![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Fuel user/Non-retail | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 9809358 | Latitude | 25° 47' 14.5159 | ||||||||
Name |
RAINFOREST FARMS AND BOUQUESTS USA INC 1480 NW 94TH AVE |
Longitude | 80° 20' 52.0094 | ||||||||
DORAL, FL 33172 | LL Method | DPHO | |||||||||
Contact | JULIO URREGO | LL Status | REVIEWED | ||||||||
Phone | (305) 675-8309 | Status Date | 09/05/2024 | ||||||||
Account Owner Information | |||||||||||
Name | TORRENO ROUTE 100 LLC 2121 PONCE DE LEON BLVD, SU#430 Coral Gables, FL 33134 |
Effective Date | 04/23/2020 | ||||||||
Contact | ANA OCASIO | ||||||||||
Phone | (786) 536-1617 | ||||||||||
ANA.OCASIO@FOUNDRYCOMMERCIAL.COM | |||||||||||
Placard # / Date | 700530 - 08/08/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | TORRENO ROUTE 100 LLC 2121 PONCE DE LEON BLVD, SU#430 Coral Gables, FL 33134 |
Effective Date | 11/09/2017 | ||||||||
Contact | ANA OCASIO | ||||||||||
Phone | (786) 536-1617 | ||||||||||
ANA.OCASIO@FOUNDRYCOMMERCIAL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Emerg Generator Diesel (G) | 05/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(I) Suction piping system (X) No piping associated w/tank |
(1) Continuous electronic sensing (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/01/2024 | 04/01/2025 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 04/01/2023 | 04/01/2024 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 04/01/2022 | 04/01/2023 | ALLIED WORLD ASSURANCE COMPANY (US), INC. | ||||||||
INSURANCE | 03/31/2019 | 04/01/2022 | ALLIED WORLD ASSURACE COMPANY (U.S.) INC | ||||||||
INSURANCE | 08/19/2018 | 08/19/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/19/2017 | 08/19/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/19/2016 | 08/19/2017 | ACE | ||||||||
INSURANCE | 08/18/2015 | 08/18/2016 | ACE | ||||||||
INSURANCE | 08/19/2014 | 08/19/2015 | ACE | ||||||||
INSURANCE | 08/19/2013 | 08/19/2014 | ACE | ||||||||
INSURANCE | 08/19/2012 | 08/19/2013 | ACE | ||||||||
INSURANCE | 09/01/2011 | 09/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/19/2010 | 08/19/2011 | ILLINOIS UNION | ||||||||
INSURANCE | 08/19/2008 | 08/19/2009 | ILLINOIS UNION | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 09/05/2024 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 09/05/2024 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 09/05/2024 | Major Out of Compliance | DEZAYAS_A_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 08/02/2024 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 03/08/2021 | In Compliance | SANPEDRO_A_2 | 1/0 | Compliance Assistance | ||||||
Letter | 03/08/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 03/08/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Letter | 01/21/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Site Inspection | 01/20/2021 | Major Out of Compliance | SANPEDRO_A_2 | 1/0 | Compliance Assistance | ||||||
Electronic Communication | 07/17/2020 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Letter | 03/19/2020 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 03/19/2020 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Site Inspection | 03/19/2020 | Major Out of Compliance | SANPEDRO_A_2 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 02/28/2020 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Site Inspection | 01/05/2017 | In Compliance | CABRERA_VE_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 01/05/2017 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Electronic Communication | 01/03/2017 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 02/02/2015 | In Compliance | LINCHETA_CR_1 | 1/0 | Routine Compliance | ||||||
Phone Conversation | 02/02/2015 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Site Inspection | 11/15/2012 | In Compliance | RUNTE_C_3 | 1/0 | Non-Compliance | ||||||
Site Inspection | 11/14/2012 | Major Out of Compliance | RUNTE_C_3 | 1/0 | Routine Compliance | ||||||
Site Inspection | 06/13/2012 | Major Out of Compliance | LINCHETA_CR_1 | 1/0 | Routine Compliance | ||||||
Letter | 06/13/2012 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Site Inspection | 02/22/2011 | In Compliance | LINCHETA_CR_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 02/17/2011 | Minor Out of Compliance | LINCHETA_CR_1 | 1/0 | Non-Compliance | ||||||
Letter | 02/17/2011 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Letter | 01/20/2011 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Site Inspection | 01/20/2011 | Major Out of Compliance | LINCHETA_CR_1 | 1/0 | Routine Compliance | ||||||
Enforcement Tracking | 06/17/2009 | Closed Without Enforcement | PADRON_JE_1 | Enforcement | |||||||
Site Inspection | 04/01/2009 | In Compliance | PADRON_JE_1 | 1/0 | Non-Compliance | ||||||
Issue Document | 02/19/2009 | Satisfied | PADRON_JE_1 | Enforcement | |||||||
Enforcement Referral | 02/19/2009 | Accepted | PADRON_JE_1 | Enforcement | |||||||
Letter | 02/18/2009 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Site Inspection | 02/18/2009 | Minor Out of Compliance | PADRON_JE_1 | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/05/2024 | 7030 | Minor | 3.6 Exterior coatings not protected from external corrosion, deterioration or degradation. | Make necessary repairs to fix the heavy corrosion and pitting on the generator housing, and make necessary repairs to prevent water intrusion. | |||||||
09/05/2024 | 7013 | Minor | 3.4 Incident investigation leading to discharge not completed within 14 days, or No DRF or written confirmation received after 14 day investigation period. | Provide a detailed Incident Notification (INF) investigating the cause of the diesel fuel on top the Aboveground Storage Tank and the corrective actions taken to resolve the issue. | |||||||
09/05/2024 | 7031 | SNC-B | 3.1 Any component(s) of storage tank system not installed according to manufacturer's instructions. | Repair/replace generator hoses, filters, etc that are causing the diesel fuel drip onto the top of the AST. | |||||||
09/05/2024 | 7043 | Minor | 1.11 Fillbox covers not marked according to requirements. | Properly color code and label the fillport spill bucket as per API standards. | |||||||
09/05/2024 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Provide 36 months of the Monthly Maintenance Visual logs for the Aboveground Storage Tank. | |||||||
No Discharges Found |