![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||
District | Southwest | Type | Retail Station | ||||
County | Polk | Status | OPEN | ||||
ID | 9813038 | Latitude | 28° 0' 44.9353 | ||||
Name |
MURPHY EXPRESS #8680 US HWY 17 |
Longitude | 81° 43' 52.2225 | ||||
WINTER HAVEN, FL 33884 | LL Method | DPHO | |||||
Contact | STORE MGR | LL Status | REVIEWED | ||||
Phone | (870) 875-6854 | Status Date | 01/25/2024 | ||||
Account Owner Information | |||||||
Name | MURPHY OIL USA INC 200 PEACH ST El Dorado, AR 71730 |
Effective Date | 02/09/2012 | ||||
Contact | KRYSTAL TERRELL /JENNIFER BRIDGES /BRAD WEINISCHKE | ||||||
Phone | (870) 677-6116 | ||||||
KRYSTAL.TERRELL@MURPHYUSA.COM | |||||||
Placard # / Date | 680011 - 06/05/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 20000 | Unleaded Gas (B) | 03/01/2012 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 20000 | Unleaded Gas (B) | 03/01/2012 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (Z) DEP approved piping |
(A) Site Suitability Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (P) Vapor monitoring w/dilution |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 01/01/2021 | 04/30/2022 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2019 | 04/30/2020 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2017 | 04/30/2018 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2016 | 04/30/2017 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2015 | 04/30/2016 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2014 | 04/30/2015 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2013 | 04/30/2014 | |||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 05/01/2012 | 04/30/2013 | |||||
No Legacy Data Found | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Electronic Communication | 07/15/2022 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||
Electronic Communication | 07/15/2022 | Satisfied | CASSELS_CR_2 | Routine Compliance | |||
Letter | 07/15/2022 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||
Site Inspection | 07/14/2022 | Major Out of Compliance | CASSELS_CR_2 | 0/2 | Routine Compliance | ||
Electronic Communication | 07/13/2022 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 08/13/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 07/23/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 07/13/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 06/05/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 06/05/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||
Letter | 06/05/2019 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||
Electronic Communication | 06/05/2019 | Satisfied | GLENN_LE_1 | Routine Compliance | |||
Site Inspection | 06/04/2019 | Major Out of Compliance | GLENN_LE_1 | 0/2 | Routine Compliance | ||
Enforcement Tracking | 10/12/2017 | Closed Without Enforcement | KENNEDY_S | Enforcement | |||
Letter | 10/12/2017 | Satisfied | KENNEDY_S | Enforcement | |||
Electronic Communication | 10/11/2017 | Satisfied | KENNEDY_S | Enforcement | |||
Electronic Communication | 10/06/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||
Electronic Communication | 10/06/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||
Letter | 10/06/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||
Electronic Communication | 10/02/2017 | Satisfied | KENNEDY_S | Enforcement | |||
Electronic Communication | 10/02/2017 | Satisfied | KENNEDY_S | Enforcement | |||
Electronic Communication | 10/01/2017 | Satisfied | KENNEDY_S | Enforcement | |||
Enforcement Referral | 08/21/2017 | Accepted | WILLIAMSON_KE_1 | Enforcement | |||
Letter | 08/07/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||
Site Inspection | 08/07/2017 | Major Out of Compliance | WILLIAMSON_KE_1 | 0/2 | Compliance Assistance | ||
Electronic Communication | 08/07/2017 | Satisfied | WILLIAMSON_KE_1 | Compliance Assistance | |||
Electronic Communication | 03/17/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||
Letter | 03/17/2017 | Satisfied | WILLIAMSON_KE_1 | Non-Compliance | |||
Site Inspection | 03/17/2017 | Major Out of Compliance | WILLIAMSON_KE_1 | 0/2 | Routine Compliance | ||
Phone Conversation | 01/26/2017 | Satisfied | WILLIAMSON_KE_1 | Routine Compliance | |||
Electronic Communication | 12/04/2015 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||
Site Inspection | 12/04/2015 | In Compliance | MERRYMAN_DT_1 | 0/2 | Non-Compliance | ||
Electronic Communication | 05/18/2015 | Satisfied | MERRYMAN_DT_1 | Non-Compliance | |||
Site Inspection | 04/30/2015 | Minor Out of Compliance | MERRYMAN_DT_1 | 0/2 | Routine Compliance | ||
Letter | 04/30/2015 | Satisfied | JARRETT_SE_1 | Non-Compliance | |||
Issue Document | 06/27/2013 | Satisfied | WINN_JP_1 | Routine Compliance | |||
