||||
Site Inspection | 08/22/2012 | In Compliance | KOROUS_E_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/23/2011 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/25/2010 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 03/25/2009 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/24/2007 | Satisfied | HOLLOWAY_RW_1 | Routine Compliance | |||||||
Site Inspection | 10/24/2007 | In Compliance | HOLLOWAY_RW_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 10/23/2006 | Satisfied | GRIFFIN_TW_1 | Routine Compliance | |||||||
Site Inspection | 09/15/2006 | In Compliance | LUNN_RJ_1 | 0/2 | Installation | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/09/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Facility to abate corrosion and provide documentation to EQD Inspector. Violation to be Cited. | |||||||
No Discharges Found |