![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Northwest | Type | Retail Station | ||||
County | Bay | Status | OPEN | ||||
ID | 9812861 | Latitude | 30° 13' 36.4259 | ||||
Name |
MURPHY USA #7479 2101 HWY 77 S |
Longitude | 85° 38' 55.3932 | ||||
LYNN HAVEN, FL 32444 | LL Method | DPHO | |||||
Contact | BRAD WEINISCHKE | LL Status | REVIEWED | ||||
Phone | (870) 918-4531 | Status Date | 09/13/2023 | ||||
Account Owner Information | |||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 09/15/2011 | ||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||
Phone | (870) 677-6116 | ||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||
Placard # / Date | 680008 - 06/05/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 20000 | Unleaded Gas (B) | 09/01/2011 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 20000 | Unleaded Gas (B) | 09/01/2011 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2024 | 04/30/2025 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2022 | 04/30/2023 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2020 | 04/30/2021 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2018 | 04/30/2019 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/27/2015 | 04/27/2016 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/30/2013 | 04/30/2014 | |||||
LETTER OF CREDIT | 05/30/2011 | 04/30/2012 | |||||
No Legacy Data Found | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Letter | 05/07/2025 | Satisfied | MILLS_KJ | Enforcement | |||
Enforcement Referral | 02/19/2025 | Accepted | GARTIN_D | Enforcement | |||
Electronic Communication | 01/08/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||
Letter | 10/28/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||
Site Inspection | 10/23/2024 | Major Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||
Electronic Communication | 10/22/2024 | Satisfied | GARTIN_D | Routine Compliance | |||
Document Management | 06/29/2023 | Satisfied | KHAN_MR_1 | Incident | |||
Record Document | 06/29/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Incident | 06/29/2023 | Has not led to Discharge | KHAN_MR_1 | Incident | |||
TCAR | 06/28/2023 | Satisfied | WILSON_ML_1 | Component Closure | |||
Document Management | 06/28/2023 | Satisfied | WILSON_ML_1 | Component Closure | |||
Letter | 06/28/2023 | Satisfied | WILSON_ML_1 | Component Closure | |||
Enforcement Referral | 05/02/2023 | Accepted | KHAN_MR_1 | Enforcement | |||
Document Management | 03/28/2023 | Satisfied | WILSON_ML_1 | Component Closure | |||
Letter | 03/28/2023 | Satisfied | WILSON_ML_1 | Component Closure | |||
Site Inspection | 01/25/2023 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Letter | 01/25/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Phone Conversation | 01/20/2023 | Satisfied | KHAN_MR_1 | Routine Compliance | |||
Enforcement Tracking | 08/18/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||
Enforcement Tracking | 08/18/2021 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||
Letter | 05/20/2021 | Satisfied | GILLMAN_M | Enforcement | |||
Enforcement Referral | 04/28/2021 | Accepted | KHAN_MR_1 | Enforcement | |||
Issue Document | 01/27/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Site Inspection | 01/27/2021 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Letter | 01/27/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Phone Conversation | 01/25/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||
Phone Conversation | 01/20/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||
Electronic Communication | 02/24/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||
Enforcement Referral | 01/24/2019 | Accepted | WILSON_ML_1 | Enforcement | |||
Site Inspection | 10/23/2018 | Major Out of Compliance | BROCK_SN_1 | 0/2 | Complaint | ||
Letter | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Issue Document | 07/30/2018 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||
Site Inspection | 07/27/2018 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Phone Conversation | 07/27/2018 | Satisfied | KHAN_MR_1 | Routine Compliance | |||
Site Inspection | 03/17/2016 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Emergency Preparedness Information | 03/04/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||
Site Inspection | 03/04/2014 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Site Inspection | 05/07/2012 | In Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||
Site Inspection | 02/28/2012 | In Compliance | BRAZILE_DO_1 | 0/2 | Installation | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
10/23/2024 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Have the non-ethanol premium spill buckets correctly colored to meet the standards noted by the April 2020 API Color-Symbol System... for this facility's fillbox cover. Please note this can be accomplished by a painted white circle or the circle E0 case markings similarly installed at other Murphy USA establishments. Send a photograph of the correctly colored fillbox lid with a copy of the work invoice, if applicable, to Daniel.Gartin@flhealth.gov. | |||
10/22/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Remove the liquid from the interstitial space in the diesel spill bucket and reinstall or replace the interstice gauge as needed. Test the integrity of the spill bucket prior to bringing it back into service. If the spill bucket is damaged, closure assessment/sampling will be required for the replacement bucket and contact Daniel.Gartin@flhealth.gov prior to beginning work. Forward copy of the testing results and summary of work completed to Daniel.Gartin@flhealth.gov. | |||
01/24/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified technician replace the Regular Spill Buckets. At the time of closure, closure sampling/assessment will be required and a Closure Report will be required within 60 days of the closure. Notification to the inspector is required a minimum of 30 days prior to closure/installation activities. Contact the inspector for the appropriate paperwork to be submitted for notification. Once replacement is completed, post-installation testing will need to be submitted. Email: Muhammad.Khan@flhealth.gov | |||
01/24/2023 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Complete and submit an INF for the failed integrity testing of the regular spill bucket to document the incident. Email the INF to the inspector. Email: Muhammad.Khan@flhealth.gov | |||
01/24/2023 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Conduct Closure Sampling for the replacement of the regular spill buckets that failed integrity testing on 04/28/2022 to determine if a discharge occurred. Once the investigation has been completed submit a Closure Assessment Report to this office for review. | |||
01/24/2023 | 6068 | SNC-B | 4.6 Storage tank system not closed within 90 days in accordance with subsection. | Submit a registration form registering the regular tank out of service due to repairs for the Regular Spill Bucket and the Regular STP Sump are over the 90 days to operate without repair. A waste manifest showing that the regular tank has been emptied will need to be submitted with the registration form to meet out of service requirements. Email: Muhammad.Khan@FLHealth.gov | |||
No Discharges Found |