DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 04/19/2025        Last Data Refresh: 04/18/2025        Report Generated from DOPPLER
 
District Southwest   Type    Fuel user/Non-retail
 
County Hillsborough   Status    CLOSED
 
ID 9812940   Latitude    27° 59' 49.2328
 
Name BUILDERS FIRST SOURCE
1602 INDUSTRIAL PARK DR
Longitude    82° 9' 38.8435
  PLANT CITY, FL 33566 LL Method    DPHO
 
Contact JERRY CHAMBERS   LL Status    REVIEWED
 
Phone (813) 621-9831   Status Date    06/22/2023
 
Account Owner Information
 
Name BUILDERS FIRST SOURCE
1602 INDUSTRIAL PARK DR
PLANT CITY, FL 33566
Effective Date    11/17/2011
 
Contact KIM BAKER
 
Phone (813) 267-2787
 
Email KIM.BAKER@BLDR.COM
  Placard # / Date    617950 - 07/09/2021
No Property Owner Information Found
 
 
Tank Tank Size Content Installed Placement Status
1 1000 Vehicular Diesel (D) 11/01/2011 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (B) Steel/galvanized metal (F) Monitor dbl wall tank space
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   03/02/2020 03/02/2021 ALLIED WORLD ASSURACE COMPANY (U.S.) INC
INSURANCE   03/02/2019 03/02/2020 ALLIED WORLD ASSURACE COMPANY (U.S.) INC
GUARANTEE   01/30/2018 01/30/2019 INDIAN HARBOR INSURANCE COMPANY
INSURANCE   07/21/2015 07/21/2016 COMMERCE & INDUSTRY
GUARANTEE   12/31/2014 01/30/2018 INDIAN HARBOR INSURANCE COMPANY
INSURANCE   07/21/2014 07/21/2015 COMMERCE & INDUSTRY
INSURANCE   07/21/2013 07/21/2014 COMMERCE & INDUSTRY
INSURANCE   07/21/2011 07/21/2012 COMMERCE & INDUSTRY
 
 
No Legacy Data Found
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Phone Conversation 01/12/2021 Satisfied ROJAS_Y_1 Routine Compliance
 
Letter 01/12/2021 Satisfied ROJAS_Y_1 Compliance Assistance
 
Site Inspection 01/12/2021 Major Out of Compliance ROJAS_Y_1 1/0 Routine Compliance
 
Enforcement Referral 08/08/2019 Accepted MOSELEY_AJ_1 Enforcement
 
Enforcement Tracking 08/08/2019 Closed Without Enforcement PONS_P_1 Enforcement
 
Electronic Communication 08/08/2019 Satisfied PONS_P_1 Enforcement
 
Record Document 07/01/2019 Satisfied JONES_K_11 Compliance Assistance
 
Letter 07/01/2019 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 12/20/2018 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 12/20/2018 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 11/27/2018 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 11/20/2018 Satisfied JONES_K_11 Routine Compliance
 
Electronic Communication 11/20/2018 Satisfied JONES_K_11 Routine Compliance
 
Electronic Communication 10/09/2018 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 10/09/2018 Satisfied JONES_K_11 Compliance Assistance
 
Electronic Communication 09/25/2018 Satisfied JONES_K_11 Routine Compliance
 
Letter 09/25/2018 Satisfied JONES_K_11 Compliance Assistance
 
Site Inspection 09/25/2018 Major Out of Compliance JONES_K_11 1/0 Routine Compliance
 
Record Document 09/21/2018 Satisfied JONES_K_11 Routine Compliance
 
Electronic Communication 09/20/2018 Satisfied JONES_K_11 Routine Compliance
 
Electronic Communication 09/20/2018 Satisfied JONES_K_11 Routine Compliance
 
Phone Conversation 09/18/2018 Satisfied JONES_K_11 Routine Compliance
 
Document Management 05/18/2016 Complete MOSELEY_AJ_1 Routine Compliance
 
Site Inspection 05/18/2016 In Compliance MOSELEY_AJ_1 1/0 Routine Compliance
 
Electronic Communication 05/18/2016 Satisfied MOSELEY_AJ_1 Routine Compliance
 
Phone Conversation 05/17/2016 Satisfied MOSELEY_AJ_1 Routine Compliance
 
Electronic Communication 03/29/2016 Satisfied MOSELEY_AJ_1 Routine Compliance
 
Record Document 12/05/2013 Satisfied HAMBY_MB_1 Non-Compliance
 
Record Document 12/04/2013 Satisfied HAMBY_MB_1 Non-Compliance
 
Site Inspection 11/27/2013 Major Out of Compliance HAMBY_MB_1 1/0 Routine Compliance
 
Letter 11/27/2013 Satisfied HAMBY_MB_1 Non-Compliance
 
Site Inspection 12/15/2011 In Compliance HAMBY_MB_1 1/0 Installation
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/12/2021 5094 SNC-B 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. Perform monthly inspection and submit monthly inspection logs for January 2021 and February 2021 to EPC upon completion.
 
01/12/2021 5042 SNC-B 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. Immediately perform operability testing of the primary overfill protection device and submit testing results to EPC upon completion.
 
01/12/2021 5003 Minor 1.3 Following owner change or discovery of unregistered facility, Registration Form not submitted. Submit an updated Storage Tank Registration Form to EPC.
 
01/12/2021 5102 Minor 3.3 Shop fabricated storage tank system release detection devices not tested annually. Immediately perform operability testing of the release detection device and submit testing results to EPC upon completion.
 
 
 
No Discharges Found