![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Fuel user/Non-retail | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9809196 | Latitude | 25° 47' 27.5719 | ||||||||
Name |
EQUIPMENT BLDG-CROSSROADS C & D 11410 NW 20TH ST |
Longitude | 80° 22' 54.5571 | ||||||||
MIAMI, FL 33172-1847 | LL Method | DPHO | |||||||||
Contact | ARTURO L FERNANDEZ | LL Status | REVIEWED | ||||||||
Phone | (305) 607-7963 | Status Date | 08/17/2017 | ||||||||
Account Owner Information | |||||||||||
Name | DOLPHIN PARK TT, LLC 11410 NW 20TH STREET SWEETWATER, FL 33172 |
Effective Date | 06/25/2020 | ||||||||
Contact | MONIQUE BARDINO | ||||||||||
Phone | (954) 900-6055 | ||||||||||
MBARDINO@LPC.COM | |||||||||||
Placard # / Date | 700271 - 07/27/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | DOLPHIN PARK TT, LLC 11410 NW 20TH STREET SWEETWATER, FL 33172 |
Effective Date | 06/25/2020 | ||||||||
Contact | MONIQUE BARDINO | ||||||||||
Phone | (954) 900-6055 | ||||||||||
MBARDINO@LPC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Emerg Generator Diesel (G) | 04/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Emerg Generator Diesel (G) | 04/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Emerg Generator Diesel (G) | 04/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Emerg Generator Diesel (G) | 04/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 03/15/2020 | 03/15/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 06/23/2017 | 06/23/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/22/2016 | 06/22/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/22/2015 | 06/22/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/23/2014 | 06/23/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/23/2013 | 06/23/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/23/2012 | 06/23/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/23/2011 | 06/23/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/23/2009 | 06/23/2010 | ILLINOIS UNION | ||||||||
NONE | 06/16/2009 | 06/15/2009 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 01/31/2025 | Major Out of Compliance | MATUTERODRIGUEZ_MA_1 | 4/0 | Routine Compliance | ||||||
Phone Conversation | 01/31/2025 | Satisfied | MATUTERODRIGUEZ_MA_1 | Routine Compliance | |||||||
Letter | 01/31/2025 | Satisfied | MATUTERODRIGUEZ_MA_1 | Compliance Assistance | |||||||
Letter | 08/04/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 08/03/2020 | In Compliance | GODWIN_MR_1 | 4/0 | Compliance Assistance | ||||||
Site Inspection | 07/07/2020 | Major Out of Compliance | GODWIN_MR_1 | 4/0 | Routine Compliance | ||||||
Letter | 07/07/2020 | Satisfied | GODWIN_MR_1 | Compliance Assistance | |||||||
Electronic Communication | 06/24/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 06/24/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 06/24/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Electronic Communication | 04/07/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Phone Conversation | 04/07/2020 | Satisfied | GODWIN_MR_1 | Routine Compliance | |||||||
Record Document | 08/21/2017 | Satisfied | CABRERA_VE_1 | Compliance Assistance | |||||||
Site Inspection | 08/21/2017 | In Compliance | CABRERA_VE_1 | 4/0 | Compliance Assistance | ||||||
Letter | 08/21/2017 | Satisfied | CABRERA_VE_1 | Compliance Assistance | |||||||
Electronic Communication | 08/17/2017 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 08/17/2017 | Minor Out of Compliance | CABRERA_VE_1 | 4/0 | Routine Compliance | ||||||
Electronic Communication | 08/07/2017 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Electronic Communication | 07/25/2017 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 06/08/2015 | In Compliance | DEZAYAS_A_1 | 4/0 | Routine Compliance | ||||||
Electronic Communication | 06/05/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 09/06/2013 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 09/06/2013 | In Compliance | RUNTE_C_3 | 4/0 | Non-Compliance | ||||||
Site Inspection | 07/16/2013 | Major Out of Compliance | RUNTE_C_3 | 4/0 | Routine Compliance | ||||||
Letter | 07/16/2013 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Phone Conversation | 07/15/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Site Inspection | 08/11/2011 | In Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Letter | 03/29/2011 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Site Inspection | 03/29/2011 | Major Out of Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Enforcement Tracking | 02/09/2010 | Closed Without Enforcement | PADRON_JE_1 | Enforcement | |||||||
Site Inspection | 06/16/2009 | Major Out of Compliance | PADRON_JE_1 | 4/0 | Routine Compliance | ||||||
Enforcement Referral | 06/16/2009 | Accepted | PADRON_JE_1 | Enforcement | |||||||
Letter | 06/16/2009 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Issue Document | 06/16/2009 | Satisfied | PADRON_JE_1 | Enforcement | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/31/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide the current and passing annual operability test of the overfill protection devices (high level sensor connected to Pneumercator LC1000) | |||||||
01/31/2025 | 7009 | SNC-B | 1.7 No financial responsibility instrument or expired instrument for < 180 days. | Provide the current certificate of financial responsibility. | |||||||
01/31/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide the current and passing annual operability test of the release detection devices (interstitial space sensor connected to Pneumercator LC1000) | |||||||
01/31/2025 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Provide monthly visual inspection logs. A form template will be provided to use as is or incorporate into the maintenance checklist. | |||||||
No Discharges Found |