Site Inspection | 06/27/2013 | In Compliance | WINN_JP_1 | 0/2 | Routine Compliance | ||
Site Inspection | 01/11/2013 | In Compliance | WINN_JP_1 | 0/2 | Installation | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
07/14/2022 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Submit an Incident Notification Form for the regular and premium STP sumps that failed an Integrity (hydro) test on 02/26/2020. | |||
07/14/2022 | 6048 | SNC-B | 4.4 Dispenser sumps not installed to allow for release detection. | The dispenser liner footprint must be large enough to encompass all dispenser mechanisms above it, in case of leakage, or a device must be installed to divert any leaking product into the liner, and the Department notified. | |||
07/14/2022 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Monthly visual inspections and monthly electronic monitoring records, including printing the Alarm History Report for all release detection sensors, must be performed monthly at intervals not exceeding 35 days, with records maintained for three years. The bi-annual inspections of all STP and dispenser sumps must be performed every six months, with records maintained for three years. Submit copies of any missing records, if available, or copies of the next two months visual and electronic monitoring records and the next one bi-annual inspection must be submitted to the Department. | |||
07/14/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The corrosion must be removed and the STPs, STP risers, steel piping and other components treated and re-coated to maintain corrosion protection. | |||
07/14/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | The dirt, debris and staining must be cleaned out of the dispenser sumps to ensure a thorough inspection can be made and the Department notified. | |||
07/14/2022 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Determine what is the current equipment installed and update the Facility registration information accordingly to reflect the current, accurate tank system components. | |||
07/14/2022 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Documentation must be provided to show an investigation was performed for the regular and premium STP sumps that failed an Integrity (hydro) test on 02/26/2020, or an Incident Notification Form must be submitted and an investigation performed to determine that a discharge did not occur. | |||
07/14/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | The regular and premium STP sumps must be repaired and re-tested immediately, or the component must be taken out of service. If the work has been done, copies of the work orders and integrity tests must be submitted to the Department. | |||
07/14/2022 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | If an investigation of the fuel alarms on the Veeder-Root monitoring system was completed, copies of the results must be submitted to the Department, or an Incident Notification Form must be submitted and an investigation performed to determine the cause of the alarms with the results submitted to the Department. | |||
07/14/2022 | 6030 | SNC-B | 4.2 Any component(s) of storage tank system not installed according to reference standards. | Submit a work order stating the ball float was removed when the flow shutoff valve was installed, or if the work has not been done, either the ball float or the drop tube valve must be removed, with the remaining device achieving a passing operability test. Determine what is the current equipment installed and update the Facility registration information accordingly to reflect the current, accurate tank system components. | |||
07/14/2022 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | An Incident Notification Form (INF) must be submitted for the fuel alarms on the Veeder-Root system unless an investigation is completed within 72 hours to determine a discharge did not occur. An INF must be submitted to the Department for the fuel alarms. | |||
06/04/2019 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | Bi-annual visual inspection records for 10/2017 to 04/2018 must be provided to the Department or the next bi-annual inspection must be provided to the Department. | |||
06/04/2019 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Proof of Financial Responsibility for the 05/01/2018 to 05/01/2019 coverage period must be provided to the Department. | |||
06/04/2019 | 4015 | Minor | 2.10 Incomplete documentation demonstrating financial responsibility. | Financial Responsibility Mechanism Part A must be completed by the Financial Officer and a CFR-Part P form must be completed by facility personnel and copies provided to the Department. | |||
No Discharges Found |